Sr.<br />
No.<br />
Name of Lender<br />
Facility<br />
(in million)<br />
Total amount<br />
outstanding<br />
(including<br />
accrued interest)<br />
as on March 31,<br />
2011<br />
(in million)<br />
Rate of Interest<br />
as on March<br />
31, 2011<br />
(per annum)<br />
Repayment<br />
Schedule<br />
Security Created<br />
Sindhu, and Ms. Sushil<br />
Mrig, valid for a period of<br />
180 days from the<br />
commercial operation<br />
date;<br />
4. First charge on all of the<br />
project assets (including<br />
bank accounts and<br />
receivables); and<br />
5. First charge on all<br />
interests, rights, title of the<br />
Company in the project<br />
documents, regulatory<br />
clearances, performance<br />
guarantees or liquidated<br />
damages in relation to the<br />
project, the operating cash<br />
flows of the Company,<br />
bank accounts of the<br />
Company.<br />
5. YES Bank Limited ` 500.00 ` 505.44 YES Bank<br />
Limited PLR –<br />
5.70% i.e.<br />
12.80%<br />
In 16 equal<br />
quarterly<br />
instalments after<br />
one year<br />
moratorium with<br />
effect from two<br />
months from the<br />
date of first<br />
drawdown.<br />
1. Exclusive charge on all<br />
movable and immovable<br />
fixed assets of our coal<br />
washery at Himgir (both<br />
present and future);<br />
2. First charge over cash<br />
flows of the project being<br />
routed through the current<br />
account maintained with<br />
YES Bank Limited; and<br />
3. Personal guarantees of our<br />
Directors, Mr. Rudra Sen<br />
Sindhu, Mr. Ganesh<br />
Chandra Mrig and Mr.<br />
Kuldeep Singh Solanki.<br />
6. ICICI Bank Limited ` 1,750.00 ` 1,750.00 Base rate +<br />
3.40% (i.e.<br />
12.15% as on<br />
March 31, 2011)<br />
In 20 equal<br />
quarterly<br />
instalments after<br />
two year<br />
moratorium with<br />
effect from<br />
February, 2013.<br />
1. Exclusive charge by way<br />
of equitable mortgage over<br />
the land of (i) the 15 MW<br />
windmill power plant<br />
located at Sangli,<br />
Maharashtra; and (ii) coal<br />
washery plants located at<br />
Binjhri, Chakabura and<br />
Gevra;<br />
2. Pari passu charge by way<br />
of equitable mortgage over<br />
the land of 30 MW thermal<br />
power plant located at<br />
Chakabura; and<br />
3. Pari passu charge by way<br />
272