REQUISITION & PROPOSAL ALABAMA STATE PORT AUTHORITY DATE 8/8/13 MCDUFFIE COAL TERMINAL DEPARTMENT ORIGINATING DEPT NO. 106 TO: Prospective Vendors Please procure the following and DELIVER TO: ALABAMA STATE PORT AUTHORITY McDUFFIE COAL TERMINAL RECEIVING WHSE 1760 YEEND LOOP MOBILE, AL 36602 NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE The Alabama State Port Authority requests pricing on the following or approved equal: Direct all technical inquiries to Scott McAfee 251-441-7510 or 251-422-1801 OR BO STRICKLAND 251-441-7511 or 251-463-6000 BID SPECIFICATION FOR NEW 914G2 OR EQUIVALENT WHEEL LOADER ASPA reserves the right to purchase additional Wheel Loaders for the next 12 months starting the day this bid is awarded if the vendor agrees to the same price. Bid Opening 8/8/13 @ 10am in the McDuffie Conference Room. LABEL BIDS: 914G2 OR EQUIVALENT 8/8/13 PURCHASE OF NEW 914G2 OR EQUIVALENT WHEEL LOADER Recommended: ______________________________________ Dillon Sims, Associate Buyer Approved: ____________________________________ Brad Ojard, Senior Vice President Operations ______________________________________ Scott McAfee, Equipment Superintendent ____________________________________ H. S. “Smitty” Thorne, Deputy Director / COO ______________________________________ Randy Gossett, Superintendent ____________________________________ Larry R. Downs, Sec. / Treasurer ______________________________________ Scott Wallace, Maintenance Manager _____________________________________ James K. Lyons, Director & CEO Page 1 of 19

REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY DATE 8/8/13<br />

MCDUFFIE COAL TERMINAL DEPARTMENT ORIGINATING DEPT NO. 106<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

The <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong> requests pricing on the following or approved equal:<br />

Direct all technical inquiries to Scott McAfee 251-441-7510 or 251-422-1801<br />

OR BO STRICKLAND 251-441-7511 or 251-463-6000<br />

BID SPECIFICATION FOR NEW 914G2 OR EQUIVALENT WHEEL<br />

LOADER<br />

ASPA reserves the right to purchase additional Wheel Loaders for the next 12<br />

months starting the day this bid is awarded if the vendor agrees to the same<br />

price.<br />

<strong>Bid</strong> Opening 8/8/13 @ 10am in the McDuffie Conference Room.<br />

LABEL BIDS: 914G2 OR EQUIVALENT 8/8/13<br />

PURCHASE OF NEW 914G2 OR EQUIVALENT WHEEL LOADER<br />

Recommended:<br />

______________________________________<br />

Dillon Sims, Associate Buyer<br />

Approved:<br />

____________________________________<br />

Brad Ojard, Senior Vice President Operations<br />

______________________________________<br />

Scott McAfee, Equipment Superintendent<br />

____________________________________<br />

H. S. “Smitty” Thorne, Deputy Director / COO<br />

______________________________________<br />

Randy Gossett, Superintendent<br />

____________________________________<br />

Larry R. Downs, Sec. / Treasurer<br />

______________________________________<br />

Scott Wallace, Maintenance Manager<br />

_____________________________________<br />

James K. Lyons, Director & CEO<br />

Page 1 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

Check YES or NO on each line for the following 9 Pages.<br />

BASIC SPECIFICATIONS<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Engine net power shall be at least 95 hp (71 kW) according to SAE<br />

