CVT EOA ISSUES/ CONCERNS<br />

KTUNAXA NATION COUNCIL <strong>BC</strong>TC RESPONSES Status<br />

WILDLIFE & VEGETATION REVIEW OF EOA<br />

ISSUES & CONCERNS<br />

Vegetati<strong>on</strong><br />

1 Sensitive ecosystems may be<br />

under-represented in mapping<br />

associated with this report.<br />

The envir<strong>on</strong>mental overview assessment was c<strong>on</strong>ducted using best<br />

available informati<strong>on</strong>, including PEM and TEM. Areas not covered by <strong>the</strong>se<br />

datasets were supplemented by o<strong>the</strong>r data sources (e.g. VRI, air photo<br />

interpretati<strong>on</strong>, field surveys, Ministry <strong>of</strong> Forest and Range (forest cover<br />

comp<strong>on</strong>ent <strong>of</strong> <strong>the</strong> RESULTS dataset) etc.). However, it is possible that<br />

some sensitive ecosystems were not captured given <strong>the</strong> depth <strong>of</strong> study<br />

defined for <strong>the</strong> project.<br />

<strong>BC</strong>TC has proposed general approaches that would address sensitive<br />

ecosystems such as using existing cleared areas, avoiding wetlands and<br />

old forest patches, having envir<strong>on</strong>mental m<strong>on</strong>itors <strong>on</strong> site during<br />

c<strong>on</strong>structi<strong>on</strong> and development <strong>of</strong> <strong>the</strong> c<strong>on</strong>structi<strong>on</strong> Envir<strong>on</strong>mental<br />

Management Plan.<br />

Detailed assessment <strong>of</strong> <strong>the</strong><br />

transmissi<strong>on</strong> alignments (230 and<br />

69kV) will be d<strong>on</strong>e during <strong>the</strong><br />

preparati<strong>on</strong> <strong>of</strong> <strong>the</strong> c<strong>on</strong>structi<strong>on</strong><br />

Envir<strong>on</strong>mental Management Plan.<br />

2 The asserti<strong>on</strong> that <strong>the</strong>re will be a<br />

Low Potential Impact <strong>on</strong> sensitive<br />

ecosystems does not seem to be<br />

well supported.<br />

AECOM c<strong>on</strong>ducted an envir<strong>on</strong>mental overview assessment based <strong>on</strong><br />

c<strong>on</strong>ceptual project informati<strong>on</strong> and has recommended <strong>BC</strong>TC to apply best<br />

management practices in c<strong>on</strong>juncti<strong>on</strong> with envir<strong>on</strong>mental m<strong>on</strong>itoring during<br />

c<strong>on</strong>structi<strong>on</strong> to reduce risk.<br />

AECOM rated <strong>the</strong> potential impact <strong>of</strong> <strong>the</strong> project <strong>on</strong> sensitive ecosystems<br />

as moderate in <strong>the</strong> absence <strong>of</strong> mitigati<strong>on</strong> and low with mitigati<strong>on</strong> after<br />

c<strong>on</strong>siderati<strong>on</strong> <strong>of</strong> a number <strong>of</strong> factors:<br />

Potential disturbance would not be severe enough to cause irreversible<br />

damage to <strong>the</strong>se ecosystems. Corridor Opti<strong>on</strong>s ‘A’ and ‘B’ would not<br />

No change in status<br />