5.1 Criteria Vocabulary<br />

Example<br />

SCD SCHD1<br />

DOS TSTJOB1<br />

PRED DSN<br />

PROD.JOB1DSN<br />

Interpretation Of Predecessors<br />

Do not run until all of the jobs in the schedule<br />

SCHD1 have completed.<br />

Do not run until after the nonscheduled <strong>VSE</strong> job<br />

TSTJOB1 completes. (The job TSTJOB1 is not under<br />

the control of <strong>Unicenter</strong> <strong>CA</strong>-<strong>Scheduler</strong>.)<br />

Do not run until after the output data set<br />

PROD.JOB1DSN has been closed at least once since<br />

this job was last run.<br />

5.1.4 Combining Selection and Predecessor Criteria Vocabulary<br />

Previously, selection and predecessor processing have been treated as separate<br />

issues. They really are related, however.<br />

For example, the selection criteria <strong>for</strong> JOBB is JOBA. That is, JOBB is selected<br />

any time that JOBA is selected. In doing this, JOBA automatically becomes a<br />

predecessor to JOBB. Thus, JOBA is an explicit predecessor to JOBB. That is,<br />

the predecessor name is explicitly stated in the criteria. This particular type<br />

can even be further qualified as a selection-defined explicit predecessor.<br />

Selection-defined explicit predecessors are jobs or schedules used in the<br />

selection criteria. The following is a list of these criteria:<br />

<strong>Job</strong> name<br />

SCD schedule name<br />

START job name<br />

START SCD schedule name<br />

Some examples that define selection and predecessor criteria <strong>for</strong> JOBC follow.<br />

Example<br />

JOBA<br />

START JOBA<br />

MON AND JOBA<br />

WED AND START SCD SCHD1<br />

Interpretation Of Criteria<br />

Select every time JOBA is selected and<br />

make the successful completion of JOBA<br />

a predecessor of JOBC.<br />

Select every time JOBA is selected and<br />

make the start of JOBA a predecessor of<br />

JOBC.<br />

Select every time JOBA is selected on a<br />

Monday. JOBC will not start until JOBA<br />

completes successfully.<br />

Select every time schedule SCHD1 is<br />

selected on a Wednesday. JOBC will not<br />

start until schedule SCHD1 starts.<br />

5-6 <strong>Unicenter</strong> <strong>CA</strong>-<strong>Scheduler</strong> <strong>User</strong> <strong>Guide</strong>