J1349.<br />

Engine gross power shall be at least 101 hp (75 kW) according to SAE<br />

J1995.<br />

Machine operating weight shall be no less than 17,530 lb (7950 kg).<br />

Machine height shall be no more than 10'2" (3100 mm).<br />

Machine overall height with standard general purpose bucket raised<br />

shall be at least 14'5" (4390 mm).<br />

Machine overall length with standard general purpose bucket shall be<br />

20'5" (6229 mm).<br />

Machine width over tires shall be 7'4" (2260 mm).<br />

Machine wheelbase shall be 8'5" (2600 mm).<br />

Rated bucket capacity shall be 1.7 cubic yards (1.3 cubic meters).<br />

Reach at full lift at 45° dump angle shall be 3'2" (973 mm).<br />

Dump clearance at maximum lift and 45° dump angle shall be at least<br />

8'9" (2659 mm).<br />

Bucket clearance at maximum lift and carry shall be at least 3'2" (973<br />

mm).<br />

Page 2 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

ENGINE<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Engine shall be EPA Tier 3 compliant.<br />

Engine shall be 4.4 L four-cylinder, water cooled and have direct injection.<br />

Engine bore shall be at least 4.13" (105 mm) and stroke shall be at least 5" (127<br />

mm).<br />

Engine shall have a direct injection rotary fuel pump with individual adjustmentfree<br />

injection valves.<br />

Engine shall have field replaceable dry cylinder liners.<br />

Oil seals shall be standard for both intake and exhaust valves.<br />

Cylinder heads shall have replaceable valve guides and seats for ease of rebuild.<br />

Direct electric 24 volt starting and charging system shall be standard with two 12<br />

volt 900 CCA maintenance free batteries and 80 amp alternator for the cab and<br />

canopy.<br />

A large diameter, hardened chrome-molybdenum steel crankshaft shall be<br />

standard.<br />

Three-ring controlled-expansion pistons lubricated by oil from the oil cooling jets<br />

shall be standard.<br />

Machine shall have a helical steel front gear train to ensure precise fuel pump<br />

timing for optimum economy and performance.<br />

Fuel priming pump and fuel/water separator shall be standard.<br />

Machine shall have gear driven water pump and a gear driven oil pump located in<br />

the oil pan.<br />

Starting aid for improved starting in extremely cold temperatures shall be<br />

standard.<br />

Wiring harnesses shall be wrapped with abrasive resistant braided nylon material<br />

to prevent accidental damage and short circuits within the system.<br />

Wiring harnesses shall be securely fastened throughout the machine.<br />

Deutsch (DT) connectors shall be used to improve wire harness reliability by<br />

locking out dust and moisture.<br />

Individual wires in the wiring harness shall be color-coded and numbered every<br />

2" (50 mm) for easier diagnosis and servicing.<br />

Page 3 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

POWERTRAIN/TRANSMISSION<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

The hydrostatic power train shall provide dependable and smooth operation with<br />

a single lever control for easy and precise control of direction changes.<br />

An inching function shall be available to allow momentary travel speed as low as<br />

zero with full engine rpm.<br />

A creeper control that allows variable function of travel speeds with full engine<br />

rpm shall be available.<br />

A remote transmission control that adds a forward/neutral/reverse switch on the<br />

implement lever and directional indicators on the instrument cluster shall be<br />

available.<br />

A rabbit/turtle (High/Low) switch shall be provided and full rimpull shall be<br />

available in either mode.<br />

Machine shall have two forward and two reverse speeds with a maximum of 22<br />

mph (35 kph).<br />

Machine shall have closed-loop hydrostatic system for high performance.<br />

Machine shall have single-path, variable displacement pump (axial piston type)<br />

and two variable displacement motors (bent axis type) driving fixed ratio gear<br />

box on rear axle.<br />

Machine shall be capable of full power directional changes.<br />

STEERING<br />

Y____ N____ Steering articulation angle shall be at least 40° per side.<br />

Y____ N____ Steering angle in each direction shall be at least 40°.<br />

Y____ N____ Machine shall have two steering cylinders with a bore of 2.5 in (63.5 mm).<br />

A fully hydraulic power steering system shall feature center-point frame<br />

Y____ N____ articulation, front/rear wheel track and dedicated fixed displacement steering<br />

pump to provide flow at all engine and ground speeds.<br />

Y____ N____<br />

Hydraulic output at 2200 rpm and 1,000 psi (6900 kPa) shall be at least<br />

15.1gal/min (57 L/min).<br />

Y____ N____ High impact rubber steering stops shall be standard.<br />

Y____ N____ Adjustable steering system shall be available for operator comfort.<br />

