CERES FM1-FM6 Instrument Status Report - NASA
CERES FM1-FM6 Instrument Status Report - NASA CERES FM1-FM6 Instrument Status Report - NASA
FM-5 TVAC Internal Cal Results CERES is the only instrument with no outstanding instrument or science related TAWSs. NASA Langley Research Center / Science Directorate!
NPP Path to Launch – Ground System Prep •! •! •! •! Update NPP RDR Preprocessor software to fix issues discovered during NCT 3 Part II. " –! Delivery to CERES CM May 6 (L-5 months)." Update NPP Instrument Main Processor software to fix issues discovered during TVAC and NCT 3 Part II. " –! Delivery to CERES CM May 13 (L-5 months)." Provide updated instrument parameters, gains, spectral response functions, etc. (Scan dependent offsets set to zero, Second Time Constant correction turned off) " –! Delivery to CERES CM July 25 (L-3 months). " Flight Verification of NPP RDR Preprocessor/Instrument Main Processor during NCT 4 (7/5-18/11). " –! Delivery any final updates CERES CM 2 weeks after NCT 4 (L-3 months)." NASA Langley Research Center / Science Directorate!
- Page 1 and 2: CERES Instrument and Calibration St
- Page 3 and 4: Instrument Working Group Personnel
- Page 5 and 6: Instrument and ERBE-Like Processing
- Page 7 and 8: Why is CERES Climate Quality Calibr
- Page 9 and 10: Enabling Climate Data Record Contin
- Page 11 and 12: EOS Status NASA Langley Research Ce
- Page 13 and 14: Terra/Aqua Instrument and ERBE-Like
- Page 15 and 16: CERES Calibration Input Parameters
- Page 17 and 18: CERES Flight Project Organization N
- Page 19 and 20: CERES FM5 Hardware Status & Near-Te
- Page 21: CERES FM-5 on NPP TVAC Timeline 48
- Page 25 and 26: Aqua/Terra and NPP Intercomparison
- Page 27 and 28: Aqua and NPP : Matched Sites 8 day-
- Page 29 and 30: Summary NPP Mission Video NASA Lang
- Page 31 and 32: CERES FM6 Status & Near-Term Activi
- Page 33 and 34: BACK-UP SLIDES NASA Langley Researc
- Page 35: ASIC 3 (2006) Workshop Recommendati
NPP Path to Launch – Ground System Prep<br />
•!<br />
•!<br />
•!<br />
•!<br />
Update NPP RDR Preprocessor software to fix issues discovered<br />
during NCT 3 Part II. "<br />
–! Delivery to <strong>CERES</strong> CM May 6 (L-5 months)."<br />
Update NPP <strong>Instrument</strong> Main Processor software to fix issues<br />
discovered during TVAC and NCT 3 Part II. "<br />
–! Delivery to <strong>CERES</strong> CM May 13 (L-5 months)."<br />
Provide updated instrument parameters, gains, spectral response<br />
functions, etc. (Scan dependent offsets set to zero, Second Time<br />
Constant correction turned off) "<br />
–! Delivery to <strong>CERES</strong> CM July 25 (L-3 months). "<br />
Flight Verification of NPP RDR Preprocessor/<strong>Instrument</strong> Main<br />
Processor during NCT 4 (7/5-18/11). "<br />
–! Delivery any final updates <strong>CERES</strong> CM 2 weeks after NCT 4 (L-3 months)."<br />