IRPMU<br />

INDIAN RAILWAYS PROJECT MANAGEMENT UNIT<br />

Local office: Office of Deputy Chief Signal & Telecommunication Eng<strong>in</strong>eer,<br />

Old Microwave Build<strong>in</strong>g, Juhi, Kanpur.<br />

Head Office: Chief Adm<strong>in</strong>istrative Officer, Shivaji Bridge (IRCOT Complex),<br />

Beh<strong>in</strong>d Shankar Market, New Delhi – 110 001<br />

<strong>TENDER</strong> <strong>DOCUMENT</strong><br />

<strong>for</strong><br />

Indoor and Outdoor signall<strong>in</strong>g works consist<strong>in</strong>g of trench<strong>in</strong>g, cable lay<strong>in</strong>g,<br />

term<strong>in</strong>ation of cables, cast<strong>in</strong>g of foundations, erection of signals & locations,<br />

relay and power supply wir<strong>in</strong>g, track circuit<strong>in</strong>g work, po<strong>in</strong>t mach<strong>in</strong>e work<br />

etc., and their test<strong>in</strong>g & commission<strong>in</strong>g <strong>in</strong> connection of ‘Provision of EI<br />

based automatic signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bi-directional signall<strong>in</strong>g on<br />

exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong> Panki-Bhaupur section and at<br />

Panki & Bhaupur stations on Kanpur-Etawah section of Allahabad division<br />

of North Central Railway’.<br />

Tender No. IRPMU/S&T/CNB/PNK-BPU 3 rd l<strong>in</strong>e/08-09/Outdoor/04<br />

Copy No. ………<br />

Sold to M/s ………………<br />

Price Rs. 5000/-<br />

By Post Rs. 5500/<br />

Signature of contractor Page 1 of 127 Dy CSTE/IRPMU/Kanpur


T O P S H E E T<br />

1) Tender Notice No: IRPMU/S&T/CNB/PNK-BPU 3 rd l<strong>in</strong>e/08-09/Outdoor/04<br />

2) Name of Work: Indoor and Outdoor signall<strong>in</strong>g works consist<strong>in</strong>g of trench<strong>in</strong>g, cable<br />

lay<strong>in</strong>g, term<strong>in</strong>ation of cables, cast<strong>in</strong>g of foundations, erection of signals & locations,<br />

relay and power supply wir<strong>in</strong>g, track circuit<strong>in</strong>g work, po<strong>in</strong>t mach<strong>in</strong>e work etc., and their<br />

test<strong>in</strong>g & commission<strong>in</strong>g <strong>in</strong> connection of ‘Provision of EI based automatic signall<strong>in</strong>g on<br />

new 3rd l<strong>in</strong>e and bi-directional signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong><br />

Panki-Bhaupur section and at Panki & Bhaupur stations on Kanpur-Etawah section of<br />

Allahabad division of North Central Railway’.<br />

3) Approximate Cost : Rs. 1.63 crores only<br />

4) Completion period : Six months.<br />

5. Earnest Money : Rs. 2,31,500/-<br />

6. Date of open<strong>in</strong>g : 23 rd December 2008 at 16.00 Hrs. <strong>in</strong> office<br />

7. Cost of Tender document : Rs. 5000/- (Rs. 5500/- if reqd. by post).<br />

8. Sold to : M/s:____________________________________<br />

9. Details of deposit of cost of :<br />

Tender document<br />

M.R./BD No. ……………………Dt………………<br />

: Rs. ………………………………………………….<br />

Issued by<br />

Signatures of Issu<strong>in</strong>g official<br />

Signatures of Contractor<br />

Signature of contractor Page 2 of 127 Dy CSTE/IRPMU/Kanpur


INDEX<br />

SECTION CHAPTER SUBJECT<br />

I 1 Tender Notice<br />

2 Preamble<br />

3 Schedule of Requirement of Quantities<br />

II 1 Instructions to tenderer &<br />

Conditions of tender<strong>in</strong>g<br />

2 Special conditions of contract<br />

3 Tender Forms<br />

III 1 Technical Specification and Installation<br />

Practices<br />

Signature of contractor Page 3 of 127 Dy CSTE/IRPMU/Kanpur


Section – I<br />

Chapter – 1<br />

Tender Notice<br />

Signature of contractor Page 4 of 127 Dy CSTE/IRPMU/Kanpur


SHORT TERM <strong>TENDER</strong> NOTICE<br />

Deputy Chief Signal & Telecommunication Eng<strong>in</strong>eer/IRPMU, Old Microwave build<strong>in</strong>g,<br />

