25.02.2015 Views

Pre qualification drawings - Tender - University of Pretoria

Pre qualification drawings - Tender - University of Pretoria

Pre qualification drawings - Tender - University of Pretoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

I<br />

J<br />

56300<br />

7630 18090 4860 18090 7630<br />

9800<br />

1700 230 2500 230 815 230 230 1606 400 1610 250<br />

1 1<br />

2000<br />

CONCR. BEAM BY ENG. ABOVE<br />

TOC X 1373.850<br />

SF1.3<br />

CONCR. ROOF ABOVE<br />

TOC X 1373.850<br />

2 TILES<br />

2<br />

3<br />

10330<br />

SF1.19<br />

SF2-2<br />

SF 1.6<br />

4 4<br />

42850<br />

9030<br />

B<br />

300<br />

C-<br />

301 ---<br />

250mm SANDBLASTED IN-SITU<br />

CONCR. WALL BY ENG.<br />

GALV. STEEL A/C DUCTING BEHIND<br />

ALU. SCREEN ON STEEL STRUCTURE<br />

GALV. STEEL DUCTING<br />

RWDP<br />

A<br />

300<br />

RWDP<br />

SF1.17<br />

F<br />

302<br />

5930<br />

1800 230 3900<br />

2740<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

FIRE STAIR 1<br />

REFER TO SHEET<br />

350 FOR DETAIL<br />

230<br />

1350<br />

230<br />

LECTURE<br />

ROOM<br />

0-1<br />

DOUBLE<br />

VOLUME<br />

1m HIGH S/STEEL H/RAIL<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

17<br />

16<br />

15<br />

14<br />

13<br />

12<br />

11<br />

1098<br />

50Ø S/STEEL H/RAIL FIXED TO BRICKWORK<br />

90.00°<br />

LANDING<br />

TILES<br />

RWDP<br />

CEILING<br />

VOID<br />

CEILING<br />

VOID<br />

2820<br />

390<br />

230<br />

G<br />

303<br />

230 1800 7990<br />

4000 1730 230<br />

RWDP<br />

LANDING<br />

TOC X 1376.570<br />

TILES<br />

H<br />

303<br />

CONCR. ROOF ABOVE<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

230<br />

7650<br />

230<br />

230<br />

2500<br />

230<br />

4540<br />

I<br />

304<br />

BUILDING EXPANSION JOINT<br />

RWDP<br />

J<br />

304<br />

SINK<br />

B<br />

B<br />

D2-5.1<br />

DOUBLE<br />

VOLUME<br />

FOYER<br />

B<br />

DATA<br />

D2-5<br />

STORE<br />

B<br />

5 5<br />

18060<br />

1840<br />

COVERED<br />

ENTRANCE<br />

230<br />

B<br />

B<br />

B<br />

B<br />

B<br />

MECH.<br />

DUCT<br />

LIFT<br />

TILES<br />

FHR &<br />

2x DPC<br />

TOP<br />

1m HIGH S/STEEL H/RAIL<br />

K<br />

305<br />

BRIDGE 1<br />

LINOLEUM<br />

INVIGILATOR'S<br />

RESTROOM<br />

LOUNGE<br />

LINOLEUM<br />

SECURITY<br />

DOOR<br />

1m HIGH S/STEEL H/RAIL<br />

SHELVES<br />

L<br />

305<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

CIRCULATION<br />

MARMOLEUM<br />

TOC 1375.150<br />

FFL X 1375.180<br />

2960 3860 2980<br />

RWDP<br />

POLYCARBONATE SHEETS<br />

SHEETS ON GALV. STEEL STRUCTURE<br />

POWDERCOATED ALU. SHOP<br />

FRONT AS PER SCHEDULE<br />

SF1.20<br />

SCREEN SCREENS SCREEN<br />

TOP<br />

TOP<br />

B<br />

RWDP<br />

B<br />

KITCHENETTE<br />

SF2.1<br />

SF1.2<br />

D2-1<br />

SOUND DOORS<br />

TOC X 1375.150<br />

FFL X 1375.180<br />

1m HIGH S/STEEL H/RAIL<br />

DOUBLE<br />

VOLUME<br />

FOYER<br />

ADMIN<br />

ROOM<br />

LINOLEUM<br />

15<br />

14<br />

30<br />

29<br />

28<br />

27<br />

26<br />

M<br />

306<br />

STAIR 1<br />

TOC X 1373.450<br />

TILES<br />

RWDP<br />

SHELVES<br />

RWDP<br />

RWDP<br />

ALU. DIVIDING<br />

STRIP<br />

D2-2 D2-3 D2-4<br />

B<br />

DB<br />

FALL 5deg<br />

TOP<br />

BUILDING EXPANSION JOINT<br />

CUPB.<br />

RWDP<br />

B<br />

CUPB.<br />

SF 1.5<br />

B<br />

B<br />

B<br />

B<br />

B<br />

N<br />

306<br />

SF1.4<br />

250 2710<br />

1345 2520<br />

O<br />

307<br />

COVERED<br />

ENTRANCE<br />

SANDBLASTED IN-SITU<br />

CONCR. BY ENG.<br />

P<br />

307<br />

7990<br />

230 1730 4000 1800 230<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

RWDP<br />

34<br />

35<br />

36<br />

37<br />

LANDING<br />

TOC X 1376.570<br />

TILES<br />

COVERED WALKWAY<br />

ROOF LINE<br />

390<br />

230<br />

1m HIGH S/STEEL H/RAIL<br />

13<br />

14<br />

15<br />

16<br />

17<br />

12<br />

11<br />

10<br />

9<br />

8<br />

CEILING<br />

VOID<br />

LANDING<br />

CEILING<br />

VOID<br />

RWDP<br />

FIRE STAIR 2<br />

REFER TO SHEET<br />

352 FOR DETAIL<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

90.00°<br />

2820 230 1350 230 2740<br />

LECTURE<br />

ROOM<br />

0-2<br />

DOUBLE<br />

VOLUME<br />

Q<br />

308<br />

5930<br />

1800 300 1800 230 1800<br />

SF1.8<br />

REFER TO SHEET 100<br />

FOR RWDP DETAIL<br />

GALV. STEEL DUCTING<br />

GALV. STEEL STRUCTURE<br />

FOR CREEPERS<br />

150Ø uPVC RWDP BUILT<br />

INTO WALL CAVITY<br />

GALV. STEEL A/C DUCTING BEHIND<br />

ALU. SCREEN ON STEEL STRUCTURE<br />

B<br />

300<br />

2000<br />

10330<br />

9030<br />

42850<br />

REVISION SCHEDULE<br />

DRAWN DESCRIPTION<br />

REV DATE<br />

A 2010-03-18 CM new intermediate floor Proposed for <strong>of</strong>fices.<br />

B 2010-04-22 CM Floor heights revised to contour levels &<br />

floor areas adjusted.<br />

C 2010-04-28 CM Submission <strong>of</strong> SDP to council.<br />

D 2010-05-07 CM Fire stair added, all fire escapes adjusted to<br />

1,8m width. Toilet block enlarged, see grid<br />

lines.<br />

E 2010-05-11 CM Fire stairs adjusted to 1,8m width. Fire wall<br />

for all fire stairs. Fire hydrant position<br />

revised. Stair added & toilet design revised.<br />

F 2010-05-19 CM Toilet block enlarged. Refinement <strong>of</strong> alu.<br />

louvred screen. Issue to consultants.<br />

G 2010-06-01 CM Building plan submission.<br />

H 2010-06-22 BDV Issue to consultants.<br />

I 2010-07-02 BDV Revised disabled toilet layout. Add plaster<br />

strip mesh legend & indicate on plan. Concr.<br />

wall now 250mm. Issue to QS for bill <strong>of</strong><br />

quantities.<br />

J 2010-07-20 BDV Indicate window & door numbers. Concr. lift<br />

shaft now 230 facebrick with concr. columns<br />

by eng. Refinement <strong>of</strong> ablution block. Edit<br />

concr. ro<strong>of</strong> above & omit ro<strong>of</strong> canopies. 2m<br />

