03.03.2015 Views

Evidence on the Adequacy of First Nations Consultation - BC Hydro ...

Evidence on the Adequacy of First Nations Consultation - BC Hydro ...

Evidence on the Adequacy of First Nations Consultation - BC Hydro ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7 Even with measures to limit weed<br />

spread during c<strong>on</strong>structi<strong>on</strong><br />

(6.3.5.2, Table 6-9), <strong>the</strong> presence<br />

<strong>of</strong> a permanent corridor having<br />

perpetually disturbed vegetati<strong>on</strong><br />

and allowing access to trucks and<br />

<strong>of</strong>f-road vehicles will almost<br />

certainly increase <strong>the</strong> spread <strong>of</strong><br />

invasive weeds.<br />

In cooperati<strong>on</strong> with <strong>the</strong> Ministry <strong>of</strong> Envir<strong>on</strong>ment, <strong>BC</strong>TC has developed a<br />

comprehensive invasive plant management program and is committed to<br />

implementing this program during c<strong>on</strong>structi<strong>on</strong> and operati<strong>on</strong> <strong>of</strong> <strong>the</strong><br />

proposed transmissi<strong>on</strong> lines.<br />

Mitigati<strong>on</strong> measures will be outlined in<br />

<strong>the</strong> c<strong>on</strong>structi<strong>on</strong> EMP for <strong>the</strong> project.<br />

8 Table 6-9 and o<strong>the</strong>r tables<br />

covering <strong>the</strong> same material do not<br />

specifically include <strong>the</strong><br />

recommendati<strong>on</strong>s made in <strong>the</strong> text<br />

to c<strong>on</strong>duct more detailed plant<br />

surveys throughout <strong>the</strong> final route.<br />

9 There is a small western red cedar<br />

swamp in <strong>the</strong> vicinity <strong>of</strong> <strong>the</strong><br />

Mo<strong>on</strong>raker Diversi<strong>on</strong>, just north <strong>of</strong><br />

<strong>the</strong> Cany<strong>on</strong> Creek. Does it align<br />

with <strong>the</strong> route?<br />

A more updated versi<strong>on</strong> <strong>of</strong> <strong>the</strong> EOA report was produced and was<br />

submitted as a part <strong>of</strong> <strong>the</strong> CPCN Applicati<strong>on</strong> to <strong>the</strong> <strong>BC</strong> Utilities Commissi<strong>on</strong>.<br />

This table was revised and now recommends that <strong>BC</strong>TC “Have a qualified<br />

pr<strong>of</strong>essi<strong>on</strong>al c<strong>on</strong>duct a detailed assessment <strong>of</strong> rare plants and sensitive<br />

ecosystems al<strong>on</strong>g <strong>the</strong> route <strong>on</strong>ce <strong>the</strong> final alignment has been selected. “<br />

At this time <strong>the</strong> alignment <strong>of</strong> <strong>the</strong> 230kV transmissi<strong>on</strong> line has not been<br />

finalized. <strong>BC</strong>TC will c<strong>on</strong>sider this informati<strong>on</strong> at <strong>the</strong> time <strong>of</strong> finalizing <strong>the</strong><br />

alignment.<br />

Detailed assessment will be<br />

c<strong>on</strong>ducted at <strong>the</strong> time <strong>of</strong> <strong>the</strong><br />

preparati<strong>on</strong> <strong>of</strong> <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> EMP.<br />

Site specific informati<strong>on</strong> like this will<br />

be collected, c<strong>on</strong>firmed by <strong>the</strong><br />

envir<strong>on</strong>mental c<strong>on</strong>sultant, and<br />

c<strong>on</strong>sidered during <strong>the</strong> preparati<strong>on</strong> <strong>of</strong><br />

<strong>the</strong> c<strong>on</strong>structi<strong>on</strong> EMP.<br />

Page 140 <strong>of</strong> 200

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!