NC Railway, Kanpur, <strong>for</strong> and on behalf of President of India, <strong>in</strong>vites sealed ‘OPEN<br />

<strong>TENDER</strong>’ from the established, reliable and experienced contractors hav<strong>in</strong>g sufficient<br />

proven experience <strong>in</strong> railway signall<strong>in</strong>g works on the prescribed <strong>for</strong>m <strong>for</strong> the under noted<br />

work.<br />

Tender No. Name of Work Indoor and Outdoor signall<strong>in</strong>g works consist<strong>in</strong>g of<br />

trench<strong>in</strong>g, cable lay<strong>in</strong>g, term<strong>in</strong>ation of cables, cast<strong>in</strong>g<br />

of foundations, erection of signals & locations, relay<br />

and power supply wir<strong>in</strong>g, track circuit<strong>in</strong>g work, po<strong>in</strong>t<br />

mach<strong>in</strong>e work etc., and their test<strong>in</strong>g & commission<strong>in</strong>g<br />

<strong>in</strong> connection of ‘Provision of EI based automatic<br />

signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bi-directional<br />

signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e<br />

<strong>in</strong> Panki-Bhaupur section and at Panki & Bhaupur<br />

stations on Kanpur-Etawah section of Allahabad<br />

division of North Central Railway’.<br />

IRPMU/S&T/<br />

CNB/PNK-<br />

BPU 3 rd<br />

l<strong>in</strong>e/Outdoor/<br />

08-09/04<br />

Approximate Cost<br />

Earnest Money<br />

Rs. 1.63 crores (Rs. One Crore Sixty Three Lakhs)<br />

only<br />

Rs. 2,31,500/- (Rs. Two Lakhs Thirty one Thousand<br />

five Hundred only).<br />

Completion Period<br />

Last Date and Time of<br />

submission and<br />

open<strong>in</strong>g of Tender<br />

Validity of Offer<br />

Date From Which<br />

Tender Documents will<br />

be Available <strong>for</strong> Sale.<br />

06 (Six months) from issue of letter of acceptance.<br />

23 rd Dec. 2008 up to 15.00 Hrs and will be opened at<br />

16.00 Hrs on the same Day <strong>in</strong> office of Chief<br />

Adm<strong>in</strong>istrative Officer, Shivaji Bridge (IRCOT<br />

Complex), Beh<strong>in</strong>d Shanker Market, New Delhi.<br />

120 Days.<br />

4 th Dec 2008 to 22 nd Dec 2008 from 10.30 Hrs. to<br />

16.00 Hrs. on every work<strong>in</strong>g day <strong>in</strong> the office of Dy<br />

CSTE/IRPMU, Old Microwave Build<strong>in</strong>g, N C<br />

Railway, Juhi, Kanpur.<br />

Tenders without earnest money will be summarily rejected.<br />

Signature of contractor Page 5 of 127 Dy CSTE/IRPMU/Kanpur


Further particulars and tender <strong>for</strong>m can be received from the office of Dy CSTE/IRPMU,<br />

Old Microwave Build<strong>in</strong>g, N C Railway, Juhi, Kanpur, on any work<strong>in</strong>g day on furnish<strong>in</strong>g<br />

a Demand Draft <strong>in</strong> favour of Dy FA & CAO/IRPMU/New Delhi, of Rs. 5000/- (Rs. Ten<br />