high concr. upstand now 1.15m. Parts <strong>of</strong><br />

250mm in-situ sandblasted concr. wall in<br />

lecture halls now 230mm brickwork. Issue to<br />

consultants.<br />

K 2010-08-03 BDV MOVE GRIDLINES C, D, G & H.Brick walls<br />

in lecture halls now cavity walls. 250mm<br />

Concr. wall in lecture halls now brickwork<br />

with conr. columns by eng. D2-5, D2-6 &<br />

D2-7 now single doors. Bridge now 1850<br />

wide. Move D2-12 to male toilets.<br />

Refinement <strong>of</strong> male toilets. Omit D2-13.<br />

Refinement <strong>of</strong> niche for fire hydrant in<br />

ablution block. Edit door numbers in<br />

ablutions block. Issue to consultants.<br />

L 2010-08-06 BDV Floor finish in lift now tiles. Add concr.<br />

upstands in ablution block ducts.<br />

Refinement <strong>of</strong> stair 2 widths. Issue to QS for<br />

bill <strong>of</strong> quantities.<br />

B<br />

B<br />

9030<br />

6 SF1.14<br />

B<br />

SF1-11<br />

6<br />

4800<br />

W2.6<br />

CEILING<br />

B<br />

B<br />

CEILING<br />

7 VOID<br />

600<br />

VOID<br />

7<br />

7660<br />

230<br />

1735<br />

115<br />

5350<br />

D<br />

301<br />

E<br />

11<br />

1098<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

CEILING<br />

VOID<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

SERVICES<br />

D2-9.1<br />

B<br />

DISABLED<br />

WC<br />

STORE<br />

ROOM<br />

CONCRETE<br />

SERVER<br />

ROOM<br />

LINOLEUM<br />

TOC X 1375.150<br />

FFL X 1375.180<br />

DOUBLE<br />

VOLUME<br />

FOYER<br />

MALE<br />

RWDP<br />

8 302<br />

8<br />

230<br />

150Ø uPVC RWDP BUILT<br />

INTO WALL CAVITY<br />

REFER TO SHEET 100<br />

FOR RWDP DETAIL<br />

GALV. STEEL STRUCTURE<br />

FOR CREEPERS<br />

R<br />

308<br />

SF1.16<br />

230<br />

1800<br />

300<br />

1800<br />

2740 230 1350 230 2820 230490<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

