Evidence on the Adequacy of First Nations Consultation - BC Hydro ...
Evidence on the Adequacy of First Nations Consultation - BC Hydro ...
Evidence on the Adequacy of First Nations Consultation - BC Hydro ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
7 Even with measures to limit weed<br />
spread during c<strong>on</strong>structi<strong>on</strong><br />
(6.3.5.2, Table 6-9), <strong>the</strong> presence<br />
<strong>of</strong> a permanent corridor having<br />
perpetually disturbed vegetati<strong>on</strong><br />
and allowing access to trucks and<br />
<strong>of</strong>f-road vehicles will almost<br />
certainly increase <strong>the</strong> spread <strong>of</strong><br />
invasive weeds.<br />
In cooperati<strong>on</strong> with <strong>the</strong> Ministry <strong>of</strong> Envir<strong>on</strong>ment, <strong>BC</strong>TC has developed a<br />
comprehensive invasive plant management program and is committed to<br />
implementing this program during c<strong>on</strong>structi<strong>on</strong> and operati<strong>on</strong> <strong>of</strong> <strong>the</strong><br />
proposed transmissi<strong>on</strong> lines.<br />
Mitigati<strong>on</strong> measures will be outlined in<br />
<strong>the</strong> c<strong>on</strong>structi<strong>on</strong> EMP for <strong>the</strong> project.<br />
8 Table 6-9 and o<strong>the</strong>r tables<br />
covering <strong>the</strong> same material do not<br />
specifically include <strong>the</strong><br />
recommendati<strong>on</strong>s made in <strong>the</strong> text<br />
to c<strong>on</strong>duct more detailed plant<br />
surveys throughout <strong>the</strong> final route.<br />
9 There is a small western red cedar<br />
swamp in <strong>the</strong> vicinity <strong>of</strong> <strong>the</strong><br />
Mo<strong>on</strong>raker Diversi<strong>on</strong>, just north <strong>of</strong><br />
<strong>the</strong> Cany<strong>on</strong> Creek. Does it align<br />
with <strong>the</strong> route?<br />
A more updated versi<strong>on</strong> <strong>of</strong> <strong>the</strong> EOA report was produced and was<br />
submitted as a part <strong>of</strong> <strong>the</strong> CPCN Applicati<strong>on</strong> to <strong>the</strong> <strong>BC</strong> Utilities Commissi<strong>on</strong>.<br />
This table was revised and now recommends that <strong>BC</strong>TC “Have a qualified<br />
pr<strong>of</strong>essi<strong>on</strong>al c<strong>on</strong>duct a detailed assessment <strong>of</strong> rare plants and sensitive<br />
ecosystems al<strong>on</strong>g <strong>the</strong> route <strong>on</strong>ce <strong>the</strong> final alignment has been selected. “<br />
At this time <strong>the</strong> alignment <strong>of</strong> <strong>the</strong> 230kV transmissi<strong>on</strong> line has not been<br />
finalized. <strong>BC</strong>TC will c<strong>on</strong>sider this informati<strong>on</strong> at <strong>the</strong> time <strong>of</strong> finalizing <strong>the</strong><br />
alignment.<br />
Detailed assessment will be<br />
c<strong>on</strong>ducted at <strong>the</strong> time <strong>of</strong> <strong>the</strong><br />
preparati<strong>on</strong> <strong>of</strong> <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> EMP.<br />
Site specific informati<strong>on</strong> like this will<br />
be collected, c<strong>on</strong>firmed by <strong>the</strong><br />
envir<strong>on</strong>mental c<strong>on</strong>sultant, and<br />
c<strong>on</strong>sidered during <strong>the</strong> preparati<strong>on</strong> <strong>of</strong><br />
<strong>the</strong> c<strong>on</strong>structi<strong>on</strong> EMP.<br />
Page 140 <strong>of</strong> 200