07.02.2015 Views

municipal corporation of jalandhar (mcj) water supply division ...

municipal corporation of jalandhar (mcj) water supply division ...

municipal corporation of jalandhar (mcj) water supply division ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Municipal Corporation <strong>of</strong> Jalandhar (MCJ)<br />

Employer at the opening. Any bid price or discount which is<br />

not read out and recorded at the opening <strong>of</strong> Price Proposals will<br />

not be taken into account in bid evaluation. The bidder's<br />

representatives who are present will be required to sign the<br />

record.<br />

31. Process to be<br />

Confidential<br />

32. Preliminary<br />

Examination <strong>of</strong> Price<br />

Proposals and<br />

Determination <strong>of</strong><br />

Responsiveness<br />

31.1 Information relating to the examination, clarification,<br />

evaluation and comparison <strong>of</strong> Price Proposals and<br />

recommendations for the award <strong>of</strong> a contract shall not be<br />

disclosed to bidders or any other persons not <strong>of</strong>ficially<br />

concerned with such process until the award <strong>of</strong> the successful<br />

bidder is announced. Any effort by a bidder to influence the<br />

Employer’s processing <strong>of</strong> bids or award decisions may result in<br />

rejection <strong>of</strong> the bidder’s bid.<br />

32.1 Prior to the detailed examination <strong>of</strong> the Price Proposals, the<br />

Employer will determine whether each opened bid (i) has been<br />

properly signed; and (ii) is substantially responsive to the<br />

requirements <strong>of</strong> the bidding documents.<br />

32.2 A substantially responsive bid is one which conforms to all<br />

terms, conditions and requirements <strong>of</strong> the bidding documents<br />

without material deviation or reservation and includes<br />

amendments and changes, if any, requested by the Employer<br />

during evaluation <strong>of</strong> bidder’s technical proposal. A material<br />

deviation or reservation is one (i) which affects in any<br />

substantial way the scope, quality or performance <strong>of</strong> the<br />

Works; (ii) which limits in any substantial way, inconsistent<br />

with the bidding documents, the Employer’s rights or the<br />

bidder’s obligations under the Contract; or (iii) whose<br />

rectification would affect unfairly the competitive position <strong>of</strong><br />

the other bidders presenting substantially responsive bids.<br />

32.3 If a Price Proposal is not substantially responsive it will be<br />

rejected by the Employer, and may not subsequently be made<br />

responsive by correction or withdrawal <strong>of</strong> the nonconforming<br />

deviation or reservation.<br />

33. Clarification <strong>of</strong> Price<br />

Proposals<br />

33.1 To assist in the examination, evaluation and comparison <strong>of</strong><br />

Price Proposals, the Employer may, at its discretion, ask any<br />

bidder for clarification <strong>of</strong> its bid, including breakdowns <strong>of</strong> unit<br />

rates. The request for clarification and the response shall be in<br />

writing or oral, but no change in the price or substance <strong>of</strong> the<br />

bid shall be sought, <strong>of</strong>fered or permitted except as required to<br />

confirm the correction <strong>of</strong> arithmetic errors discovered by the<br />

Employer in the evaluation <strong>of</strong> the bids in accordance with<br />

Clause 35.<br />

34. Correction <strong>of</strong> Errors 34.1 Price Proposals determined to be substantially responsive will<br />

be checked by the Employer for any arithmetic errors.<br />

Arithmetical errors will be rectified on the following basis. If<br />

there is a discrepancy between the unit rate and the total cost<br />

per item that is obtained by multiplying the unit rate and<br />

quantity, the unit rate shall prevail and the total cost per item<br />

will be corrected unless in the opinion <strong>of</strong> the Employer there is<br />

Section 1: Instructions to Bidders - 20 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!