CERES FM1-FM6 Instrument Status Report - NASA
CERES FM1-FM6 Instrument Status Report - NASA CERES FM1-FM6 Instrument Status Report - NASA
CERES Compatibility with NPP Spacecraft .108m ST1 ST2 3.720m 4.026m .141m BCL RADIATOR VIIRS RADIATOR RF ACCESS DOOR SSW1 ATMS RADIATOR VIIRS OM 75° VIIRS EM ATMS PROPULSION MODULE SSW2 +X (Velocity) OMPS +Z (Nadir) CERES Observatory Information !! Launch Readiness October, 2011 !! Location - Vandenberg AFB !! Launch Vehicle - Delta II !! Altitude - 824 Km -! CERES FOV increases to ~ 24Km !! Inclination - Sun-Synch, 98.7-deg !! Crossing Time - 1:30pm, Ascending !! Payload - -! CERES -! VIIRS -! OMPS -! CRIS -! ATMS NASA Langley Research Center / Science Directorate!
CERES FM5 Hardware Status & Near-Term Activities •! Fabrication, Assembly and Test Program is complete –! Ground Calibration was most extensive to date in the CERES Program •! System Acceptance Review 10/30 at NGST •! Shipped to BATC on 11/2/09 •! Mechanical/Electrical Integration to NPP spacecraft completed 11/11/08 •! Observatory Pre-environmental Test Readiness Review 9/20-21/10 •! Spacecraft Environmental Campaign 11/10-4/11 •! Operational Readiness Review 6/20-24/11 •! Satellite Pre-Ship Review 8/2/11 •! Mission Readiness Review (L-75) 9/6/11 •! Flight Readiness Review (L-4) 10/21/11 •! Launch Readiness Review (L-1) 10/24/11 •! NPP ‘Official’ Launch Readiness Date is currently October 25, 2011 –! Initial NPP launch date was mid-2006 NASA Langley Research Center / Science Directorate!
- Page 1 and 2: CERES Instrument and Calibration St
- Page 3 and 4: Instrument Working Group Personnel
- Page 5 and 6: Instrument and ERBE-Like Processing
- Page 7 and 8: Why is CERES Climate Quality Calibr
- Page 9 and 10: Enabling Climate Data Record Contin
- Page 11 and 12: EOS Status NASA Langley Research Ce
- Page 13 and 14: Terra/Aqua Instrument and ERBE-Like
- Page 15 and 16: CERES Calibration Input Parameters
- Page 17: CERES Flight Project Organization N
- Page 21 and 22: CERES FM-5 on NPP TVAC Timeline 48
- Page 23 and 24: NPP Path to Launch - Ground System
- Page 25 and 26: Aqua/Terra and NPP Intercomparison
- Page 27 and 28: Aqua and NPP : Matched Sites 8 day-
- Page 29 and 30: Summary NPP Mission Video NASA Lang
- Page 31 and 32: CERES FM6 Status & Near-Term Activi
- Page 33 and 34: BACK-UP SLIDES NASA Langley Researc
- Page 35: ASIC 3 (2006) Workshop Recommendati
<strong>CERES</strong> Compatibility with NPP Spacecraft<br />
.108m<br />
ST1<br />
ST2<br />
3.720m<br />
4.026m<br />
.141m<br />
BCL<br />
RADIATOR<br />
VIIRS<br />
RADIATOR<br />
RF ACCESS<br />
DOOR<br />
SSW1<br />
ATMS<br />
RADIATOR<br />
VIIRS OM<br />
75°<br />
VIIRS EM<br />
ATMS<br />
PROPULSION MODULE<br />
SSW2<br />
+X<br />
(Velocity)<br />
OMPS<br />
+Z<br />
(Nadir)<br />
<strong>CERES</strong><br />
Observatory Information<br />
!! Launch Readiness October, 2011<br />
!! Location - Vandenberg AFB<br />
!! Launch Vehicle - Delta II<br />
!! Altitude - 824 Km<br />
-! <strong>CERES</strong> FOV increases to ~ 24Km<br />
!! Inclination - Sun-Synch, 98.7-deg<br />
!! Crossing Time - 1:30pm, Ascending<br />
!! Payload -<br />
-! <strong>CERES</strong><br />
-! VIIRS<br />
-! OMPS<br />
-! CRIS<br />
-! ATMS<br />
<strong>NASA</strong> Langley Research Center / Science Directorate!