Y____ N____ Secondary steering system shall be available.<br />

Dual suspended brake pedals shall function as a brake and transmission<br />

Y____ N____ neutralizer so the operator can maintain high engine rpm for full hydraulic flow<br />

and fast cycle times.<br />

Page 4 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

BRAKES<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

Y____ N____<br />

Service brake shall feature completely closed and sealed standard inboard oilimmersed<br />

disc brakes on front and rear axles that are adjustment free.<br />

Y____ N____ Dual pedal low-effort hydraulic braking system shall be standard.<br />

Y____ N____ Hydrostatic drive shall be variably neutralized during braking.<br />

Y____ N____ Hydrostatic system shall provide additional hydraulic braking capacity.<br />

Y____ N____<br />

Brake pedals shall be suspended for easy cleaning of the floor and keeping<br />

debris from impeding pedal linkage.<br />

Parking brake shall be mechanical, shoe-type mounted on driveline for positive<br />

Y____ N____ manual operation. The transmission shall be automatically neutralized when<br />

parking brake is applied.<br />

Y____ N____ Parking brake slope holding ability shall be 30°.<br />

HYDRAULIC SYSTEM<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Machine shall have an open centered hydraulic system with low effort pilot<br />

operated controls.<br />

Hydraulic output at 2200 engine rpm and 1,000 psi (6900 kPa) with SAE 10W oil at<br />

150 ° F (65 ° C ) shall be 23.8 gal/min (90 L/min).<br />

Hydraulic lift up cycle time shall be 5.3 seconds at high idle.<br />

Fixed displacement implement, gear-type pump shall be mechanically and directly<br />

connected to engine output.<br />

Relief valve setting shall be 3,560 psi (241.5 bar).<br />

Double acting, threaded gland lift cylinders shall have bore and stroke of at least<br />

3.5 X 26.5 in (89 X 672 mm).<br />

Double acting, threaded gland tilt cylinder shall have a bore and stroke of at least<br />

4.0 X 15.8 in (102 X 400 mm).<br />

Machine shall feature pilot safety valve to disable implement functions and<br />

standard hydraulic oil cooler that tilts out for easy cleaning of heat exchangers<br />

and full flow filtering.<br />

A Ride Control system shall be available for smooth operation in rough roading<br />

conditions.<br />

Page 5 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

AXLES<br />

Y____ N____ Front axle shall be rigidly mounted to the front loader frame.<br />

Y____ N____<br />

Rear axle shall have an oscillation trunnion to allow the rear wheel to raise<br />

or drop a total of 13.8 in (350 mm)<br />

Y____ N____ The rear axle shall oscillate +/-11 ° .<br />

Y____ N____<br />

Rear axle shall have a remote trunnion lubrication fitting to simplify<br />

maintenance.<br />

Y____ N____ Limited Slip Differentials shall be available on front, rear or both axles.<br />

Y____ N____<br />

Seals on the axle and housing shall keep oil in and lock contaminants out<br />

to prevent contamination of internal components.<br />

Y____ N____ Axle shall have fully-enclosed brakes and final drives.<br />

Planetary final drives shall consist of ring gears pressed and doweled into<br />

Y____ N____ axle housing and planetary carried assemblies including planet gears with<br />

full floating bronze sleeve bearings.<br />

Y____ N____<br />

Planetary reduction gears shall be inboard mounted for optimal protection<br />

and durability.<br />

Y____ N____<br />

Final drives shall have high contact ratio gearset for low noise levels<br />

during meshing.<br />

Y____ N____<br />

Planetary reduction gears shall be inboard mounted for optimal protection<br />

and durability<br />

WHEELS<br />

Y____ N____ Standard tire size shall be 17.5-25<br />

Page 6 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

OPERATOR'S STATION<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

Tilt steering console shall allow the operator the easily adjust the steering wheel<br />

to maximize comfort and optimize visibility.<br />

Personal storage areas shall include places to store a lunch box, thermos, cup,<br />

coat rack and a lockable storage area.<br />

A remote transmission control option shall add a forward/neutral/reverse control<br />

switch on the implement lever for easier operation and enhanced productivity.<br />

