GROUND HANDLING AND<br />

SERVICING HANDBOOK<br />

GHSH TASK 12-14-01-610-801-A<br />

1. Servicing of Emergency/Parking Brake Accumulator<br />

A. General<br />

(1) This section gives the procedure to charge the emergency/parking brake<br />

accumulator with nitrogen.<br />

B. Job Set-Up<br />

(1) Do the procedure to make the aircraft safe for maintenance (GHSH TASK<br />

20-00-00-910-801-A/200).<br />

(2) Put wheel chocks at the landing gear wheels.<br />

(3) Open access door 191BL.<br />

(4) Energize the aircraft with an external DC power supply (GHSH TASK 24-<br />

41-00-860-801-A/200).<br />

(5) Release the pressure from the hydraulic system (GHSH TASK 29-10-00-<br />

910-801-A/200).<br />

C. Servicing of Emergency/Parking Brake System<br />

(1) Remove the cap from the charging valve.<br />

(2) Connect the hose of the nitrogen A-A-59503 cylinder with an outlet connection<br />

to the charging valve.<br />

(3) Open the cylinder valve and actuate the pressure regulating valve to<br />

adjust the pressure.<br />

(4) Open the charging valve.<br />

(5) Stop the nitrogen supply when the pressure shown on the synoptic page of<br />

the CAS is according to the chart.<br />

(6) Close the cylinder valve.<br />

(7) Close the charging valve.<br />

(8) Repeat the next two steps until the nitrogen pressure is stable at the value<br />

given in the chart.<br />

(9) Look at the synoptic page of the CAS to see if the nitrogen pressure<br />

stayed stable.<br />

NOTE: Wait 10 minutes for the nitrogen pressure to become stable.<br />

(10)If necessary, adjust the nitrogen pressure again until it stays stable. To do<br />

so, open the cylinder valve and actuate the pressure regulating valve to<br />

adjust the pressure. (Refer to the chart).<br />

(11)Use a torque wrench to tighten the charging valve nut from 5.6 to 6.8 N.m<br />

(50 to 60 lb.in).<br />

(12)Do an inspection of the charging valve for leakage.<br />

(13)Use a torque wrench to install and tighten the cap from 1.5 to 3.5 N.m<br />

(13.3 to 31.0 lb.in).<br />

D. Job Close-Up<br />

CAUTION: NO NITROGEN LEAKS ARE PERMITTED. IF A LEAK IS<br />

EFFECTIVITY: ALL<br />

Copyright © by <strong>EMB</strong>RAER S.A. - All rights reserved - See title page for details.<br />

12-14-01-610-801-A/300<br />

Page 301<br />

Rev.07 - DEC 11/09<br />

HARD COPY IS UNCONTROLLED. ONCE PRINTED, THIS PAGE MUST NOT BE RETAINED FOR FUTURE REFERENCE.<br />

BEFORE USING, MAKE SURE THIS HARD COPY IS THE LATEST ISSUE.