III. if there is a discrepancy between words and figures, the amount in words shall prevail,<br />

unless the amount expressed in words is related to an arithmetic error, in which case the<br />

amount in figures shall prevail subject to (i) and (ii) above.<br />

b. For comparison of bids, only the price/bid for specified number of properties (200,000) shall be<br />

considered. No consideration of price offered for higher/lower number of properties as required<br />

under financial bid shall be made, at this stage.<br />

c. The Total Value of the Financial bid shall be arrived by the following method:<br />

Total Value = Fixed lump sum fees + any applicable taxes. If taxes have not been indicated<br />

separately in unambiguous terms, the proposal shall be considered all inclusive.<br />

d. The list of Bidder will be ranked in ascending order (i.e.) Bidder quoting the lowest price in terms<br />

of Total value (L1) will be ranked first and so on.<br />

e. The L1 bidder will be normally eligible for award of the contract. However, MCJ does not bind<br />

itself to award the contract to the bidder(s) offering the lowest price.<br />

f. However, if the two firms have quoted same for specified properties, prices quoted for additional<br />

properties, less number of properties and for vacant plots shall be considered in respective<br />

sequence and firm offering all inclusive lower bids for increased properties shall be considered<br />

the winner. Process shall continue to favor firms offering lower chargeable cost to MCJ. If all four<br />

quoted rates are same, firm with higher technical marks (up to two decimals) shall be<br />

considered.<br />

4.4 Review Meetings<br />

Consultant/ successful Bidder shall organize weekly/fortnightly review meetings with the<br />

commissioner to review functionality issues and progress of work. The frequency of<br />

meetings will be intimated by the consultant in consideration of requirements in the<br />

interest of the project. Consultant would prepare the minutes of the review meetings<br />

m e n t i o n i n g the issues discussed, decisions taken on them and appropriate level at which<br />

these require to be resolved.<br />

4.5 Negotiations with the Successful Bidder<br />

MCJ reserves the right to further negotiate with the Successful Bidder. While negotiating, the<br />

following aspects may be considered:<br />

1 Further reduction in consultancy charges for undertaking the Work – justifications for charges<br />

may be questioned and negotiated.<br />

2 Additional services and their prices (for higher/lower number of properties than specified,<br />

price of surveying and recording vacant plots etc.)<br />

3 Advancing the delivery schedule<br />

4 Phasing of the Payment Schedule based on actual work load<br />

5 The Consultant shall confirm the availability of all personnel as indicated in its Proposal.<br />

6 The Client will not consider substitutions during contract negotiations unless both parties agree<br />

that undue delay in the selection process makes such substitution unavoidable, or for reasons<br />

such as death or medical incapacity. Any proposed substitute shall have equivalent or better<br />

qualifications and experience than the original candidate and must be submitted to the Client<br />

within the period of time specified in the Letter of Invitation to negotiate. Failure to meet either of<br />

- 18 -