Undiluted Reserves at $550 per Ounce Gold<br />

Overburden Tonnes 12,100,000<br />

Oxide Below 0.15 g/tonne* 11,100,000<br />

Subtotal, Waste Rock 23,200,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 40,000,000 0.53 680,000 0.15 35,000 0.32 400<br />

Undiluted Reserves at $625 per Ounce Gold<br />

Overburden Tonnes 14,900,000<br />

Oxide Below 0.15 g/tonne* 13,300,000<br />

Subtotal, Waste Rock 28,200,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 46,800,000 0.50 752,000 0.15 <strong>101</strong>,000 0.32 1,000<br />

Undiluted Reserves at $700 per Ounce Gold<br />

Overburden Tonnes 23,700,000<br />

Oxide Below 0.15 g/tonne* 19,600,000<br />

Subtotal, Waste Rock <strong>43</strong>,300,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 58,400,000 0.46 870,000 0.15 131,000 0.30 1,300<br />

* This material must be mined but does not meet the processing cut-off.<br />

Mineral Processing and Metallurgical Testing<br />

Several metallurgical tests on mineralized oxidized material from the Property have been completed, both<br />

by Castle Gold and by independent groups between 2004 and 2006. <strong>The</strong> tests were designed to determine<br />

the leaching characteristics of the oxidized material and consisted of:<br />

• Bottle roll leach tests in 2004 and later column leach tests in 2006 by Kappes, Cassiday and<br />

Associates (“KCA”);<br />

• Two onsite bulk heap leach tests conducted by Castle Gold in 2005, followed by a residual<br />

analysis of the heaps conducted by Metcon Research (“Metcon”) in 2006.<br />

<strong>The</strong> data from the various tests have been reviewed and vetted by, D. Koningen, P.Eng, acting in the<br />

capacity of Castle Gold’s internal Qualified Person in matters of process engineering and metallurgy. Mr.<br />

Koningen is also a Director of Castle Gold. Presently Castle Gold is in the process of completing<br />

v

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!