Hydrostatic, closed-center steering with flow amplification shall provide fast or<br />

slow steering response, depending on the operational requirement.<br />

The standard control package shall include a two-function wobble stick for lift<br />

and tilt control.<br />

Electric detents shall be standard for the lift functions for raise and float, and for<br />

tilt functions for rackback/return to dig.<br />

An Engine Speed Control feature shall be available to engine RPM can be set and<br />

maintained with a switch in the cab.<br />

A creeper control shall be available to allow variable function of travel speeds<br />

while maintaining full engine RPM.<br />

A comfort seat shall be available with ergonomically shaped seat cushions to<br />

reduce pressure on the lower back and thighs and allow unrestricted arm and leg<br />

movement. Arm rest angle adjustment shall also be available.<br />

Heated and air-suspension seats shall also be available.<br />

Seat shall include a 3" (75 mm) wide retractable seat belt with an anti-cinch<br />

feature.<br />

Wide lift arm spacing and linkage geometry shall maximize visibility throughout<br />

the production cycle.<br />

Bonded, tinted glass with silicon joints and few obstructions shall eliminate pillar<br />

obstructions and allow expansive peripheral visibility.<br />

Front and rear wipers with washers shall be standard. Both front and rear wipers<br />

shall have washers with separate pumps and a common fluid reservoir. Front<br />

wiper shall be intermittent.<br />

A two door cab design shall allow easy access/egress. Both doors shall open<br />

fully and lock flush against the cab.<br />

Steps leading up to the cab shall be wide and angled out for secure footing.<br />

A 12V converter for powering electronics, a radio installation package, sun visor<br />

for windshield, roll-down sun screen for rear window, external mirror package<br />

and auxiliary lighting packages shall be available.<br />

Machine cab shall meet ROPS and FOPS criteria as well as regulations for sound<br />

exposure.<br />

Page 7 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

LOADER LINKAGE<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Work tools shall be quickly changed with an available integral quick<br />

coupler system.<br />

Breakout force shall be at least 14,007 lb (62kN).<br />

Full turn static tipping load shall be at least 11,737 lb (5323 kg).<br />

Reach at full lift and 45° dump angle shall be 3'2" (973 mm).<br />

Dump clearance at full lift and 45° dump angle shall be 8'7" (2659 mm).<br />

WORK TOOL OPTIONS<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Machine shall have optional 3rd and 4th function hydraulics available for<br />

use with work tools that require hydraulic power.<br />

Bucket lift circuit shall have four positions: raise, hold, lower and float.<br />

Controls shall be adjustable from automatic kickout horizontal to full lift.<br />

Tilt circuit shall have three positions: tilt back, hold and dump.<br />

An automatic bucket positioner shall be available that can be adjusted to<br />

desired loading angle and does not require visual spotting.<br />

Third and fourth function hydraulic circuits shall be available with<br />

individual lever controls that can be locked for roading.<br />

Machine shall have coupler to accept bucket and forks<br />

1.7CYD Bucket and 48' tine forks shall be included<br />

Page 8 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

SERVICEABILITY<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

Machine shall have a one-piece engine enclosure hood with gas struts to access<br />

to filters and service points.<br />

Radiator and oil coolers shall be easily accessible for cleaning from ground<br />

level.<br />

Machine shall have a hydraulic oil sight gauge visible from ground level and<br />

vented hydraulic system.<br />

Hood shall be manufactured with Dicyclopentadine (DCPD) which provides and<br />

excellent combination of impact resistance and durability.<br />

The engine enclosure shall have a curved design to provide excellent visibility.<br />

