SCHEDULE OF FEES AND SERVICE CHARGES<br />

Ordinance O-41-2010<br />

<strong>Effective</strong>: <strong>January</strong> <strong>11</strong>, 20<strong>11</strong>


Table of Contents<br />

Section<br />

I<br />

II<br />

Building<br />

A. Registrations<br />

1<br />

B. Residential Building<br />

1<br />

C. Commercial Building 2<br />

D. Miscellaneous<br />

4<br />

Electrical / Mechanical<br />

A. Residential Electric<br />

5<br />

B. Commercial Electric 5<br />

C. Residential HVAC 5<br />

D. Commercial HVAC 6<br />

E. Other 6<br />

Page<br />

III<br />

Engineering<br />

A. Zoning and Engineering Plat Review <strong>Fee</strong>s<br />

B. Construction Plan Review<br />

C. Engineering Miscellaneous<br />

D. Construction Inspection Services for Street, Water and Sanitary<br />

Sewer Line, Erosion Control Detention/Retention Facilities.<br />

7<br />

8<br />

10<br />

<strong>11</strong><br />

IV<br />

Fire<br />

A. Explosive Materials<br />

B. Fire Hydrants<br />

12<br />

12<br />

V<br />

VI<br />

VII<br />

VIII<br />

IX<br />

X<br />

Miscellaneous<br />

A. Amusement Devices<br />

B. Peddlers and Solicitors<br />

C. Reproduction <strong>Fee</strong>s<br />

D. Rights of Way<br />

E. Sexually Oriented Business Establishments<br />

F. Special Events<br />

G. Miscellaneous<br />

Plumbing<br />

Safety<br />

A. Alarm Systems<br />

B. Miscellaneous<br />

Water and Sewer<br />

Zoning and Planning<br />

A. Planning<br />

B. Zoning<br />

C. Copies/Reproductions<br />

Delegation of Authority and Direction to the City Manager<br />

13<br />

13<br />

13<br />

13<br />

14<br />

14<br />

14<br />

16<br />

17<br />

17<br />

18<br />

20<br />

21<br />

22<br />

23


I. Building<br />

Cross Reference Codified Ordinance Chapter 1300<br />

An additional State fee will be collected per ORC 3781.102(f)(1) to include 3% of the fees collected in connection with<br />

nonresidential buildings.<br />

An additional State fee will be collected per ORC 3781.102(F)(2) to include 1% of the fees collected in connection with<br />

residential buildings.<br />

A. Registrations<br />

B. Residential Building<br />

Contractor and Subcontractor Registration……………………………………………………… $50.00<br />

Annual fee based on calendar year - no proration.<br />

Renewal of Contractor or Subcontractor Registration………...…………………………………$50.00<br />

1. Occupancy<br />

Single Family Residential Certificate of Occupancy; 60 Day Conditional……….…………… $100.00<br />

Single Family Residential Certificate of Occupancy; 180 Day Conditional………...………… $250.00<br />

Conditional Occupancy 60 Day Extension…………………………………………………….<br />

$100.00 / extension<br />

Single Family Residential Certificate of Occupancy …………...……………...………………. $50.00<br />

Escrow - Minimum <strong>Fee</strong>…………………………………………………………………………. $2,500.00<br />

Contractor must provide itemized ed list of outstanding items.<br />

2. Building Plan Review<br />

Single Family Residential, Accessory Buildings, Additions……………………………………. $50.00<br />

Alterations, Restorations, Repairs and Decks…………………….………………………………$25.00<br />

3. Building Permits (License to Construct)<br />

<strong>New</strong> Residential………………………………………………………………………………………$75.00<br />

Plus per square foot…………………………………..………………………………………$0.10 / sf<br />

Revision - see applicable plan review fee above<br />

Addition, Alteration and Repairs …………………………...………………………………………$75.00<br />

• Plus per square foot……………………………...…………..…………………………….$0.10 / sf<br />

Detached Garages/Accessory Buildings……….…………….……………………………………$75.00<br />

• Plus per square foot………………………….…………………………..……….………..$0.10 / sf<br />

Decks…………………………….……...……………………………………………………………$50.00<br />

• Plus per square foot………………………….……….………………..……………..……$0.10 / sf<br />

Minimum Submittal <strong>Fee</strong> (Non-refundable)………………………..………………..….………... $125.00<br />

• Plus zoning fees<br />

Fireplaces (Masonry or Pre-Manufactured)………………….……………………………………$75.00<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 1


• With masonry chimney and foundation<br />

Retaining walls over 4', opaque walls, brick walls requiring foundation, arbors, gazebos<br />

or similar structures…….……………………………………………………………………………$50.00<br />

4. Administrative <strong>Fee</strong>s<br />

Park Improvement <strong>Fee</strong> per Dwelling Unit<br />

• Paid to municipality by each new home builder in the case of a single family<br />

dwelling unit or by the developer or owner in the case of structures containing<br />

more than one dwelling unit for each dwelling unit in said structure……………………$150.00<br />

Leisure Trail Expansion and Repair <strong>Fee</strong> per Dwelling Unit<br />

• Paid to municipality by each new home builder in the case of a single family<br />

dwelling unit or by the developer or owner in the case of structures containing<br />

more than one dwelling unit for each dwelling unit in said structure……………………$350.00<br />

Extension: If in the course of construction, work is delayed or suspended for more than 6<br />

months the approval is invalid. Two extensions shall be granted for 6 months each with<br />

notice by owner 10 days in advance of expiration…………………….………..<br />

$100.00 each<br />

Expiration: The approval of plans, drawings, specifications or data is invalid if<br />

construction, erection, alteration or other work has not commenced within 12 months of<br />

the approval. One extension shall be granted for 12 months with notice by owner 10<br />

days in advance of expiration..................................................................................<br />