Thousands only) per set and Rs. 5500/- per set if required by post. Cost of the Tender<br />

documents is non-refundable and Tender documents are non-transferable.<br />

M<strong>in</strong>imum Eligibility Criterion<br />

I - Tenderer(s) should have successfully executed dur<strong>in</strong>g last three f<strong>in</strong>ancial<br />

years (i.e. current year and three previous f<strong>in</strong>ancial years), at least one work of similar<br />

nature* of not less than 35% of the value of the present tender (<strong>in</strong>dividually or by either<br />

of the consortium/collaboration partners).<br />

II - As proof of sufficient f<strong>in</strong>ancial capacity and organizational resources,<br />

contractor should have received total contract amount dur<strong>in</strong>g the last three f<strong>in</strong>ancial years<br />

and <strong>in</strong> current year a m<strong>in</strong>imum of 150% of the advertised value of work. As a proof of<br />

these qualify<strong>in</strong>g criteria, the tenderer should submit the audited balance sheet duly<br />

certified by Chartered Accountant or attested certificates from the employer/ client.<br />

( * ) Def<strong>in</strong>ition of Similar Nature Works:<br />

(a)<br />

(b)<br />

Outdoor and Indoor Signall<strong>in</strong>g works of RRI/PI/EI/MACLS/Automatic<br />

signall<strong>in</strong>g or<br />

Outdoor Signall<strong>in</strong>g works of RRI/PI/EI/MACLS/Automatic signall<strong>in</strong>g<br />

Tenders not accompanied with documents <strong>in</strong> support of credentials, and without complete<br />

documentation as mentioned <strong>in</strong> tender papers, shall not be considered and will be rejected<br />

summarily.<br />

Tender Forms complete <strong>in</strong> all respect with all credentials duly sealed <strong>in</strong> an envelope and<br />

mention<strong>in</strong>g the name of work, should be deposited <strong>in</strong> the tender box allotted <strong>for</strong> the<br />

purpose <strong>in</strong> the office of Chief Adm<strong>in</strong>istrative Officer, Shivaji Bridge (IRCOT Complex),<br />

Beh<strong>in</strong>d Shanker Market, New Delhi.<br />

Tender duly sealed <strong>in</strong> the prescribed manner can also be sent through registered post so<br />

as to reach <strong>in</strong> the office of Chief Adm<strong>in</strong>istrative Officer, Shivaji Bridge (IRCOT<br />

Complex), Beh<strong>in</strong>d Shanker Market, New Delhi, not later than date and time specified<br />

above. Any tender received after the specified date/ time shall be a late / delayed tender.<br />

In case of last date of submission of tender papers happens to be a holiday, the tender<br />

paper will be received and opened on the next work<strong>in</strong>g day at the same time.<br />

Tender notice is also available on IRPMU website www.<strong>irpmu</strong>.<strong>railnet</strong>.<strong>gov</strong>.<strong>in</strong> . Tender<br />

document will also be available on this websites from the date of sale of tender <strong>for</strong>ms.<br />

Tenderers who are submitt<strong>in</strong>g their bid <strong>in</strong> downloaded tender <strong>for</strong>m are required to deposit<br />

the cost of tender document separately (Rs. 5000/-) as per <strong>in</strong>structions given above.<br />

Signature of contractor Page 6 of 127 Dy CSTE/IRPMU/Kanpur


If the tenderer/s deliberately gives wrong <strong>in</strong><strong>for</strong>mation/Credentials/documents <strong>in</strong><br />

his/their tenders and thereby create(s) circumstances <strong>for</strong> acceptance of his / their<br />

tender, Railway reserves the right to reject such tender at any stage, besides, shall<br />

suspend the Bus<strong>in</strong>ess <strong>for</strong> one year.<br />

All the payments to tenderer will be done through EFT/ETCS<br />

No.: IRPMU/S&T/CNB/PNK-BPU 3 rd l<strong>in</strong>e/Outdoor/08-09/04 Dated: 28/11/2008<br />

Dy CSTE/IRPMU/NCR/Kanpur<br />

For and on Behalf of President of India<br />

Signature of contractor Page 7 of 127 Dy CSTE/IRPMU/Kanpur


PREAMBLE<br />

Tender No. IRPMU/S&T/CNB/PNK-BPU 3 rd l<strong>in</strong>e/Outdoor/08-09/04<br />

1. NAME OF WORK:<br />

Indoor and Outdoor signall<strong>in</strong>g works consist<strong>in</strong>g of trench<strong>in</strong>g, cable lay<strong>in</strong>g, term<strong>in</strong>ation of<br />

cables, cast<strong>in</strong>g of foundations, erection of signals & locations, relay and power supply<br />

wir<strong>in</strong>g, track circuit<strong>in</strong>g work, po<strong>in</strong>t mach<strong>in</strong>e work etc., and their test<strong>in</strong>g & commission<strong>in</strong>g<br />