90.00°<br />

FIRE STAIR 3<br />

REFER TO SHEET<br />

354 FOR DETAIL<br />

RWDP<br />

LANDING<br />

TOC X 1373.850<br />

TILES<br />

34<br />

35<br />

36<br />

37<br />

1m HIGH S/STEEL H/RAIL<br />

LANDING<br />

TOC X 1376.570<br />

TILES<br />

RWDP<br />

230 1800 4000 1830 230<br />

8090<br />

33<br />

CONCR. ROOF ABOVE<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

7650<br />

230<br />

170 STEP<br />

DOWN<br />

TOC X 1374.980<br />

CONCR. UPSTAND<br />

POWDER COATED ALU. Y-PROFILE<br />

LOUVRES FIXED TO STEEL<br />

STRUCTURE<br />

7660<br />

FAIRFACE IN-SITU CONCR.<br />

COLUMN BY ENG.<br />

230<br />

1735<br />

115<br />

5350<br />

230<br />

1260 300<br />

FALL<br />

RWDP<br />

W2.5<br />

B<br />

B<br />

B<br />

SF1.13<br />

SHELVES<br />

1060 1790 115<br />

TOC X 1375.150<br />

B.O.E.<br />

CILL<br />

SHELVES<br />

D2-9<br />

1000<br />

D2-10<br />

RWDP<br />

B<br />

1m HIGH S/STEEL H/RAIL<br />

PASSAGE<br />

DUCT<br />

FAN<br />

DUCT<br />

LINOLEUM<br />

BRIDGE 2<br />

TILES<br />

1m HIGH S/STEEL H/RAIL<br />

TECHNICIAN<br />

OFFICE<br />

LINOLEUM<br />

D2-6<br />

STORE<br />

ROOM<br />

FIRE<br />

LINOLEUM<br />

DOOR<br />

3490 1300 1000 1300<br />

B B<br />

B B<br />

LOBBY<br />

FHR & 2x LOBBY<br />

TILES<br />

DPC, 80Ø TILES<br />

HYDRANT<br />

D2-13<br />

D2-11<br />

D2-12 H/D<br />

TILES<br />

TOC X 1375.150<br />

UR<br />

W2.4<br />

4800<br />

WC<br />

H/D<br />

HWB<br />

RWDP<br />

FALL<br />

D2-8<br />

FLOOR<br />

SPRING<br />

2230 1510 1840<br />

430<br />

115<br />

HWB<br />

WC<br />

WC<br />

SHELVES<br />

CONCR. ROOF LINE ABOVE<br />

D2-7<br />

RWDP<br />

15<br />

14<br />

13<br />

12<br />

11<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

FEMALE<br />

TILES<br />

TOC X 1375.150<br />

SHELVES<br />

SHELVES<br />

10<br />

9<br />

30<br />

29<br />

28<br />

27<br />

26<br />

STAIR 2<br />

TOC X 1375.150<br />

FFL X 1375.180<br />

1900<br />

LOCKERS<br />

1000 115<br />

TOP<br />

1300<br />

SHELVES<br />

B<br />

D2-14 D2-14.1<br />

44<br />

CLEANING<br />

EQUIPMENT<br />

ROOM<br />

10 m²<br />

TILES<br />

D2-14.2<br />

STAFF<br />

WASH<br />

UP<br />

TILES<br />

SF1-12<br />

TOC X 1372.600<br />

SHELVES<br />

HWB<br />

D2-14.4<br />

BENCH<br />

D2-14.3<br />

WC<br />

SHELVES<br />

SERVICES<br />

W2.1<br />

FALL<br />

RWDP<br />

W2.3 B.O.E. W2.2<br />

CILL<br />

1300 480 1000<br />

115 115<br />

VITREX DOOR AND PANELS AS PER<br />

MANUFACTURER'S SPEC.<br />

B<br />

B<br />

B<br />

1300<br />

2250<br />

1250<br />

SH<br />

230<br />

3455<br />

115<br />

2400<br />

860<br />

1000 230<br />

2600<br />

230<br />

170 STEP<br />

DOWN<br />

CONCR. ROOF ABOVE<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

LANDING<br />