Replacement Building Card……………………..………………….…………………………<br />

Recertification of Plans………………………………….………………………………..<br />

Permit Transfer / Contractor t Change………………………………………………………<br />

Lot Transfer<br />

Building <strong>Fee</strong>……………………………………………………………………..……….<br />

Zoning <strong>Fee</strong>……………………………………………………………………………….<br />

$100.00<br />

$25.00 each<br />

$50.00<br />

$50.0000<br />

$50.00<br />

$30.00<br />

C. Commercial Building<br />

Advance Construction Start …………………………………………………………………… $100.00<br />

Reinspection <strong>Fee</strong> (Each Occurrence) ……………………………………………………….. $100.00<br />

Appeal of a Building Code decision………………………………………..………………………$250.00<br />

1. Occupancy<br />

Commercial Buildings; 60 day conditional occupancy…………………………………………..$100.00<br />

Commercial Buildings; 180 day conditional occupancy………………………………………..…$300.00<br />

Conditional Occupancy 60 Day Extension……………………………………………………<br />

$100.00 / extension<br />

Commercial Buildings Certificate of Occupancy - Final………….…...……………...……….. $75.00<br />

Escrow - Minimum <strong>Fee</strong> ……………………………...………….…...……………...……….. $2,500.00<br />

Contractor must provide itemized list of outstanding items.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 2


2. Building Plan Review<br />

Commercial Plan Review <strong>Fee</strong> Per Hour (OBC)……………..……………………………………$65.00 - $75.00/hr<br />

3. Building Permits (License to Construct)<br />

<strong>New</strong> Construction Commercial Building ……….……………………………….…………………$250.00<br />

• Each additional 100 square feet or portion thereof…………………………….…..……$5.00 / 100sf<br />

Alteration, Rehabilitation and Renovation…………….………………...…………………………$200.00<br />

• Each additional 100 square feet or portion thereof………………………………...….…$5.00 / 100sf<br />

Accessory Structures…………………………....………………………………………………….$200.00<br />

Commercial Satellite Dish……..………………………………………..…………………………. $125.00<br />

Cellular Towers and Related Miscellaneous Structures…………………….……………………$250.00<br />

Commercial Swimming Pool Base <strong>Fee</strong>…………………..…………………...……………………$250.00<br />

Antenna tower permit……………………….……………………………………………………… $250.00<br />

Dumpster Enclosures (requiring footings) ..………………………………………………………$30.00<br />

Walls………………………………….……………………………………………………………… $50.00<br />

Retaining walls, opaque walls, brick walls requiring foundation, arbors, gazebos<br />

or similar structures<br />

Minimum Submittal <strong>Fee</strong> (Non-refundable) ………………………………..………...…………... $325.00<br />

4. Administrative <strong>Fee</strong>s<br />

Extension: If in the course of construction, work is delayed or suspended for more than 6<br />

months the approval is invalid. 2 extensions shall be granted for 6 months each with<br />

notice by owner 10 days in advance of expiration…………………………………….<br />

$100.00 each<br />

Expiration: The approval of plans, drawings, specifications or data is invalid if<br />

construction, erection, alteration or other work has not commenced within 12 months of<br />

the approval. 1 extension shall be granted for 12 months with notice by owner 10 days in<br />

advance of expiration..................................................................................<br />

$100.00<br />

Green Building program incentives - reduction in building permit fees - NA Minimum<br />

Standard Met……………………………………………………………………………………<br />

Green Building program incentives - reduction in building permit fees - LEED Certified..<br />

Green Building program incentives - reduction in building permit fees - LEED Certified<br />

Silver………………………………………………………………………………………………<br />

Green Building program incentives - reduction in building permit fees - LEED Certified<br />

Gold……………………………………………………………………………………………….<br />

Green Building program incentives - reduction in building permit fees - LEED Certified<br />

Platinum………………………………………………………………………………………….<br />

20%<br />

21%<br />

22%<br />

23%<br />

25%<br />

Advance Construction Start - plus plan review fees………………………………………… $50.00<br />

Demolition Permit ……………………………………………………………………………… $150.00<br />

Reinspection <strong>Fee</strong> (Each Occurrence) ……………………………………………………….. $100.00<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 3


Appeal of a Building Code decision………………………………………..………………………$250.00<br />

Division of Industrial Compliance fees are established in the <strong>Ohio</strong> Building Code.<br />

D. Miscellaneous (building and zoning)<br />

Special Event Permit<br />

Tent (public use only); larger then 10' x 10' (Inspection during normal business<br />

hours)………………………………………………………………………….………….<br />

$25.00 / group<br />

(Tent inspection fees are charged in groups, regardless of quantity. <strong>Fee</strong>s are<br />

based on groups, ie: 1-5 tents, 6-10 tents, <strong>11</strong>-15 tents etc-fees are not prorated.)<br />

Stage………………………………………………………………………………………. $50.00<br />

Free Standing Bleachers……………………………………………………………….. $50.00<br />

Temporary Generator…………………………………………………….……………… $25.00 / unit<br />

Zoning (to include review of signage, temporary parking site plan, etc. for a<br />

temporary event) …………...……………………………..……………………….. $30.00<br />

Demolition Permit: (includes zoning permit)<br />

• Residential Single Family…………………………….………………..………………….. $50.00<br />

• Non-Residential Structures..…………………….………………..………………….. $150.00<br />

After hours inspections<br />

• First three hours or any part thereof………………………………………...…………… $195.00<br />

• Per hour or any part thereof after first three hours………………………………………$65.00 / hr<br />

Double fees are assessed when work requiring a building or zoning permit is<br />

commenced without such permit.<br />

as applicable<br />

Change of Use Permit………….……………………………………………………………………$250.00<br />

Change of Occupant..……..……….…………………………………………………………………$75.00<br />

Permit to Move a Structure…………………………………………………………………………$80.00<br />

• Zoning permit also required<br />

• Plus the sum of all municipal expenditures to approve same, plus bond, where<br />

applicable, to insure against damages.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 4


