<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong><br />

3.02 DELIVERY AND STORAGE<br />

A. Deliver in original unopened packages and store in enclosed shelter; protect from damage and<br />

exposure to direct sunlight. Remove damaged or deteriorated materials from premises.<br />

3.03 BATT INSTALLATION<br />

A. Install insulation in accordance with manufacturer's instructions.<br />

B. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids.<br />

C. Fit insulation tightly in cavities and tightly to exterior side of mechanical and electrical services<br />

within the plane of the insulation.<br />

3.04 BOARD INSTALLATION<br />

A. Insulate interior face of exterior concrete foundation, including returns under floor slab as<br />

indicated on the drawings. Provide complete insulation membrane around entire building<br />

whether specifically indicated or not.<br />

B. Mechanically fasten insulation boards to substrate at NRCA, UL or FM required spacing,<br />

whichever is more stringent.<br />

C. Apply insulation boards parallel to roof perimeter edges.<br />

D. Lay second layer of insulation with joints staggered from first layer<br />

E. Lay insulation boards with edges in moderate contact without forcing. Cut insulation to fit neatly<br />

to perimeter blocking and around penetrations through roof.<br />

F. Apply no more insulation than can be sealed with membrane in same day.<br />

G. Keep insulation a minimum of 3 inches from heat emitting devices, and a minimum 2 inches<br />

from sidewalls.<br />

H. Install after building embankment and granular cushion have been completed and vapor<br />

retarder is in place. Lay insulation in place, edges closely pressed together, against inside face<br />

of foundation beam excavation; returned under floor slab as shown on the drawings. Pour<br />

concrete to cover insulation.<br />

3.05 PROTECTION OF FINISHED WORK<br />

A. Do not permit installed insulation to be damaged prior to its concealment.<br />

3.06 CLEAN-UP<br />

A. Upon completion of work of this section, remove related debris from premises.<br />

END OF SECTION<br />

03/09/10 BOARD AND BATT INSULATION<br />

07212 -3