18.02.2015 Views

IOM Manual

IOM Manual

IOM Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TRANE ®<br />

Unit Installation - Outdoor Unit<br />

Installation Clearances<br />

Provide enough space around the unit<br />

to allow unrestricted access to all<br />

service points. Refer to unit space<br />

clearance data for minimum required<br />

service and free air clearances.<br />

Observe the following points to insure<br />

proper unit operation.<br />

Refer to table 2 for reccomended<br />

spacing.<br />

a. Don't install the unit under low shield.<br />

Keep discharge air freely.<br />

Ground Level Mounting<br />

The unit base should be adequately<br />

supported and hold the unit near level.<br />

Any ground level location must comply<br />

with the required clearances. Place the<br />

unit on a 102 mm cement support plate.<br />

The support should extend 51mm<br />

beyond the unit base channel at all<br />

points. The unit and support should be<br />

Isolated from any adjacent structure to<br />

prevent possible noise or vibration<br />

problem.<br />

Important: Don't block discharge air.<br />

This can result in warm air recirculation<br />

through the coil.<br />

b. Don't locate the unit in a position<br />

where runoff water can drop into the fan<br />

discharge openings.<br />

c. Intake air can be supplied from 2<br />

sides of unit.<br />

Rooftop Mounting<br />

If the unit is roof mounted, be sure the<br />

structure is strong enough to support<br />

the overall weight of the unit and all<br />

accessories. Refer to Table 1 for unit<br />

weight details.<br />

Warning: Ensure the structure is strong<br />

enough to support the gross weight of<br />

unit and its accessories. Failure to do<br />

will result in severe injury or death and<br />

can seriously damage the unit and<br />

building.<br />

The unit should be elevated on a<br />

horizontal, field-fabricated 102 mm steel<br />

frame or 100 X 100 mm wooden<br />

mounting frame. Complete the frame<br />

and fix it firmly on the roof. The frame<br />

must support a minimum of three of the<br />

unit' s four sides and can span the roof<br />

supports to distribute the load on the<br />

roof.<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!