03.03.2015 Views

index - Maryland State Highway Administration

index - Maryland State Highway Administration

index - Maryland State Highway Administration

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INDEX<br />

Item Section Page<br />

Control and Distribution Equipment ......................... 950.13 799 <br />

Control of the Work .................................................... GP-Section 5<br />

27 <br />

Control Strip<br />

Hot Mix Asphalt Pavement ........................................ 504.03.13 476<br />

HMA Gap-Graded ...................................................... 506.03.09 487<br />

Permanent Pavement Markings ................................. 549.03.03 519<br />

Control, Subgrade ....................................................... 208.03.02 233<br />

Controller Cabinets for Traffic Signals ..................... 816<br />

642 <br />

Conveyors for Concrete Structures ............................ 420.03.04(h) 322<br />

Cooperation with Utilities ........................................... GP-5.05 29<br />

Cores for Hot Mix Asphalt Pavement ........................ 504.03.10 472<br />

Corporate Registration and Tax Payment <br />

Certification ............................................................. GP-7.27 52<br />

Cost and Price Certification ........................................ GP-7.26<br />

51 <br />

Cotton Mats for Curing Concrete .............................. 420.03.09(d) 328<br />

Crash Cushion, Temporary ......................................... 104.10 165<br />

Crossovers and Interchanges ...................................... 104.02.03(c) 151<br />

Cross Section Method of Measurement <br />

of Excavation ............................................................ 201.04.03 223<br />

Cultural Resources ...................................................... TC-5.04 104<br />

Culverts, Concrete Box ............................................... 420 306<br />

Culverts, Pipe ............................................................... 303 239<br />

Abandoned ................................................................. 303.03.10 241<br />

Backfilling ................................................................. 303.03.07<br />

241 <br />

Bedding ...................................................................... 303.03.02 240<br />

Cleaning Existing ....................................................... 303.03.11 241<br />

Connections ............................................................... 303.03.05 240<br />

Encasement ................................................................ 303.03.06<br />

240 <br />

Ends When Placed Askew ......................................... 303.03 239<br />

Excavation ................................................................. 303.03.01<br />

239 <br />

Inspection and Acceptance ......................................... 303.03.12 241<br />

Installation ................................................................. 303.03.03<br />

240 <br />

Joints .......................................................................... 303.03.04 240<br />

Relaying Existing ....................................................... 303.03.09 241<br />

Removal of Existing .................................................. 303.03.08 241<br />

Curb<br />

Combination Curb and Gutter, Concrete ................... 602.03 521 <br />

Depressed .................................................................. 602.03.01(d) 522<br />

Hot Mix Asphalt ........................................................ 602.03.02 523<br />

Gutters, etc. Abutting Hot Mix Asphalt<br />

Pavement ............................................................... 504.03.15<br />

477 <br />

Openings, Concrete .................................................... 602.03.01(e) 522<br />

Removal of Concrete ................................................. 206.03 231<br />

Curing<br />

Concrete Structures, Duration .................................... 420.03.08 327<br />

Concrete Structures, Methods .................................... 420.03.09 328<br />

Plain and Reinforced Concrete Pavements ................ 520.03.12 503<br />

Portland Cement Concrete<br />

Pavement Repairs .................................................. 522.03.11 513<br />

Cutoff of Piling ............................................................. 410.03.10 292<br />

Cutting and Bending Reinforcement .......................... 421.03.03 335<br />

Cutting and Boring of Timber Structures ................. 462.03.02 442<br />

817

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!