Just north <strong>of</strong> <strong>the</strong> Frances Creek<br />

crossing <strong>on</strong> Opti<strong>on</strong> B (<strong>BC</strong>TC's<br />

preferred opti<strong>on</strong>), <strong>the</strong> combinati<strong>on</strong><br />

<strong>of</strong> old forest, wetland and dry<br />

slopes covers a large enough area<br />

that it cannot be avoided through<br />

careful structure placement,<br />

without moving outside <strong>of</strong> <strong>the</strong><br />

proposed alignment. Even in cases<br />

where those three types cover<br />

large porti<strong>on</strong>s, but not <strong>the</strong> entire<br />

kilometer-wide analysis strip, <strong>the</strong><br />

cost and engineering<br />

c<strong>on</strong>siderati<strong>on</strong>s entailed in<br />

"bending" <strong>the</strong> line around <strong>the</strong>m<br />

may decrease <strong>the</strong> likelihood <strong>of</strong><br />

doing so. Unless such reserves<br />

are in fact formally established,<br />

those stands will ultimately be<br />

logged.<br />

6 The assessment does not c<strong>on</strong>sider<br />

<strong>the</strong> potential effect <strong>of</strong> <strong>the</strong><br />

transmissi<strong>on</strong> line's presence <strong>of</strong><br />

fire-dependent ecosystems.<br />

impact <strong>the</strong> extent <strong>of</strong> sensitive ecosystems (i.e. <strong>the</strong> disturbance by <strong>the</strong><br />

project would push <strong>the</strong>se ecosystems back to an earlier successi<strong>on</strong> stage,<br />

but would not degrade <strong>the</strong>m to <strong>the</strong> point that <strong>the</strong>y could not progress to later<br />

successi<strong>on</strong>al stages as expected in <strong>the</strong> event that <strong>the</strong> line was removed).<br />

Additi<strong>on</strong>al mitigati<strong>on</strong> measures are identified in <strong>the</strong> report. Those measures<br />

would also reduce <strong>the</strong> potential impact <strong>of</strong> <strong>the</strong> CVT Project <strong>on</strong> sensitive<br />

ecosystems if c<strong>on</strong>structed using ei<strong>the</strong>r Route Corridor Opti<strong>on</strong> ‘A’ or ‘B’ .<br />

It is possible that <strong>the</strong>re will be sensitive ecosystems in some areas that will<br />

be partially disturbed by <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> <strong>of</strong> <strong>the</strong> transmissi<strong>on</strong> line. However,<br />

<strong>the</strong> applicati<strong>on</strong> <strong>of</strong> mitigati<strong>on</strong> measures as recommended in <strong>the</strong> report<br />

should greatly limit <strong>the</strong> occurrence <strong>of</strong> such disturbances. Site-specific<br />

c<strong>on</strong>cerns will be addressed (through <strong>the</strong> development <strong>of</strong> additi<strong>on</strong>al<br />

mitigati<strong>on</strong> measures..<br />

<strong>BC</strong>TC does not have <strong>the</strong> authority to establish Old Growth Management<br />

Areas <strong>on</strong> crown land – establishment and management <strong>of</strong> OGMAs is <strong>the</strong><br />

resp<strong>on</strong>sibility <strong>of</strong> B.C. Integrated Land Management Bureau.<br />

The envir<strong>on</strong>mental overview assessment <strong>of</strong> <strong>the</strong> potential impacts <strong>of</strong> <strong>the</strong><br />

project <strong>on</strong> vegetati<strong>on</strong> was c<strong>on</strong>ducted through a c<strong>on</strong>siderati<strong>on</strong> <strong>of</strong> rare plant<br />

species, sensitive ecosystems (including those classified as being firemaintained<br />

ecosystems if <strong>the</strong>y were c<strong>on</strong>sidered by <strong>the</strong> province as blue- or<br />

red-listed communities), and invasive species.<br />

Detailed assessment will be<br />

c<strong>on</strong>ducted during <strong>the</strong> preparati<strong>on</strong> <strong>of</strong><br />

<strong>the</strong> c<strong>on</strong>structi<strong>on</strong> envir<strong>on</strong>mental<br />

management plan<br />

Detailed assessment will be<br />

c<strong>on</strong>ducted during <strong>the</strong> preparati<strong>on</strong> <strong>of</strong><br />

<strong>the</strong> c<strong>on</strong>structi<strong>on</strong> envir<strong>on</strong>mental<br />

management plan which would help<br />

to maintain <strong>the</strong> plant and animal<br />

communities associated with <strong>the</strong><br />

transmissi<strong>on</strong> line corridor<br />

Page 139 <strong>of</strong> 200