Table 15. Operating Cost Summary (US$).<br />

1,500,000 Tonnes Ore per Year 5,000,000 Tonnes Ore per Year<br />

Ore and Waste Mined (tonnes)<br />

Ore 1,500,000 5,000,000<br />

Waste (assume W:O 1.5:1.0) 2,250,000 7,500,000<br />

Total 3,750,000 12,500,000<br />

Details of Payments Amount $/t ore % Amount $/t ore %<br />

Ore/Waste Mining $3,860,000 $2.57 <strong>43</strong>.5% $12,250,000 $2.45 55.1%<br />

Mining/Geological Engineering & Misc. $200,000 $0.13 2.3% $200,000 $0.04 0.9%<br />

Screening and Crushing $1,110,000 $0.74 12.5% $1,750,000 $0.35 7.9%<br />

Plant/Processing Misc. (incl.<br />

Reagents) $1,310,000 $0.88 14.8% $4,400,000 $0.88 19.8%<br />

<strong>La</strong>bour $1,000,000 $0.67 11.3% $1,000,000 $0.20 4.7%<br />

<strong>Durango</strong> Office Expenses $310,000 $0.21 3.5% $288,000 $0.06 1.3%<br />

Site Construction (Plant and Ponds) $730,000 $0.49 8.2% $1550,000 $0.31 7.0%<br />

Miscellaneous Costs $350,000 $0.23 3.9% $700,000 $0.15 3.4%<br />

Total $8,870,000 $5.92 100%<br />

$22,138,000<br />

$4.45 100.0%<br />

Mining Cost per tonne moved $1.03 $0.98<br />

Notes:<br />

1) <strong>The</strong> mining cost has been reduced from $1.03 to $0.98to reflect new larger scale contracts being negotiated with the mining contractors<br />

2) <strong>The</strong> Plant Process costs is based on experience to date<br />

3) Screening and Crushing assumes that 40% of the material will be crushed after the screening system is installed.<br />