<strong>in</strong> connection of ‘Provision of EI based automatic signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bidirectional<br />

signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong> Panki-Bhaupur section<br />

and at Panki & Bhaupur stations on Kanpur-Etawah section of Allahabad division of<br />

North Central Railway’.<br />

2. SCOPE OF WORK:<br />

2.1 The scope of work is as follows:<br />

A) Panki-Bhapur block section:<br />

a) Panki-Bhaupur section falls at Kanpur end of Kanpur-Etawah section of Allahabad<br />

division of North Central Railway. Section length is approx. 9 Kms. At present the<br />

section has double l<strong>in</strong>e, with one l<strong>in</strong>e used as Up l<strong>in</strong>e while the other as Down l<strong>in</strong>e.<br />

The new work is about “Provision of Third L<strong>in</strong>e between Panki and Bhaupur”.<br />

b) At present Panki-Bhaupur section has follow<strong>in</strong>g signal<strong>in</strong>g arrangements:<br />

• Automatic signal<strong>in</strong>g on both the l<strong>in</strong>es<br />

• Dual track detection us<strong>in</strong>g audio frequency track circuit and axle counter <strong>in</strong><br />

parallel.<br />

• LED type signals provided every one Km.<br />

• AFTC is US&S make UM71<br />

• Axle counters are Alcatel make.<br />

• Section has 3 prefabricated relay huts (called L<strong>in</strong>e side cab<strong>in</strong>ets) to control the<br />

auto signals.<br />

• The signals are controlled us<strong>in</strong>g US&S make Microloks.<br />

c) In the scope of tendered work, the exist<strong>in</strong>g Up l<strong>in</strong>e will be converted to bidirectional<br />

l<strong>in</strong>e and the new Third l<strong>in</strong>e will be made Up l<strong>in</strong>e.<br />

d) The signall<strong>in</strong>g arrangement on the Third l<strong>in</strong>e will be Automatic signal<strong>in</strong>g with SSI,<br />

AFTC and LED type signals etc.<br />

e) The new signals that will be provided on exist<strong>in</strong>g Up l<strong>in</strong>e (<strong>for</strong> mak<strong>in</strong>g it bi-di) <strong>in</strong><br />

the opposite direction have to as far as possible use the exist<strong>in</strong>g track detection<br />

system.<br />

f) Build<strong>in</strong>g three new pre-fabricated build<strong>in</strong>gs (near the adjacent ones) is with<strong>in</strong> the<br />

scope of present work.<br />

g) These pre-fabs will house the new SSIs, AFTC equipment etc. required to control<br />

the new signall<strong>in</strong>g gears provided on Third l<strong>in</strong>e. These SSIs will be connected to<br />

the exist<strong>in</strong>g SSIs. Provision of SSI and AFTC is covered <strong>in</strong> separate tender <strong>for</strong><br />

Indoor works.<br />

Signature of contractor Page 8 of 127 Dy CSTE/IRPMU/Kanpur


B) Bhaupur (yard)<br />

a) Bhaupur yard, at present has Solid State Interlock<strong>in</strong>g of US&S make. It has dual<br />

track detection system with Alcatel make MSDAC <strong>in</strong> parallel with DC track circuit<br />

on ma<strong>in</strong> l<strong>in</strong>e and axle counter alone on the loop l<strong>in</strong>e.<br />

b) Connect<strong>in</strong>g Third l<strong>in</strong>e at Bhaupur <strong>in</strong>volves yard modification and changes to<br />

signall<strong>in</strong>g arrangements. The work will <strong>in</strong>volve shift<strong>in</strong>g of exist<strong>in</strong>g po<strong>in</strong>ts, signals<br />

etc. and also <strong>in</strong>stallation of new ones. These outdoor works are with<strong>in</strong> the scope of<br />

present tender.<br />

C) Panki yard<br />

a) Just like Bhaupur yard, connection of Third l<strong>in</strong>e at Panki also <strong>in</strong>volves yard remodell<strong>in</strong>g.<br />