II. Electrical / Mechanical<br />

Cross Reference Codified Ordinance Chapter 1300<br />

An additional State fee will be collected per ORC 3781.102(f)(1) to include 3% of the fees collected in connection with<br />

nonresidential buildings.<br />

An additional State fee will be collected per ORC 3781.102(F)(2) to include 1% of the fees collected in connection with<br />

residential buildings.<br />

A. Residential Electric<br />

Residential permit base fee……………..………………………………………………………… $50.00<br />

Residential permit inspection fee……………..……………………………………………………$.03 / sf<br />

Plus per panel ……………………………………….………………………………………………$50.00 / panel<br />

Total Maximum <strong>Fee</strong> $500.00<br />

Temporary Service Drop …………………………………………………….………………………$50.00<br />

Hard-wire Fire Alarm…………………………………………………………………………………$50.00<br />

Generator (back-up)………...…………...………………………………………………………… $50.00<br />

Temporary Generator…………...………...………………………………….....…………….<br />

$25.00 / unit<br />

Low voltage……………………………………………………………………………………………$25.00/each contractor<br />

B. Commercial Electric<br />

1. Commercial <strong>New</strong>, Addition and Alterations<br />

Permit base fee……………………………………………………….………………………………$100.00<br />

Permit Inspection <strong>Fee</strong> …………..……..……………………………………………………… $ .03 / sf<br />

Total Maximum <strong>Fee</strong> ……………………………………………………………………………. $4,000.00<br />

Inspection <strong>Fee</strong> for Installation of <strong>New</strong> Street Lights…………………………………………. $100.00<br />

Temporary service drop…………………………..…………………………………………………$100.00 / each<br />

2. Commercial Repair or Replacement<br />

Permit base fee ...……………………………………..………………………………………. $50.00<br />

Sub-panels, etc. per unit……………………………………..………………………………………$7.00 / each<br />

Electrical Hot Water Heater……………...…………………………………………………………$10.00 / unit<br />

Electric Heating Unit…..…………...………………………………………………………….. $25.00<br />

Hard-wire fire alarm as part of installation……………..………………………………………… $50.00<br />

Inspection fee ……………………………………………………………………………. $ .03 / sf<br />

Low voltage……………………………………………………………………………………………$150.00/each contractor<br />

3. Annual Approval<br />

Annual permit for alteration to existing electrical, gas, or mechanical systems…..…….. $250.00<br />

C. Residential HVAC<br />

<strong>New</strong> Construction base fee……………………………………………………………………..<br />

A combined unit is 1 heating and 1 cooling unit.<br />

Existing dwelling, each unit<br />

Heating Unit ………………………………………………………………………………<br />

$100.00 / combined unit<br />

$50.00 / unit<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 5


Cooling Unit ………………………………………………………………………………<br />

$50.00 / unit<br />

Duct Systems Alteration or Extension of Ducts in an Existing System………………………. $40.00<br />

D. Commercial HVAC<br />

1. <strong>New</strong> or Alteration<br />

Base fee …………………………………………….………………………………………….<br />

Inspection fee ………………………………………………………………………….………<br />

Total Maximum fee …………………………………………………………………….………<br />

2. Replacement, Repair or Individual <strong>New</strong> Units<br />

Heating Unit …………………………….………………………………………………………<br />

Cooling Unit ………………………………………………….…………………………………<br />

VAV or Air Handling Units ……………………………………….……………………………<br />

Refrigeration Units ……………………….…………………………………………………….<br />

Boiler Systems…………………………………….……………………………………………<br />

$100.00<br />

$.03 / sf<br />

$4,000.00<br />

$75.00<br />

$75.00<br />

$75.00<br />

$75.00<br />

$75.00<br />

Duct Work Only…………………………………………………………………………………. $50.00<br />

3. Annual Approval<br />

Annual permit for alteration to existing electrical, gas, or mechanical systems…………. $250.00<br />

E. Other<br />

Gas piping (when separate from building permit)………………..………………………………$50.00<br />

• Plus per valve stop and appliance……..………………………………………………… $15.00<br />

Fire Protection System…………..……….…...………………………………………………<br />

▪ Each additional 100 sq ft ……………….……………………………………………<br />

Kitchen Hood …………………...………………………………………………………………<br />

$50.00<br />

$3.00/100 sf<br />

$100.00 / each<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 6


A. Zoning and Engineering Plat Review <strong>Fee</strong>s:<br />

III. Engineering<br />

Cross References Codified Ordinance Chapter 900 and Part Eleven<br />

1. Subdivision<br />

Preliminary Plat<br />

• 1-25 lots……………………………………………………………..……………………… $155.00 / per lot<br />

• 26-50 lots………………………………………………………….…………………………$3,875.00<br />

• Plus per lot over 26…………………………………………………………………..……. $75.00<br />

• Over 51 lots…………………………………………………….……………………………$5,750.00<br />

• Plus per lot over 50……………………………………………………...………………… $50.00<br />

• Minimum <strong>Fee</strong>………………………………………………….……………………………. $1,000.00<br />

Final Plat<br />

• 1-25 lots………………………………………………………………………………………$155.00 / per lot<br />

• 26-50 lots………………………………………………………………….…………………$3,875.00<br />

• Plus per lot over 26……………………………………...………………………………… $75.00<br />

• Over 51 lots…………………………………………….……………………………………$5,750.00<br />

• Plus per lot over 50…………………………………………...…………………………… $50.00<br />

• Minimum <strong>Fee</strong>……………………………………………………………………………….. $1,000.00<br />

Preliminary Development Plan<br />

• 125l 1-25 lots………………………………………………………………..…………………… $155.00 / per lot<br />

• 26-50 lots……………………………………………………………….……………………$3,875.00<br />

• Plus per lot over 26………………………………………………………………..………. $75.00<br />

• Over 51 lots……………………………………….…………………………………………$5,750.00<br />

• Plus per lot over 50………………………………..………………………………………. $50.00<br />

• Minimum <strong>Fee</strong>…………………………………...………………………………………….. $1,000.00<br />

Final Development Plan<br />

• 1-25 lots……………………………………………..……………………………………… $155.00 / per lot<br />

• 26-50 lots………………………………………………………….…………………………$3,875.00<br />

• Plus per lot over 26……………………………..…………………………………………. $75.00<br />

• Over 51 lots……………………………………….…………………………………………$5,750.00<br />

• Plus per lot over 50………………………………..………………………………………. $50.00<br />

• Minimum <strong>Fee</strong>……………………………………………………………………………….. $1,000.00<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 7