Engine enclosure shall be impact resistant, rustproof, have a lockable latch and<br />

pneumatically-assisted struts.<br />

All service points shall be accessible from ground level.<br />

Radiator coolant and hydraulic oil levels shall have sight gauges visible from<br />

ground level.<br />

A swing-out oil cooler shall allow quick, easy cleaning and service to the<br />

radiator.<br />

Spin on filters for engine oil and hydraulic oil shall be vertically mounted for<br />

easier servicing.<br />

Scheduled oil sampling ports shall be factory installed for improved access to<br />

engine, transmission and hydraulic oils.<br />

Machine shall have a maintenance free driveshaft.<br />

A stationary radiator and coolant hoses shall be standard.<br />

Adjustment free brakes shall be standard.<br />

Machine shall have grouped grease fittings.<br />

Machine shall have positive torque hose clamps.<br />

MINIMUM SERVICE FILL CAPACITIES<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Engine crankcase will have a minimum of 1.6 gal (6 L) capacity.<br />

Fuel tank shall have a minimum of 39.6 gal (150 L) capacity.<br />

Cooling system shall have a minimum of 6.1 gal (23 L) capacity.<br />

Front and rear crankcase shall each have a minimum of 4 gal (15 L) capacity.<br />

Hydraulic system, including tank shall have a 26.4 gal (100 L) capacity.<br />

Hydraulic tank shall have a 18.5 gal (70 L) capacity.<br />

Transfer gearbox shall have a 0.7 gal (2.5 L) capacity for the standard speed<br />

version and a 1.1 gal (4 L) capacity for the high speed version.<br />

Page 9 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

OWNING AND OPERATING COSTS<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Y____ N____<br />

Machine shall have a recommended oil change interval of 500 hours.<br />

Extended Life Coolant/Antifreeze shall allow for up to 6,000 hours between<br />

changes.<br />

With required oil sampling, hydraulic oil shall have a 4,000 hour change<br />

interval.<br />

Machine shall have a recommended 1,000 hour hydraulic filter change.<br />

A security system shall be available to inhibit unauthorized machine use<br />

by immobilizing vital electrical circuits unless a valid key is used to start<br />

the machine.<br />

NEW 914G2 OR EQUIVALENT WHEEL LOADER<br />

MAKE MODEL YEAR Price<br />

Do your service technicians already have<br />

ASPA credentials<br />

DELIVERY TIME ARO ____________ WEEKS<br />

$<br />

YES<br />

NO<br />

Your Price Shall Include Free Delivery<br />

Page 10 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective <strong>Bid</strong>ders<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

<strong>Bid</strong> opening will be August 8, 2013 at 10:00 a.m. in the McDuffie Island Conference<br />

Room. NO BIDS WILL BE ACCEPTED AFTER THIS TIME.<br />

PLEASE SEE ATTACHED INDEMNIFICATION SHEET & DISCLOSURE STATEMENT<br />

________________________________________________<br />

Company<br />

______________________________<br />

Address<br />

_______________________________<br />

Representative<br />

_______________________________<br />

Phone Number<br />

_______________________________________________<br />

Email<br />

FOR ALL PROPOSALS $7,500 AND OVER<br />

STATE OF _______________________)<br />

COUNTY OF _____________________)<br />

On this ___ day of , 20___, before me appeared _________________________, to me<br />

personally known, who, being by me duly sworn, did say that such person executed the foregoing<br />

instrument as the free act and deed of such person, having been duly authorized to execute such<br />

instrument in such capacity.<br />

IN WITNESS WHEREOF, I have hereunto set my hand and official seal.<br />

_______________________________<br />

Notary Public, <strong>State</strong> of _____________<br />

_______________________________<br />

Print Name<br />

My commission expires: ____________<br />

Page 11 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

<strong>Alabama</strong> <strong>State</strong> Docks/<strong>Port</strong> <strong>Authority</strong><br />

<strong>Bid</strong> Description:<br />

Purchase Wheel Loader for Bulk Plant<br />

<strong>Bid</strong>s to be Open: August 8, 2013<br />

The following paragraph shall be considered a part of the above referenced bid:<br />

Indemnification Clause<br />

The Contractor shall assume all liability for and shall indemnify and save harmless the <strong>State</strong> of<br />