All the Indoor work and most of the outdoor work is beyond scope of<br />

present tender.<br />

b) However, the outdoor works <strong>in</strong>volv<strong>in</strong>g DC track circuit<strong>in</strong>g work and some po<strong>in</strong>t<br />

and signal work is part of present tender.<br />

3. <strong>TENDER</strong> BID<br />

The tender be<strong>in</strong>g a s<strong>in</strong>gle packet tender, the tender bid shall be submitted <strong>in</strong> one<br />

sealed cover as under <strong>in</strong> time with<strong>in</strong> the last date/time of tender submission <strong>in</strong> the<br />

sealed Tender Box to be kept <strong>for</strong> the purpose <strong>in</strong> the office of Chief Adm<strong>in</strong>istrative<br />

Officer/IRPMU, Shivaji Bridge (IRCOT complex),New Delhi 110001.<br />

Tender notice and tender documents are published <strong>in</strong> website<br />

www.<strong>irpmu</strong>.<strong>railnet</strong>.<strong>gov</strong>.<strong>in</strong> which can be downloaded. In case, the tender documents<br />

are downloaded the Tenderer/ s are required to pay non-refundable cost of tender<br />

documents <strong>in</strong> the <strong>for</strong>m prescribed <strong>in</strong> tender notice while submitt<strong>in</strong>g their offer. If<br />

they fail to furnish the requisite cost of tender documents <strong>in</strong> prescribed <strong>for</strong>m, their<br />

offer shall be rejected. The cost of EMD shall not be merged with cost of tender<br />

<strong>for</strong>m and shall be separately furnished.<br />

In case, the tender documents are downloaded the tenderer/s are required to furnish a<br />

certificate on the letter pad of their firm that they have downloaded the tender<br />

document from the website and they are advised to compare the downloaded copy<br />

with the office copy available <strong>in</strong> the office of Chief Adm<strong>in</strong>istrative Officer., Indian<br />

Railway Project Management Unit, New Delhi. In case, at any stage, there is any<br />

difference found between the office copy of tender document and downloaded copy,<br />

office copy of the tender document will be treated as f<strong>in</strong>al and the same shall be<br />

b<strong>in</strong>d<strong>in</strong>g.<br />

In case the cost of tender document is not accompanied with the tender, the earnest<br />

money will be released only after the tenderer/s submits the cost of the tender<br />

document <strong>in</strong> any <strong>for</strong>m.<br />

The details to be <strong>in</strong>cluded with the bid are given <strong>in</strong> `Instructions to Tenderers and<br />

Conditions of Tender<strong>in</strong>g'.<br />

Signature of contractor Page 9 of 127 Dy CSTE/IRPMU/Kanpur


4. QUALIFYING CRITERIA<br />

To qualify <strong>for</strong> the bid, the Contractor shall be required to meet the eligibility<br />

requirements as given <strong>in</strong> Para – 18.2 of Instructions to Tenderers and Conditions of<br />

Tender<strong>in</strong>g.<br />

5. LAST DATE OF SUBMISSION:<br />

The Tender shall be submitted on 23 rd December 2008 up to 15.00 Hrs <strong>in</strong> the office<br />

of Chief Adm<strong>in</strong>istrative Officer, Shivaji Bridge (IRCOT Complex), Beh<strong>in</strong>d Shanker<br />

Market, New Delhi -110001.<br />

6. DATE OF OPENING OF <strong>TENDER</strong>:<br />

The Tender will be opened at 16.00 Hrs on the same day <strong>in</strong> the office of Chief<br />

Adm<strong>in</strong>istrative Officer, Shivaji Bridge (IRCOT Complex), Beh<strong>in</strong>d Shanker Market,<br />

New Delhi -110001.<br />

7. COMPLETION PERIOD OF WORK:<br />

The entire work is to be completed with<strong>in</strong> 6 (Six) months from the date of issue of<br />