Note: For all condominium developments, an individual condominium unit will be<br />

considered the same as a subdivision lot, even though multiple condominium units<br />

may be represented by only one final plat lot, as the review process requires that<br />

water and sanitary sewer service and side yard and rear lot grading be examined for<br />

each individual condominium unit.<br />

2. Single Site Development<br />

Flat <strong>Fee</strong>……………………………………………….………………………………………………$1,000.00<br />

Resubmission <strong>Fee</strong>……………………………………………………………………………... $500.00<br />

3. Street Only<br />

• For each preliminary plat and final plat submittal<br />

• If a street is proposed with no lots on either side of street…………………………………… $1.00 / L.F.<br />

• If lots are on one side of street, in addition to the per lot subdivision fee above…..……… $0.50 / L.F.<br />

• Minimum <strong>Fee</strong>………….……………………………………………………………………………$1,000.00<br />

B. Construction Plan Review:<br />

1. Subdivisions<br />

For subdivision construction plans<br />

•1-25 lots……………………………………………………………………………………… $240.00 per lot<br />

•26-50 lots……………………………………………………………….…………………….$6,000.00<br />

•Plus per lot over 26……………………………...…………………………………………. $216.00<br />

•51-75 lots………………………………………………………………………………………$<strong>11</strong>,400.00<br />

•Plus per lot over 50……………………………………...…………………………………. $174.00<br />

•76-100 lots………………………………...………………………………………………… $18,500.00<br />

•Plus per lot over 75………………………………………...………………………………. $<strong>11</strong>0.00<br />

•over 100 lots………………………………………………………….………………………$18,500.00<br />

•Plus per lot over 100……………………………..………………………………………… $75.00<br />

•Minimum <strong>Fee</strong>…………………………………………………….………………………….. $1,000.00<br />

An additional fee shall be required for the construction plan review if a stream<br />

having a drainage area of 50 acres or more traverses the subdivision, or a two<br />

acre or more retention pond is required and/or exists in the proposed<br />

subdivision. plus $2,000.00<br />

An additional fee shall be required for the construction plan review if a bike path<br />

is proposed in excess of 500' or if a street crossing is required or if the bike<br />

path is connected to an adjacent subdivision. plus $1,000.00<br />

If a street is proposed within the subdivision for which there are no lots on<br />

either side of the street, a fee shall be required in addition to the per lot fee<br />

above.<br />

plus $6.50 / L.F.<br />

where no lots<br />

The non-refundable fee shall include one (1) review meeting and one (1) review<br />

comment letter if necessary.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 8


The fee for each resubmission shall be based upon the number of lots. This<br />

resubmission fee will include the subsequent plan review, a review letter and a<br />

required meeting, as follows:<br />

•1-25 lots…………….………………….……………………………………………………. $500.00<br />

•26-50 lots…………….…………………………………….…………………………………$1,000.00<br />

•51-75 lots…………….…………………………………………………….…………………$2,000.00<br />

•76-100 lots…………….…………………………………………………………………….. $2,500.00<br />

•over 100 lots…………….………………………………………………….…………………$3,000.00<br />

Note: For all condominium developments, an individual condominium unit will be<br />

considered the same as a subdivision lot, even though multiple condominium units<br />

may be represented by only one final plat lot, as the review process requires that<br />

water and sanitary sewer service and side yard and rear lot grading be examined for<br />

each individual condominium unit.<br />

2. Single Site Commercial, Recreational, or Instructional Development<br />

<strong>Fee</strong>s shall be calculated on acreage as recorded on the current deed or plat.<br />

The non-refundable fee includes up to one (1) review meeting and one (1)<br />

review comment letter.<br />

1 acre or less………………………………………………………………………………….$1,000.00<br />

Greater than 1.00 acre and less then or equal to 2.00 acres……………..……………. $2,000.00<br />

Greater than 2.00 acres and less than or equal to 5.00 acres…………….…………… $3,000.00<br />

Greater than 500 5.00 acres and dless than or equal lto 1000 10.00 acres…………………………$4,000.00<br />

Greater than 10.00 acres and less than or equal to 15.00 acres……….……………… $6,000.00<br />

Greater than 15.00 acres and less than or equal to 50.00 acres ………..………………$7,000.00<br />

Greater than 50.00 acres and less than or equal to 100.00 acres……..……………… $8,000.00<br />

The fee for a project in excess of 100 acres shall be determined by the<br />

Administrator in consultation with the City Engineer.<br />

An additional fee shall be required for the construction plan review if a stream<br />

having a drainage area of 50 acres or more traverses the site, or a two acre or<br />

more retention pond is required and/or exists on this site……………..….. plus $2,000.00<br />

Re-submission<br />

This re-submission fee includes the subsequent plan review, a review letter and<br />

a required meeting………………………………….……………….………… $500.00<br />

3. Storm, sanitary sewer, or waterline extension outside of a single-site<br />

non-residential development:<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 9


This shall include storm sewers required in existing or proposed public right-ofway<br />

or relocated sanitary sewer in existing easements. If exact sewer lengths<br />

are unknown at preliminary stage, the developer's engineer shall submit an<br />

estimated length for the purpose of a deposit and any additional fee to cover<br />

final quantities will be billed by the Finance Director prior to signing of plans.<br />

This fee shall include one (1) subdivision and one (1) follow-up review<br />

letter..................................................................................<br />

$750.00 for lengths less<br />

than 750 ft.; $1.00 / L.F.<br />

lengths greater than 750<br />

ft; $0.50 / L.F. for each<br />

subsequent review.<br />

4. Street Only<br />

For proposed streets where there are no lots on either side of the street, the fee<br />

is determined by the lineal feet, including storm sewers, sanitary sewers and<br />

water lines.<br />

$6.50/L.F.<br />

• Minimum <strong>Fee</strong> $500.00<br />

5. Public or private sanitary sewer, or drainage channel, or storm sewer, or public water<br />

Line extensions outside a subdivision.<br />

C. Engineering Miscellaneous:<br />

To include two (2) plan reviews………………………………………………………………$1.00 / L.F. for each<br />

