growth in <strong>the</strong> upper Columbia Valley. The Golden area load would be transferred to<br />

<strong>the</strong> new facilities to alleviate transmissi<strong>on</strong> c<strong>on</strong>straints <strong>on</strong> <strong>the</strong> existing 69 kV system.<br />

The total length <strong>of</strong> <strong>the</strong> proposed new transmissi<strong>on</strong> lines would be approximately 115 km.<br />

Figure 1. A porti<strong>on</strong> <strong>of</strong> <strong>the</strong> Kootenay regi<strong>on</strong>, showing <strong>the</strong> proposed routing <strong>of</strong> <strong>the</strong> Columbia Valley<br />

Transmissi<strong>on</strong> lines 1<br />

1 Provided in <strong>the</strong> Applicati<strong>on</strong> <strong>of</strong> <strong>the</strong> B.C. Transmissi<strong>on</strong> Corp.<br />