03.03.2015 Views

Unicenter CA-Scheduler Job Management for VSE User Guide

Unicenter CA-Scheduler Job Management for VSE User Guide

Unicenter CA-Scheduler Job Management for VSE User Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.2 Displaying Status<br />

<br />

SCHD-CP SCHEDULER COMMAND PROCESSOR <strong>CA</strong>-SCHEDULER<br />

===> MASTER - WR<br />

CONNECT : 4<br />

<br />

<br />

SCHEDULE JOB SYS AVG START END COMP<br />

NAME NAME JNO ST ID TIME TIME TIME S T A T U S CODE<br />

ABCXY 1 .19 16.5 17.3<br />

ABC 1 39 1 . 5 16.5 16.17 ENDED<br />

1 39 1 .5 16.44 16.45 ENDED<br />

1 39 1 .5 16.55 16.58 ENDED<br />

ABC 1 4 1 .7 16.17 16.2 ABENDED 14<br />

1 4 1 .7 16.46 16.5 ABENDED 18<br />

1 4 1 .7 17. 17.2 ENDED<br />

XYZ 1 4 1 .7 16.21 16.3 FAILED 8<br />

1 4 1 .7 16.5 16.54 FAILED 16<br />

1 4 1 .7 17.21 17.3 ENDED<br />

<br />

PRESS ENTER FOR NEXT PAGE<br />

PF1=HELP<br />

<br />

This display also lists jobs within schedules.<br />

The primary difference between this and the default display is that the History<br />

display depicted preceding contains the average run time and the completion<br />

code of the job. The average time of a job is based on its history and you can<br />

use it to immediately determine if something is out of line. The status code<br />

appears, but does not contain the same amount of in<strong>for</strong>mation as the default<br />

status display.<br />

4.2.4.4 Sample Schedule Summary Status Display<br />

By specifying<br />

D=S, you get the Schedule Summary status display. This panel shows output<br />

that could result from typing just<br />

D=S in the ACTIVE field on the Online Status panel. Average time is shown<br />

in DD/hh.mm <strong>for</strong>mat.<br />

<br />

SCHD-CP SCHEDULER COMMAND PROCESSOR <strong>CA</strong>-SCHEDULER<br />

===> MASTER - WR<br />

CONNECT : 4<br />

<br />

<br />

SCHEDULE S T A R T E N D DEADLINE REMAINING AVERAGE RER<br />

NAME DATE TIME DATE TIME DATE TIME TIME RUN TIME UN<br />

<strong>CA</strong>SCHD1 11/6 11.2 11/6 19.22 11/6 2. 8.12<br />

<strong>CA</strong>SHCD2 11/6 14.48 11/6 15.35 11/6 16.3 .44<br />

<strong>CA</strong>SCHD3 11/6 19.15 11/6 . 11/5 23.15 3.14 3.32 Y<br />

<br />

PRESS ENTER FOR NEXT PAGE<br />

PF1=HELP<br />

<br />

This display just summarizes schedules. Along with the date and time at<br />

which schedules started and finished, you can also see when they were due to<br />

finish.<br />

Chapter 4. Online Monitoring 4-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!