Each subsequent plan review……………………………………………………………… $0.50 / L.F. for each<br />

If the exact lengths are unknown at preliminary stage an estimated length will<br />

be accepted with the application. When final quantities are determined, any<br />

necessary additional fees will be invoiced prior to signing of plans.<br />

•Minimum <strong>Fee</strong>…………………………………………………………………………………$500.00<br />

Open channel relocation……….……………………………………………………………………$8.00/L.F.<br />

•Minimum <strong>Fee</strong>…………………...…………………………………………………………… $700.00<br />

Traffic impact-access or turn lane study or other traffic related studies……..…………………$1,000.00<br />

Channel relocation in subdivisions…………………………………………………………………$1,000.00<br />

•Hydraulic study required to ensure 100 year flood elevation is not increased.<br />

Right of Way Dedication Plat……………………………………..…………………………………$500.00<br />

Annexation Plat………………………………………………………………………………………$600.00<br />

Hydraulics and Adequacy of Drainage Structure Over Waterways and Weirs<br />

•Less then 20' span……………………………………………………………………………$1,000.00<br />

•20' - 40' span…………………………………………………………………………………$2,000.00<br />

•over 40' span…………………………………………….……………………………………$2,500.00<br />

Flood plain encroachment where hydraulic study is required to ensure 100 year flood<br />

elevation is not increased…………………………………………………..………………………$1,000.00<br />

Review of Off Site Detention/Retention Facility……………………………………………………$1,000.00<br />

Development Plan/Concept Plan (see C.O. <strong>11</strong>87)………….……………………………………$250.00<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 10


D. Construction Inspection Services for Street, Water and Sanitary Sewer Line,<br />

Erosion Control Detention/Retention Facilities: See Codified Ordinance 909.04 for<br />

further information.<br />

Construction Cost Estimate Under $100,000<br />

Construction Cost Estimate Over $100,000<br />

<strong>11</strong>% of Estimate<br />

7% of Estimate<br />

If the fee is insufficient to cover unanticipated delays (i.e. rock, excessive<br />

water, stop work orders, etc.) change orders, an additional fee will be required.<br />

This additional fee will be calculated by applying the applicable percentage<br />

used in calculation of the inspection fee to the amount of the City Engineer's<br />

estimate of change construction cost. Any remaining balance at the conclusion<br />

of the project, following final acceptance by the City, may be refunded or<br />

credited toward future construction inspection services.<br />

Two-(2) Year Warranty Engineering Inspection Services<br />

2.5% of initial inspection<br />

fee<br />

A certified check in the amount of two and a half percent (2.5%) of the initial<br />

inspection fee shall also be provided to the City prior to acceptance of the<br />

subdivision. This check will be applied toward the two-(2) year maintenance<br />

inspection by the City.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. <strong>11</strong>


IV. Fire<br />

Cross Reference Codified Ordinance Chapter 1500<br />

A. Explosive Materials:<br />

Permit <strong>Fee</strong> Application (Blasting)…………….…………………………………………………… $200.00<br />

• Remitted when application is submitted.<br />

• Blasting prohibited within 300 feet of any dwelling.<br />

B. Fire Hydrants:<br />

Fire Hydrant Permit <strong>Fee</strong> - Per Day…………………………………………………………………$25.00<br />

• <strong>Fee</strong> is due when permit is issued.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 12


A. Amusement Devices:<br />

Amusement Devices - Mechanical or Electrical………………………………………………… $25.00 / year<br />

Amusement Arcades………….………………………………………………………………………$25.00 / year<br />

• The license fees paid for a calendar year for mechanical or electronically<br />

operated amusement devices and coin operated billiard tables shall be prorated as follows:<br />

► <strong>January</strong> - March………………………..……………………………………………………. $25.00<br />

► April - June……………………………………………….……………………………………$20.00<br />

► July - September………………………………………………………………………………$15.00<br />

► October - December……………………………………………………………………….…$10.00<br />

Coin Operated Billiard Tables - License <strong>Fee</strong> Per Table Per Year…….…………………………$24.00<br />

Coin Operated Billiard Tables - License <strong>Fee</strong>…………..…………………………………………Pro-rated<br />

Transfer of License and Registration - Device Transfer <strong>Fee</strong>…..……………………………… $2.00<br />

B. Peddlers and Solicitors:<br />

V. Miscellaneous<br />

Cross References Codified Ordinance Chapters 300, 500, 700, 900, <strong>11</strong>00 and 1300<br />

Peddlers and Solicitors - License <strong>Fee</strong>……….……………………………………………………$10.00 / day<br />

$25.00 / week<br />

$50.00 / month<br />

$250.00 / year<br />

C. Reproduction <strong>Fee</strong>s:<br />

Reproduction/paper copies (more than 20 pages)………..………………………………………$0.05<br />

Reproduction of Audio CD Public Record - Copy…………………………………………….<br />

$10.00<br />

Reproduction of Digital Video Public Record - Copy ……………………………………….. $10.00<br />

Reproduction of Digital Image Public Records - Disk Provided by Requestor<br />

• Less than 20 images………………………………………………………………………. $5.00<br />

• 20-40 images…………………………………………….……………………………………$10.00<br />

• Cost per each 20 images above 40…….…………………………………………………$5.00<br />

Transfer of Digital Images to Photographic Paper<br />

• Commercial Film Development Copy of Digital Images..…………….……………. $10.00<br />

• Black and White Laser Printer Copy of Digital Images…………………………………$0.25 / page<br />

• Color Inkjet Printer Copy of Digital Images…………………..……………………………$0.40 / page<br />