<strong>Alabama</strong> and the <strong>Alabama</strong> <strong>State</strong> Docks/<strong>Port</strong> <strong>Authority</strong> and its officers and employees from all<br />

damages and liability for injury to any person or persons, and injury to or destruction of property,<br />

including the loss of use thereof, by reason of an accident or occurrence arising from operations under<br />

the contract, whether such operations are performed by himself or by any subcontractor or by anyone<br />

directly or indirectly employed by either of them occurring on or about the premises, or the ways and<br />

means adjacent during the term of the contract, or any extension thereof, and shall also assume the<br />

liability for injury and/or damages to adjacent or neighboring property by reason of work done under<br />

the contract.<br />

Page 12 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

Please use this as a guide only for proper delivery.<br />

Sender Name & Address<br />

<strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong><br />

McDuffie Coal Terminal<br />

Postal Address for US Mail<br />

Physical Address for Courier Service<br />

Sealed Proposal: (Description)<br />

Proposal Opening Date:<br />

Page 13 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

Please return one copy of this proposal, duly signed, by 10 a.m. August 8, 2013.<br />

When all proposals are publicly opened, UNIT PRICES AND EXTENSIONS shall be entered<br />

opposite each item above on which you are prepared to bid for delivery FREE OF CHARGE TO -<br />

McDuffie Coal Terminal (FOB) ALABAMA STATE DOCKS<br />

No consideration will be given proposals unless on this form or a written attachment.<br />

If not prepared to submit a proposal, please state over the firm signature and return so that it may<br />

be known it was brought to your attention; otherwise your name may be dropped form the list of<br />

prospective vendors.<br />

The right is reserved to reject any an all proposals deemed for the interest of the <strong>Alabama</strong> <strong>State</strong><br />

<strong>Port</strong> <strong>Authority</strong>, to strike out any item or items in the proposals, and to waive any defect or<br />

irregularly not a violation of law or to make any modification in the several conditions herein<br />

stipulated that are deemed to be in the best interest of the <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong>, including<br />

the separation of items of a class in making awards. In general, awards will be made to the lowest<br />

satisfactory vendor.<br />

No Allowance will be made for errors, either of omission or commission, on the part of the vendors.<br />

It must be assumed that vendors have fully informed themselves as to all conditions,<br />

requirements, and specifications before submitting proposals and they can not expect to be<br />

excused or relieved from the responsibility assumed by their proposals on the plea of error. In case<br />

of error in extension of prices the unit price will govern.<br />

The <strong>Port</strong> <strong>Authority</strong> reserves the right to refuse to issue a proposal form or a contract to a<br />

prospective vendor for any of the following reasons:<br />

a) Failure to pay, or satisfactorily settle, all bills due for labor and materials on a former contract<br />

in force with the <strong>Port</strong> <strong>Authority</strong>.<br />

b) Contractor default under a previous Contract with the <strong>Port</strong> <strong>Authority</strong>.<br />

c) Proposal withdrawal or <strong>Bid</strong> Bond forfeiture on a previous project with the <strong>Port</strong> <strong>Authority</strong>.<br />

d) Unsatisfactory work on a previous contract with the <strong>Port</strong> <strong>Authority</strong>.<br />

<strong>Port</strong> <strong>Authority</strong> may make such investigations as deemed necessary to determine the ability of the<br />

vendor to perform the work, and the vendor shall furnish all such information and data for this<br />

purpose as the <strong>Port</strong> <strong>Authority</strong> may request. The <strong>Port</strong> <strong>Authority</strong> reserves the right to reject any<br />

proposal if the evidence submitted by, or investigation of, such vendor fails to satisfy the <strong>Port</strong><br />

<strong>Authority</strong> that such vendor is properly qualified to carry out the obligations of the Contract.<br />

