14.0 MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES<br />
14.1 HISTORICAL MINERAL RESOURCE RESERVE ESTIMATES<br />
Several mineral resource and reserve estimates have been produced for the Property.<br />
• <strong>The</strong> first estimate was completed by Battle Mountain in 1999 (Schumacher, 1999);<br />
• A second resource estimate was prepared by Howe in 2002 (Howe 2002) followed by two reserve<br />
statements (Howe, 2002 and 2003);<br />
• Two subsequent resource estimates were prepared by Arizona-based Resource Modeling<br />
Incorporated (RMI, 2004b and 2004c).<br />
<strong>The</strong> above mentioned historical mineral resource-reserve estimates have been previously disclosed in the<br />
following NI <strong>43</strong>-<strong>101</strong> technical reports:<br />
A. C. A. Howe International Limited (2002), Prefeasibility <strong>Report</strong>, El Cairo Gold <strong>Project</strong>, State of<br />
<strong>Durango</strong>, Mexico, for Castle Gold Minerals Limited, Toronto, Canada; Howe <strong>Report</strong> 845,<br />
available for public viewing on the TSX Sedar Filing website at http://www.sedar.com/.<br />
A. C. A. Howe International Limited (2003), Revised Prefeasibility <strong>Report</strong>, El Cairo Gold <strong>Project</strong>,<br />
State of <strong>Durango</strong>, Mexico, for Castle Gold Minerals Limited, Toronto, Canada; Howe <strong>Report</strong><br />
850, available for public viewing on the TSX Sedar Filing website at http://www.sedar.com/.<br />
A. C. A. Howe International Limited (2004), <strong>Technical</strong> <strong>Report</strong> on the 2003 Diamond Drill Program, El<br />
Cairo Gold <strong>Project</strong>, State of <strong>Durango</strong>, Mexico, for Castle Gold Minerals Limited, Toronto,<br />
Canada; Howe <strong>Report</strong> 861, 59 p.<br />
A. C. A. Howe International Limited (2006), Pre-Feasibility <strong>Report</strong> El Castillo <strong>Project</strong>, <strong>Durango</strong>,<br />
Mexico, for Castle Gold Minerals Limited, Toronto, Canada; Howe <strong>Report</strong> 897, 1<strong>43</strong> p.<br />
<strong>The</strong> Battle Mountain and Resource Modeling Incorporated (“RMI”) estimates are not NI <strong>43</strong>-<strong>101</strong>-<br />
compliant and are therefore treated herein by Howe as “historic estimates”. Prior to the completion of<br />
this report, the 2002 Howe resource estimate was considered the current estimate for the Property since<br />
the estimate is CIM-based and NI <strong>43</strong>-<strong>101</strong>-compliant and has not been superseded by a more recent NI <strong>43</strong>-<br />
<strong>101</strong>-compliant estimate. It should be noted that the authors of this report were not involved in the<br />
preparation of the 2002 Howe estimate.<br />
14.2 <strong>2008</strong> HOWE RESOURCE AND RESERVE ESTIMATE<br />
In <strong>2008</strong>, at the request of Castle Gold, Howe has revised the 2002 pre-feasibility study for an operational<br />
scenario which reviewed an increase annual production to 4,000,000 tpy at a higher average gold price<br />
compared to the 4,000,000 tpy scenario that was the operational criteria in the 2002 report.<br />
Howe’s methodology for the revised resource estimate remains the same (refer to Howe report No. 845,<br />
896) except for some adjustments made to the topographic data as well as account for material mined to<br />
date by Castle Gold during their pre-production stage of development work at El Castillo.<br />