D. Rights Of Way: Please refer to Codified Ordinance <strong>11</strong>78 for Complete Regulation<br />

Telecommunications and Utility permittees<br />

► Permittees utilizing equal to or greater than thirty (30) miles of right-of-way shall<br />

pay a fee of three thousand dollars ($3,000.00) per year.<br />

Permittees utilizing less than thirty (30) miles of right-of-way shall pay a fee of<br />

one thousand dollars ($1,000.00) per year<br />

$3,000.00/year<br />

ROW 30 miles or greater<br />

$1,000.00/year<br />

ROW less than 30 miles<br />

Special permittees<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 13


► Permittees using or occupying right-of-way shall pay an annual fee of ten cents<br />

($0.10) per linear foot of right-of-way used or occupied. $0.10 / L.F. of ROW/year<br />

Such fee shall be paid in advance for each year prior to <strong>January</strong> 31. Partial<br />

year permits shall be prorated.<br />

Residential permittees shall pay no annual fee.<br />

Work permit<br />

• In addition to the annual fees set forth above, permittees shall pay a work<br />

permit fee and shall post a performance bond in an amount determined by the<br />

Administrator or his designee. Said fees are payable at the time the application<br />

is made for the work permit.<br />

• Resubmittal ……………………………………………………………..………...……<br />

$75.00 + Performance<br />

Bond<br />

$50.00<br />

E. Sexually Oriented Business Establishments:<br />

Business License Administrative Processing <strong>Fee</strong>……………………………………………… $100.00<br />

F. Special Events<br />

Business License Annual <strong>Fee</strong>……….………………………………………………………………$500.00<br />

Police Department Personnel………………………………………………………………….<br />

Police Cruiser ……………………………………………………..………..…………...<br />

Public Service Department Personnel…………………………….………………………….<br />

After Hours Public Service Department Personnel….……………………………………….<br />

Public Service Department Truck and Trailer……...………………………………...………<br />

Overtime rate or other<br />

contracted rate<br />

$10.00 / hour<br />

$30.00 / hour<br />

$45.00 / hour<br />

$16.50 / hour<br />

If Public Service Department personnel are required to work during the event, necessary<br />

equipment will be provided at no cost. When Service Department personnel are not<br />

working the event, the following rental costs* will be assessed:<br />

Temporary No-Parking Signs………………………………………………………………..<br />

Traffic Cones…………………………………………………………………………………..<br />

Road Barricades………………………………………………………………………………<br />

Installation and Removal of Street Pole Banners for Events……………………………….<br />

$0.50 / sign<br />

$1.00 / cone<br />

$12.00 / barricade<br />

$20.00 / pole<br />

* A replacement fee (at replacement cost) will be charged for all rental equipment that is<br />

damaged or lost.<br />

G. Miscellaneous<br />

Address Requests to Changes to Current Address……….………………………………………$2.00 / address<br />

Annexation Petition Filing <strong>Fee</strong>.……………………………………………...………………………$50.00<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 14


Damage to Public Property………….………………………………………………………………Material Cost +<br />

Labor Cost*<br />

* Defined as all applicable direct costs including, but not limited to, salaries,<br />

wages, overtime, services and supplies, maintenance and operating expenses,<br />

contracted services, special supplies, and any other direct expenses incurred.<br />

The costs, in most cases, will be rounded to the nearest ten dollars. ($10.00)<br />

Drainage Under Driveway ………………………………………………………………………… $50.00<br />

Public Service Department Vehicles and Equipment………..………………………………<br />

Most current FEMA<br />

(Federal Emergency<br />

Management Association)<br />

schedule of equipment<br />

rates.<br />

Vehicle Impound<br />

Towing (seized/forfeited vehicles) …………………………………………...…… $50.00 (+)<br />

Storage<br />

$6.00 / per day<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 15


VI. Plumbing<br />

<strong>Fee</strong>s charged by <strong>New</strong> <strong>Albany</strong> shall be those promulgated and adopted by the Franklin County Board of Health or the Licking County<br />

Health Department (as applicable).<br />

A copy of the Franklin County Board of Health or the Licking County Health Department fee schedule is made available at the<br />

Community Development Office or be contacting the Franklin County Board of Health or the Licking County Health Department.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 16


VII. Safety<br />

Cross Reference Codified Ordinance Chapter 700<br />

A. Alarm Systems:<br />

B. Miscellaneous:<br />

Alarm User Permit……………..…………………………………………………………………… Required/No Charge<br />

False Alarm <strong>Fee</strong><br />

• 0-3 False Alarms per Calendar Year………..…………………………………………… No Charge<br />

• 4-8 False Alarms per Calendar Year………………………..…………………………… $25.00 Each<br />

• 9 or More False Alarms per Calendar Year………………….……………………………$50.00 Each<br />

Each false alarm response shall constitute a separate false alarm. Any<br />

response to a false alarm to a municipal address by another agency, in lieu of<br />

response by <strong>New</strong> <strong>Albany</strong> Police Department because of mutual aid or<br />

automatic response agreements, shall constitute a false alarm. No person<br />

who is either the holder of an alarm user permit or responsible for the alarm<br />

system operation shall negligently allow such alarm to register nine or more<br />

false alarms within a calendar year.<br />

Fingerprinting;<br />

Rolled Prints……………………………………………………………………………… $10.00 / card<br />

BCI (State) - Resident*………………………………………………………………….. $25.00<br />

BCI (State) - Non-Resident**……………………………………………………………. $35.00<br />

FBI (National) - Resident*……………………………………………………………….. $30.00<br />

FBI (National) - Non-Resident**………………………………………………………… $40.00<br />

*Resident is defined as an individual residing within the <strong>New</strong> <strong>Albany</strong> corporation<br />

limits or an individual working at a business located within the <strong>New</strong> <strong>Albany</strong><br />

corporation limits.<br />

**Non-Resident is defined as an individual that does not reside or work within<br />

the <strong>New</strong> <strong>Albany</strong> corporation limits.<br />

Safety Town Program ...……………………………………………………..…………………<br />

Safety Town - Bricks ……...……………………………………………………………...……<br />

$60.00 / child<br />

$50.00 each<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 17


Sewer Lines - Cleaning………………….……………………………………………………………Varies; Cost of<br />

labor, materials,<br />

and equipment.*<br />

Water Tap<br />

Tap fees for structures built ………………………………………………………………………<br />

3/4"<br />

1"<br />

1 1/2"<br />

2"<br />

3"<br />

4"<br />

6"<br />

8"<br />

10"<br />

VIII. Water and Sewer<br />

Cross References Codified Ordinance Chapters 933 & 935<br />

Water Capacity <strong>Fee</strong>s<br />

Shall be charged to structures built after 5/20/99 at 60% of current Columbus rate<br />