Page 14 of 19


FORM FOR SECTIONS 9(a) and (b) BEASON-HAMMON ALABAMA TAXPAYER AND CITIZEN<br />

PROTECTION ACT; CODE OF ALABAMA, SECTIONS 31-13-9 (a) and (b)<br />

AFFIDAVIT FOR BUSINESS ENTITY/EMPLOYER/CONTRACTOR<br />

(To be completed as a condition for the award of any contract, grant, or incentive by the <strong>State</strong> of<br />

<strong>Alabama</strong>, and political subdivision thereof, or any state-funded entity to a business entity or employer<br />

that employs one or more employees)<br />

<strong>State</strong> of _________________________<br />

County of _______________________<br />

Before me, a notary public, personally appeared ___________________ (print name) who, being<br />

duly sworn, says as follows:<br />

As a condition for the award of any contract, grant, or incentive by the <strong>State</strong> of <strong>Alabama</strong>, any political<br />

subdivision thereof, or any state-funded entity to a business entity or employer that employs one or<br />

more employees, I hereby attest that in my capacity as __________________________ (state<br />

position) for _____________________________(state business entity/employer/contractor name)<br />

That said business entity/employer/contractor shall not knowingly employ, hire for employment, or<br />

continue to employ an unauthorized alien.<br />

I further attest that said business entity/employer/contractor is enrolled in the E-Verify program.<br />

(ATTACH DOCUMENTATION ESTABLISHING THAT BUSINESS<br />

ENTITY/EMPLOYER/CONTRACTOR IS ENROLLED IN THE E-VERIFY PROGRAM)<br />

______________________________ Signature of Affiant<br />

Sworn to and subscribed before me this _____ day of __________________, 2____.<br />

I certify that the affiant is known (or made known) to me to be the identical party he or she claims to<br />

be.<br />

___________________________ Signature and Seal of Notary Public<br />

Author: Jean Brown<br />

Statutory <strong>Authority</strong>: Code of <strong>Alabama</strong>, sections 31-13-9 (a) and (b); Section 31-13-9 (h).<br />

Page 15 of 19


REQUISITION & PROPOSAL<br />

ALABAMA STATE PORT AUTHORITY<br />

MCDUFFIE COAL TERMINAL DEPARTMENT<br />

TO: Prospective Vendors<br />

Please procure the following and DELIVER TO:<br />

DATE:<br />

ORIGINATING DEPT NO.<br />

ALABAMA STATE PORT AUTHORITY<br />

McDUFFIE COAL TERMINAL RECEIVING WHSE<br />

1760 YEEND LOOP<br />

MOBILE, AL 36602<br />

NAMES OF ARTICLES, SPECIFICATIONS AND PURPOSE<br />

All construction vehicles, employees, and supplier delivery trucks working on this project will be<br />

required to obtain port access credentials. This will consist of vehicle decals and personnel<br />

identification badges (Transportation Worker Identification Credentials and ASPA Identification<br />

Badge). Supplier delivery trucks are not required to have the vehicle decal but the driver and<br />

passengers are required to have TWIC and the ASPA Identification Badge.<br />

The vehicle decal cost is $25.00. In order to obtain the ASPA Identification Badge, the person<br />

must have in possession a TWIC card and will also be required to attend a 1-hour security<br />

awareness training class. The non-refundable fee for ASPA Identification badge is $25.00 to cover<br />

the costs of the background check, training, and processing. The procedure and cost for obtaining<br />

TWIC are separate and information can be obtained at www.tsa.gov/twic.<br />

A copy of the ASPA Access Policy is herein and is part of contract specifications.<br />

ALABAMA STATE PORT AUTHORITY ACCESS POLICY<br />

IMPORTANT NOTICE TO VENDORS REGARDING ACCESS TO ASPA RESTRICTED<br />

FACILITIES:<br />

Successful vendors requiring access to the <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong>'s Restricted Facilities to<br />

fulfill any obligations set forth in this proposal must comply fully with the <strong>Authority</strong>'s Access Policy<br />

found in its entirety at http://www.asdd.com/portaccess_policy.html The <strong>Port</strong> <strong>Authority</strong>'s Access<br />

