Table 9. Castle Gold test heap leach results and observations.<br />

Heap 1 - Low Grade Ore<br />

<strong>The</strong> cyanide solution application rate was consistent<br />

at ~0.002 gpm/ft 2 .<br />

Leaching was performed for a period of 45 days.<br />

<strong>The</strong> decision to discontinue leaching was made<br />

based on the fact that the difference between the<br />

gold content in the barren and pregnant leach<br />

solutions at this time was extremely low (~0.03<br />

ppm). <strong>The</strong> data indicates that the vast majority of<br />

leaching was completed in the first 25 days.<br />

Dissolved copper levels in the leach solutions were<br />

extremely low (