TOC X 1376.570<br />

TILES<br />

RWDP<br />

390230 2820 230 1350 230 2740<br />

33<br />

32<br />

31<br />

30<br />

29<br />

28<br />

27<br />

26<br />

25<br />

24<br />

23<br />

22<br />

21<br />

20<br />

19<br />

18<br />

1m HIGH S/STEEL H/RAIL<br />

CEILING<br />

VOID<br />

10 98<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

230 1730 4000 7990<br />

1800 230<br />

TOC X 1374.980<br />

CONCR. UPSTAND<br />

POWDER COATED ALU. Y-PROFILE<br />

LOUVRES FIXED TO STEEL<br />

STRUCTURE<br />

RWDP<br />

LANDING<br />

TOC X 1373.850<br />

TILES<br />

90.00°<br />

1800<br />

1.15m HIGH FAIRFACE IN-<br />

SITU CONCR. UPSTAND<br />

FIRE STAIR 4<br />

REFER TO SHEET<br />

356 FOR DETAIL<br />

300<br />

1800<br />

230<br />

5930<br />

1800<br />

SF1.9<br />

RWDP<br />

RWDP<br />

D<br />

301<br />

230<br />

3455<br />

115<br />

2400<br />

230<br />

9030<br />

4800<br />

7660<br />

CAD FILE NAME:<br />

<br />

COPYRIGHT RESTS IN THE<br />

UNIVERSITY OF PRETORIA<br />

<br />

<br />

<br />

ARCHITECTURE<br />

<br />

F<br />

302<br />

G<br />

303<br />

H<br />

I J<br />

K<br />

L<br />

M N<br />

O<br />

303 304 304<br />

305 305<br />

306 306 307<br />

600<br />

3010 230 1990 230 740 230 3090 230 1300 480 1000 600<br />

230 230<br />

BRICKWORK<br />

115 115 230 230<br />

830<br />

830 5690<br />

740 6790<br />

DUCT<br />

1060 850 2390 860 4560 860 2390 850 1060<br />

P<br />

307<br />

Q<br />

308<br />

<br />

<br />

<br />

<br />

<br />

7630 13080 2530 2480<br />

14880<br />

ABLUTION BLOCK<br />

4860 2480 2530 13080 7630<br />

GRIDLINES<br />

<br />

<br />

A<br />

B<br />

C<br />

D<br />

E<br />

56300<br />

F<br />

G<br />

H<br />

I<br />

J<br />

<br />

<br />

3 TOC INTERMEDIATE FLOOR PLAN<br />

SCALE 1 : 100<br />

CORNER / COLUMN PROTECTOR<br />

A. 40 X 40 X 3 NATURAL ANODISED ALUMINIUM ANGLE SILICONED TO<br />

PLASTERED CORNER (LENGTH 2000, UNLESS INDICATED OTHERWISE)<br />

BOTTOM TO FLOOR OR TO TOP OF SKIRTING WHERE SKIRTING PRESENT.<br />

FINISHES TO ALL DUCTS:<br />

1. FLOOR:<br />

STEEL TROWELLED, CONCRETE SCREED, FALL TO FLOOR<br />

DRAINS<br />

SKIRTINGS:<br />

NONE<br />

<br />

475/10<br />

<br />

As indicated<br />

<br />

CM & JM<br />

<br />

BDV<br />

PLASTER STRIP MESH LEGEND<br />

B. 1mm THICK x 150mm WIDE GALVANIZED MENTIS STRIP<br />

MESH 210 (OR SIMILAR & APPROVED) LAID IN PLASTER<br />

ACC. TO MANUFACTURER'S SPEC. AT JOINTS BETWEEN<br />

BRICKWORK & CONCR. COLUMNS. PAINT FINISH OVER.<br />

C. AS FOR ABOVE BUT WITH WALL TILES FINISH OVER.<br />

WALLS:<br />

SMOOTH PLASTER & PAINT.<br />

CORNICE:<br />

NONE<br />

SOFFIT:<br />

SMOOTH PLASTER & PAINT.<br />

<br />

04/26/10<br />

<br />

<br />

102<br />

L<br />

<br />

CM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!