Annex 6-D<br />

IFB SOLICITATION AND FILE CHECKLIST<br />

IFB SOLICITATION CHECKLIST FILE CHECKLIST<br />

For Construction Procurements:<br />

See 4.24 - The procurement of “construction” for “Capital Outlay Projects” is <strong>gov</strong>erned by the rules of the<br />

Construction and Professional Services Manual, issued by DGS/Division of Engineering and Buildings.<br />

Bonds: For construction contracts in excess of $500,000, a bid bond, performance and payment bonds are required.<br />

Drawings, As-Built: If “as-built drawings” are required, specify the number of copies, when, and to whom they are to<br />

be delivered.<br />

Drawings, Shop: If shop drawings are required, specify when and to whom they are to be submitted, approvals<br />

required, and time limits for review or changes, by both the agency and the contractor.<br />

Material/Supplies: If there is agency furnished material to be supplied to the contractor, the solicitation must provide<br />

for its control, and return, or disposition. If the contractor is to furnish material or supplies, the quantity, quality, and<br />

availability must be specified.<br />