Water Front Footage <strong>Fee</strong>s<br />

Front footage fees for water mains constructed at the municipality's expense shall be<br />

charged at the rate which is equal to the construction cost for the property to be<br />

served. Based on the following formula:<br />

before 7/1/1990 : after 7/1/1990<br />

$75.00 : $175.00<br />

$150.00 : $350.00<br />

$200.00 : $450.00<br />

$250.00 : $500.00<br />

$300.00 : $600.00<br />

$350.00 : $700.00<br />

$400.00 : $850.00<br />

$500.00 : $1,000.00<br />

$600.00 : $1,200.00<br />

Total Cost of Construction<br />

Total Frontage Served<br />

x<br />

Frontage of Lot Served<br />

Total Cost of Construction excludes engineering fees.<br />

Sewer Tap<br />

Tap fees for structures built…<br />

3/4"<br />

1"<br />

1 1/2"<br />

2"<br />

3"<br />

4"<br />

6"<br />

8"<br />

10"<br />

before 7/1/1990 : after 7/1/1990<br />

$100.00 : $130.00<br />

$200.00 : $260.00<br />

$300.00 : $390.00<br />

$400.00 : $520.00<br />

$500.00 : $650.00<br />

$600.00 : $780.00<br />

$700.00 : $910.00<br />

$800.00 : $1,040.00<br />

$900.00 : $1,170.00<br />

Sewer <strong>New</strong> <strong>Albany</strong> Capacity <strong>Fee</strong><br />

Shall be charged to structures built after 5/20/99 at 50% of current Columbus rate<br />

Sewer Columbus Capacity <strong>Fee</strong><br />

Shall be charged at current Columbus rate<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 18


Sewer Inspection <strong>Fee</strong><br />

Base fee………………………………………………………………………………………………$85.00<br />

if more than 100'……………………………………………………………………………………. $2.80 / ft<br />

Sewer Front Footage <strong>Fee</strong>s<br />

Front footage fees for water mains constructed at the municipality's expense shall be<br />

charged at the rate which is equal to the construction cost for the property to be<br />

served. Based on the following formula:<br />

Total Cost of Construction<br />

Total Frontage Served<br />

x<br />

Frontage of Lot Served<br />

Greywater Systems Tap <strong>Fee</strong><br />

8" ……...………………………………………………………………………………………………$74,604.80<br />

10" …………………………………………………………………………………………………… $107,244.80<br />

12" …………………………………………………………………………………………………… $200,500.80<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 19


IX. Zoning and Planning<br />

Cross Reference Codified Ordinance Part Eleven<br />

A. Planning<br />

1. Plat<br />

Road, preliminary………….…………………………………………………………………… $350.00<br />

Road, final…………….…………..……………………………………………………………. $350.00<br />

Subdivision, preliminary………………………….……………………………………………. $650.00<br />

• Plus each lot…………………………………………………………………………………. $50.00<br />

Subdivision, final………………………………………………………………………………… $650.00<br />

• Plus each lot…………………………………………………………………………………. $15.00<br />

*Additional Engineering <strong>Fee</strong>(s) Also Due (See Section III)<br />

Amendment to Final Plat……….……………………………………………………………………$600.00<br />

2. Development Plans<br />

PUD - Preliminary Development Plan<br />

• First 10 acres……………..…………………………………………………………………$750.00<br />

Plus $50.00 for each additional 5 acres or part thereof (Charged in $50.00<br />

increments)<br />

*Additional Engineering <strong>Fee</strong>(s) Also Due (See Section III)<br />

PUD Final Development Plan<br />

• First 10 acres…………………………………………………………………………………$650.00<br />

Plus $50.00 for each additional 5 acres or part thereof (Charged in $50.00<br />

increments)<br />

*Additional Engineering <strong>Fee</strong>(s) Also Due (See Section III)<br />

Architectural Review Board Development Plan review (non-PUD)…………………………… $300.00<br />

Amendment to PUD text or Development Plan……………………………………………………$600.00<br />

3. Variance<br />

Variance (non-single family, commercial, subdivision, multiple properties)……………………$600.00<br />

Variance (single family residential)…………………………………………………………………$250.00<br />

Variance - in addition to Certificate of Appropriateness..…………………………………………$100.00<br />

4. Conditional Use<br />

Conditional Use ………………….……………………………………………………………………$600.00<br />

5. Rezoning<br />

Rezoning of Land (Zoning Change/Zoning Amendment)<br />

(fee not charged if I-PUD rezoning)<br />

• First 10 acres………………………………………………..………………………………$700.00<br />

Plus $50.00 for each additional 5 acres or part thereof (Charged in $50.00<br />

increments)<br />

Rezoning to Rocky Fork Blacklick Accord…………………………………………………………$250.00<br />

6. Certificate of Appropriateness<br />

Architectural Review Board<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 20


Single and Two-Family Residential…………………………………………………………$100.00<br />

All other Residential and Commercial……………………………………………………...$300.00<br />

Signage…………………………………………………………………………………………$75.00<br />

Staff Review<br />

Single and Two-Family Residential…………………………………………………………$50.00<br />

All other Residential and Commercial………………………………………………………$250.00<br />

Minor Environmental change per section <strong>11</strong>57.03(g)………………………………… $50.00<br />