Policy requires all persons permanently employed at the port, including ASPA staff, tenants and<br />

their employees, surveyors, agents, stevedores, longshoremen, chaplains, contract labor and<br />

persons requesting temporary access to the port, including delivery persons, vendors, contractors,<br />

and temporary workers must obtain and display an ASPA issued photo ID badge or visitor badge<br />

at all times when accessing or working on port property. In order to obtain an ASPA credential,<br />

applicants must also obtain a Transportation Worker Identification Credential (TWIC) and undergo<br />

mandatory Security Awareness Training. Information on the TWIC can be found at<br />

http://www.asdd.com/portaccess_twicregs.html<br />

Information on Security Awareness Training classes and scheduling can be found at<br />

http://www.asdd.com/portaccess_securitytraining.html<br />

ALL PROSPECTIVE VENDORS ARE ENCOURAGED TO REVIEW THESE POLICIES<br />

AND CONSIDER THESE REQUIREMENTS IN PREPARING PROPOSAL<br />

SUBMISSIONS.<br />

Page 16 of 19


INSTRUCTIONS FOR VENDORS<br />

ALABAMA STATE PORT AUTHORITY<br />

This instruction sheet is provided as a guide to facilitate the proposal process and highlight important points for<br />

consideration by vendors. Each vendor is responsible for fully reading and complying with the instructions on the <strong>Alabama</strong><br />

<strong>State</strong> <strong>Port</strong> <strong>Authority</strong> proposal form. This instruction sheet is to be used as a guide only.<br />

1. No consideration will be given to proposals unless presented on the <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong> "<strong>Requisition</strong> &<br />

Proposal" Form with suitable attachments as deemed necessary by the vendor. Alternate proposals may be<br />

rendered, with proper support.<br />

2. If your company is not prepared to submit a proposal, so state and sign to avoid being deleted from the prospective<br />

vendor's list.<br />

3. The <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong> reserves the right to reject any and all proposals if deemed in the <strong>Alabama</strong> <strong>State</strong><br />

<strong>Port</strong> Authorities' interest.<br />

4. No allowance will be made for error, either omission or commission.<br />

5. Unit price governs in errors relating to extension of prices.<br />

6. Proposals will not be accepted via FAX. All proposals must be sealed and sent via mail or hand delivered to the<br />

McDuffie Coal Terminal Office before the specified date and time.<br />

7. The <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong> accepts no responsibility for facilitating the receipt of proposals.<br />

8. Proposals over $7,500 must be notarized.<br />

9. Proposals received after specified opening time will be returned to the vendor unopened. Vendors are requested to<br />

show a return address on the proposal envelope.<br />

10. Proposals must be filled out completely, including the name, address, telephone number, fax number (if possible)<br />

and signature of responsible person.<br />

11. Questions may be directed to the <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong> McDuffie Coal Terminal,<br />

Dillon Sims, at (251) 441-7676.<br />

12. All hand delivered proposals must be tendered to <strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong>, McDuffie Coal Terminal Office<br />

1901 Ezra Trice Blvd., Mobile AL 36603, at or before specified time.<br />

13. All regular U.S. Postal Mail must be tendered to:<br />

<strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong><br />

ATTN: Dillon Sims<br />

McDuffie Coal Terminal<br />

P.O. Box 1588 Mobile, AL 36633-1588<br />

14. All courier / overnight deliveries (UPS, FEDEX, DHL, etc.) must be delivered to:<br />

<strong>Alabama</strong> <strong>State</strong> <strong>Port</strong> <strong>Authority</strong><br />

McDuffie Coal Terminal<br />

ATTN: Dillon Sims<br />

1901 Ezra Trice Blvd.<br />

Mobile, AL 36603<br />

15. Note: all overnight proposals must be FIRST PRIORTY OVERNIGHT. (8:30 A.M. NEXT MORNING)<br />

16. Notarization not required on "SALE" proposals.<br />

17. Please specify the purchase order number (when available) on envelope.<br />

Page 17 of 19


Page 18 of 19


THIS PAGE MUST BE NOTARIZED<br />

Page 19 of 19