2. Power purchase agreement dated January 4, 2011 between Aryan Chhattisgarh Power Generation<br />

Company Limited, our Subsidiary (“ACPGCL”) and Chhattisgarh State Power Trading Company<br />

Limited (“CSPTCL”)<br />

ACPGCL has entered into a power purchase agreement dated January 4, 2011 with CSPTCL (“PPA”) for sale<br />

of power from the coal based power project with an installed capacity of 1,200 MW at Korba and Janjgir-<br />

Champa district, State of Chhattisgarh (“Champa Project”).<br />

As per the PPA, ACPGCL has undertaken to sell to CSPTCL the contracted power i.e. sum of 30% of the<br />

aggregate capacity of the Champa Project and 5% of the net power generated by the Champa Project on an<br />

annualized basis in accordance with the tariff structure laid down in the PPA. The obligations of ACPGCL<br />

include executing the Champa Project in a timely manner so as to enable each of the units and the power<br />

station to be commissioned not later than its scheduled commercial operation date and making available the<br />

contracted output and contracted capacity through the use of prudent utility practices to CSPTCL.<br />

The term of the PPA is for a period of twenty years from the date of commencement of supply of electricity by<br />

ACPGCL to CSPTCL, unless extended in accordance with the PPA. The PPA can be terminated upon the<br />

happening of events of default by either of the parties in accordance with the PPA.<br />