Construction Site Setup…………………………………………………………………. $50.00<br />

(to include trailers, signage fencing etc.)<br />

7. Miscellaneous Planning<br />

Lot Split………………….……………………………………………………………………………$200.00<br />

Lot Combination………………………………………………………………………………………$200.00<br />

Lot Line Adjustment…………..………………………………………………………………………$200.00<br />

Minor Commercial Subdivision………………………………………………………………………$200.00<br />

Easement Encroachment………..………………………………………………………………… $800.00<br />

Easement Vacation…………………..………………………………………………………………$1,200.00<br />

Street Vacation…………………………………………………………………………….…………$1,200.00<br />

8. Administrative<br />

Appeal from inspection, interpretation or code decision……………..………………………… $250.00<br />

Floodplain Inquiry Response; written request…………………………………………………… $70.00<br />

(fee not to apply to residents when for non-commercial purposes)<br />

Written notice of required public hearing (neighbor letters)<br />

Up to 50 included in base fee……………………………………………………………….$0.00<br />

For more than 50………………………………………………………………………………$2.00 / letter<br />

B. Zoning<br />

1. Signs<br />

Sign Package……………………………………………………………………………………. $75.00<br />

for each additional sign………………………………………………………………….. $15.00 / each additional<br />

Sign Permit*……………………………………………………..……………………………………$75.00<br />

Sign Permit & Inspection <strong>Fee</strong>s-Alterations to Existing Signs*………………………………… $50.00<br />

Temporary Sign Permit*………………………………………………………………………….<br />

Sign Permit with Prior ARB Approval*……………………………………………………….<br />

no fee<br />

no fee if ARB fee paid<br />

2. Zoning Permit<br />

Zoning Permit* / Compliance …….…………………………………………………………………$30.00<br />

Zoning Permit Revision* …...………………………………………………………………….. $15.00<br />

Recertification of Plans…………………………………………………………………………. $30.00<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 21


3. Property Maintenance Code<br />

Administrative Processing <strong>Fee</strong>……………………..…………………………………………. $125.00<br />

Appeal from inspection, interpretation or code decision……….………………………….. $250.00<br />

4. Administrative<br />

Appeal from inspection, interpretation or code decision……………..………………………… $250.00<br />

Zoning Inquiry Response; Written Request…………….…………………………………………$70.00<br />

(<strong>Fee</strong> not to apply to residents when for non-commercial purposes.)<br />

Floodplain Inquiry Response; written request…………………………………………………… $70.00<br />

(fee not to apply to residents when for non-commercial purposes)<br />

C. Copies/Reproductions<br />

1. Plans<br />

Triangle Plan..………………………………………………………………………………..………$4.00<br />

Rocky Fork-Blacklick Accord book…………………………………………………………………$17.00<br />

Strategic Plan Book……………….…………………………………………………………………$30.00<br />

Village Center Plan …………………..…………………….……………………………………… $15.00<br />

Economic Development Plan……………………………………………………...……………… $25.00<br />

Leisure Trail Plan…………………………………………………………………………………… $7.00<br />

2. CD's<br />

Miscellaneous Plan or Study CD………….…………………………………………………………$3.00<br />

Strategic Plan CD………………………………………..……………………………………………$3.00<br />

Rocky Fork-Blacklick Accord CD $3.00<br />

Village Center Plan……………………………………………………………………………………$3.00<br />

Economic Development Plan……………………………………………………………………… $3.00<br />

Leisure Trail Plan…………………………………………………………………………………… $3.00<br />

3. Maps<br />

Miscellaneous Maps…….……………………………………………………………………………$10.00<br />

Zoning Maps (Black & White) …….…………………………………………………………………$10.00<br />

Zoning Maps (Color) ………….…………………………………………………………………… $35.00<br />

Street Maps…….…………………………………………………………………………………… $10.00<br />

Subdivision Maps………………………………….…………………………………………………$10.00<br />

4. Other<br />

Zoning Code………………………………………………………………………………………… $25.00<br />

Reproduction/paper copies (more than 20 pages)…………………..……………………………$0.05/page<br />

Reproduction of oversize plans (using commercial printing service)…………………………… at cost<br />

* Double fees are assessed when work requiring a building or zoning permit is commenced without such permit.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 22


X. Delegation of Authority and Direction to the City Manager<br />

The City Manager is hereby delegated the authority to issue orders defining terms, setting out administrative<br />

fee collection, and financial procedures, definitions, and establishing effective dates of all the fees as set forth<br />

by Ordinance.<br />

The City Manager may vary the review schedule listed in the section if, in the judgment of the City Manager<br />

and a directly requesting Department Head, a gross inequity would be perpetrated by the revisiting a fee or<br />

charge prior to the next rate review.<br />

Any such special rate review shall be reported to Council at it's next<br />

succeeding meeting where Council may revise the fee or charge by the Ordinance.<br />

If fees are not collected at the time that the service is provided, the City of <strong>New</strong> <strong>Albany</strong> has the right to pursue<br />

collection of any of the fees listed in this Ordinance, including certification to the County Auditor, remittance to<br />

a collection service, or any other appropriate pursuit for payment.<br />

Should it become necessary to establish a new service fee or charging during the year, the City Manager may<br />

set the fee administratively.<br />

Any such fees set by the City Manager shall be reported to Council at it's next<br />

succeeding meeting where Council may revise the fee or charge by the Ordinance.<br />

Irrespective of the percentage of recovery, Council reserves the right to waive any fee in order to encourage<br />

development projects that enhance <strong>New</strong> <strong>Albany</strong>'s tax base as outlined in the Strategic Plan. The City Manager<br />

may recommend further waivers or fee adjustments, based on hardships, to be accepted or rejected by Council<br />

at its next scheduled meeting.<br />

All Ordinances, the Codified Ordinances of <strong>New</strong> <strong>Albany</strong>, Resolutions, Council motions, and all action of Boards<br />

and Commissions in conflict here within are hereby repealed. The fees and charges established herein shall<br />

supersede all previously established fees or charges for the same regulation, product or service, and all such<br />

fees, charges are hereby repealed on the effective date of the Order of the City Manager.<br />

Adopted via O-41-2010 on 1.<strong>11</strong>.20<strong>11</strong>. <strong>Effective</strong> 1.<strong>11</strong>.20<strong>11</strong>. 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!