26 Chapter 2 Application <strong>Guide</strong>lines<br />
Table 4 describes the operating requirements <strong>for</strong> handling maintenance overrides when using<br />
<strong>Triconex</strong> communication capabilities.<br />
Table 4<br />
Operating Requirements <strong>for</strong> Maintenance Override Handling<br />
Operating Requirements<br />
Maintenance overrides are enabled <strong>for</strong> an entire<br />
controller or <strong>for</strong> a subsystem (process unit).<br />
Controller activates an override. The operator<br />
should confirm the override condition.<br />
Controller removes an override.<br />
DCS<br />
Operator,<br />
Maintenance<br />
Engineer<br />
Operator,<br />
Maintenance<br />
Engineer<br />
Operator,<br />
Maintenance<br />
Engineer<br />
Responsible Person<br />
TriStation 1131<br />
Software<br />
Maintenance<br />
Engineer, Type<br />
Approval<br />
Maintenance<br />
Engineer, Type<br />
Approval<br />
Maintenance<br />
Engineer<br />
Additional Recommendations<br />
These procedures are recommended in addition to the recommendations described in the tables<br />
on page 25 and page 26:<br />
• A DCS program should regularly verify that no discrepancies exist between the<br />
override command signals issued by a DCS and override-activated signals received by<br />
a DCS from a PES. This figure shows the procedure:<br />
<strong>Safety</strong>-Instrumented System<br />
Controller<br />
Sensors<br />
Safeguarding<br />
Application<br />
Program<br />
Actuators<br />
Hard-<br />
Wired<br />
Switch<br />
Maintenance<br />
Override Handling<br />
(Application Program)<br />
Operator<br />
Warning<br />
Distributed<br />
Control System<br />
Inputs<br />
Engineering<br />
Workstation<br />
Figure 6<br />
PES Block Diagram<br />
<strong>Safety</strong> <strong>Considerations</strong> <strong>Guide</strong> <strong>for</strong> <strong>Triconex</strong> <strong>General</strong> Purpose v2 Systems