03.03.2015 Views

Unicenter CA-Scheduler Job Management for VSE User Guide

Unicenter CA-Scheduler Job Management for VSE User Guide

Unicenter CA-Scheduler Job Management for VSE User Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.6 NJE Processing<br />

The following jobs are defined at the Cherry Hill node:<br />

SCD: SH1<br />

JOB: SHJ1,NODE=blank<br />

JOB: SHJ2,NODE=NEWYORK<br />

JOB: SHJ3,NODE=PHOENIX<br />

JOB: SHJ4,NODE=NEWYORK<br />

All of the preceding jobs are within the schedule SH001. The schedule runs<br />

every day and so does each job.<br />

Shown below are different cases of cross-node communications given the<br />

following situation with these nodes.<br />

The operator at the Phoenix node can issue the <strong>CA</strong>NCEL command with<br />

different optional keywords with different results in each case.<br />

<strong>CA</strong>SE 1: <strong>CA</strong>NCEL S NAME=SH1,FM=CHERRYHL<br />

The preceding will cancel the part of SH001 submitted from Cherry Hill and<br />

running at Phoenix. Thus, only job SHJ03 is canceled. The other jobs in the<br />

schedule at Cherry Hill and New York remain intact.<br />

<strong>CA</strong>SE 2: <strong>CA</strong>NCEL S NAME=SH1,FM=CHERRYHL,ROUTE=NEWYORK<br />

This preceding will cancel the part of SH001 submitted from Cherry Hill and<br />

running at New York. Thus, only jobs SHJ02 and SHJ04 are canceled (that is,<br />

they are deleted from the POWER input queue since they have a status of<br />

SUBMITD). The other jobs in the schedule at Cherry Hill and Phoenix remain<br />

intact.<br />

<strong>CA</strong>SE 3: <strong>CA</strong>NCEL S NAME=SH1,ROUTE=CHERRYHL<br />

The preceding will cause all jobs in schedule SH001 to be canceled regardless<br />

of where they are running. All of them are canceled because the ROUTE=<br />

keyword directs the command to be issued at the Cherry Hill node. This is<br />

the node where the schedule SH001 is defined and controlled.<br />

A summary follows.<br />

7-30 <strong>Unicenter</strong> <strong>CA</strong>-<strong>Scheduler</strong> <strong>User</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!