03.03.2015 Views

Unicenter CA-Scheduler Job Management for VSE User Guide

Unicenter CA-Scheduler Job Management for VSE User Guide

Unicenter CA-Scheduler Job Management for VSE User Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.6 Analyzing Schedules<br />

3.6 Analyzing Schedules<br />

You should analyze all schedules that you add to the database be<strong>for</strong>e you put<br />

them into production. This allows you to fix discrepancies and omissions<br />

be<strong>for</strong>e you run the schedules. There are two ways to analyze a schedule<br />

online:<br />

■<br />

■<br />

Analyze a specific schedule<br />

List all schedules and pick one to analyze<br />

The first method is quicker, but the second is useful if you do not know the<br />

exact spelling of the schedule to be analyzed. The analysis will produce<br />

messages about the following:<br />

■<br />

■<br />

■<br />

If no jobs are defined <strong>for</strong> the schedule<br />

If the schedule records specify an undefined calendar, datetable, userid, or<br />

predecessor<br />

If a predecessor or successor deadlock exists<br />

To analyze a specific schedule, start at the Schedule Maintenance panel.<br />

Suppose you recently defined a schedule (NEWSCHED), but you failed to<br />

define any jobs <strong>for</strong> it and you defined a nonexistent datetable name in it.<br />

<br />

SCHD-SM SCHEDULE MAINTENANCE <strong>CA</strong>-SCHEDULER<br />

===> MASTER - WR<br />

CONNECT : 4<br />

<br />

FUNCTION<br />

ENTER<br />

-------- ------<br />

DISPLAY FULL DIRECTORY........... (PRESS ENTER)<br />

SELECTIVELY DISPLAY DIRECTORY.... 1,SELECT CRITERIA<br />

DISPLAY SPECIFIC SCHEDULE........ 2,SCHEDULE<br />

ALTER SCHEDULE RECORD............ 3,SCHEDULE<br />

DEFINE SCHEDULE RECORD........... 4(,SCHEDULE)<br />

DELETE SCHEDULE RECORD........... 5,SCHEDULE<br />

ANALYZE SCHEDULE................. 6,SCHEDULE<br />

AUTO-REPLY PROCESSING............ 7,SCHEDULE<br />

<br />

PF1=HELP<br />

<br />

To analyze the schedule, enter 6, followed by the schedule name.<br />

<strong>Unicenter</strong> <strong>CA</strong>-<strong>Scheduler</strong> responds by displaying the SCHDUTIL Output panel:<br />

3-40 <strong>Unicenter</strong> <strong>CA</strong>-<strong>Scheduler</strong> <strong>User</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!