08.03.2015 Views

43-101 2008 Technical Report On The La Fortuna Project, Durango ...

43-101 2008 Technical Report On The La Fortuna Project, Durango ...

43-101 2008 Technical Report On The La Fortuna Project, Durango ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Undiluted Reserves at $600 per Ounce Gold<br />

Overburden Tonnes 13,500,000<br />

Oxide Below 0.15 g/tonne* 12,200,000<br />

Subtotal, Waste Rock 25,700,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 44,300,000 0.51 725,000 0.15 63,000 0.33 700<br />

Undiluted Reserves at $625 per Ounce Gold<br />

Overburden Tonnes 14,900,000<br />

Oxide Below 0.15 g/tonne* 13,300,000<br />

Subtotal, Waste Rock 28,200,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 46,800,000 0.50 752,000 0.15 <strong>101</strong>,000 0.32 1,000<br />

Undiluted Reserves at $650 per Ounce Gold<br />

Overburden Tonnes 15,600,000<br />

Oxide Below 0.15 g/tonne* 14,000,000<br />

Subtotal, Waste Rock 29,600,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 49,500,000 0.49 774,000 0.15 108,000 0.31 1,100<br />

Undiluted Reserves at $675 per Ounce Gold<br />

Overburden Tonnes 22,400,000<br />

Oxide Below 0.15 g/tonne* 18,400,000<br />

Subtotal, Waste Rock 40,800,000<br />

In-Pit Proven and Probable Reserves<br />

In-Pit Inferred Resources<br />

Cut-off Tonnes Average Cut-off Tonnes Average<br />

Grade Above Grade Grade Above Grade<br />

(g/tonne) Cut-off (g/tonne) Ounces (g/tonne) Cut-off (g/tonne) Ounces<br />

0.15 56,600,000 0.47 852,000 0.15 122,000 0.30 1,200<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!