Letter of Acceptance of the Tender.<br />

8. THE LIST OF ADDRESS TO WHICH CORRESPONDENCE AND<br />

<strong>DOCUMENT</strong>S RELATING TO THE CONTRACT SHOULD BE SENT<br />

(a) Prior to award of the contract:<br />

Dy Chief Signal and Telecommunication Eng<strong>in</strong>eer (Dy CSTE),<br />

Indian railway project management unit (IRPMU),<br />

Old microwave build<strong>in</strong>g, North Central railway,<br />

JUHI, KANPUR.<br />

Telephone No. +91 512 2653295, 9794864000 (mobile).<br />

(b) After the award of the Contract:<br />

Dy Chief Signal and Telecommunication Eng<strong>in</strong>eer (Dy CSTE),<br />

Indian railway project management unit (IRPMU),<br />

Old microwave build<strong>in</strong>g, North central railway,<br />

JUHI, KANPUR.<br />

Telephone No. +91 512 2653295, 9794864000 (mobile).<br />

9. EARNEST MONEY:<br />

The Tenderer should furnish the requisite Earnest Money offer <strong>in</strong> favour of the ‘Dy<br />

FA & CAO, IRPMU, New Delhi’ along with their offer as <strong>in</strong>dicated <strong>in</strong> Para-5 of<br />

Instructions to Tenderers and Conditions of Tender<strong>in</strong>g.<br />

Signature of contractor Page 10 of 127 Dy CSTE/IRPMU/Kanpur


10. SUPPLY OF MATERIALS:<br />

Tenderer’s special attention is <strong>in</strong>vited to the list of materials to be supplied/ arranged<br />

by the Railways <strong>for</strong> commission<strong>in</strong>g of the system. Cables, Integrated Power Supply<br />

(IPS), all types of LED signal units and po<strong>in</strong>t mach<strong>in</strong>es are the items supplied by<br />

Railways from the stores of Sr. Section Eng<strong>in</strong>eer/Signal/IRPMU at Kanpur/Tundla.<br />

All other materials to achieve end objective shall be supplied by contractor.<br />

11. SPECIFICATIONS/DRAWINGS:<br />

Reference of specification/draw<strong>in</strong>g of the important equipment, components and<br />

other materials required <strong>for</strong> the execution of the Contract is given <strong>in</strong> the<br />

Schedule/Technical Specifications. The work shall be executed <strong>in</strong> compliance with<br />

all the technical requirements given there.<br />

12. SCHEDULE OF REQUIREMENT OF QUANTITIES:<br />

The Schedule of Requirement of Quantities <strong>for</strong> Supply & Execution of various<br />

works is <strong>in</strong>dicated <strong>in</strong> Schedule A and B (Section I Chapter 3). The tenderers are<br />

advised to quote <strong>for</strong> all items.<br />

**********<br />

Signature of contractor Page 11 of 127 Dy CSTE/IRPMU/Kanpur


Section – I<br />

Chapter – 3<br />

Schedule of<br />

Requirement of Quantities<br />

Signature of contractor Page 12 of 127 Dy CSTE/IRPMU/Kanpur


Name of work:<br />

Indoor and Outdoor signall<strong>in</strong>g works consist<strong>in</strong>g of trench<strong>in</strong>g, cable lay<strong>in</strong>g, term<strong>in</strong>ation of<br />

cables, cast<strong>in</strong>g of foundations, erection of signals & locations, relay and power supply wir<strong>in</strong>g,<br />

track circuit<strong>in</strong>g work, po<strong>in</strong>t mach<strong>in</strong>e work etc., and their test<strong>in</strong>g & commission<strong>in</strong>g <strong>in</strong><br />

connection of ‘Provision of EI based automatic signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bi-directional<br />

signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong> Panki-Bhaupur section and at Panki &<br />

Bhaupur stations on Kanpur-Etawah section of Allahabad division of North Central Railway’.<br />

SCHEDULE ‘A’<br />

Sr. Description Unit Qty. Rate Amount<br />

No.<br />

1. Excavation of cable trench as per cable route<br />

plan, 1 mt. deep and 300 mm wide along side<br />

the track <strong>in</strong> all types of soil, con<strong>for</strong>m<strong>in</strong>g to<br />

distances as per cable route plan and refill<strong>in</strong>g<br />

after cable lay<strong>in</strong>g. This work <strong>in</strong>cludes cover<strong>in</strong>g<br />

of cable laid <strong>in</strong> trenches by loose soil <strong>for</strong> a<br />

layer of 50 mm thickness approximately be<strong>for</strong>e<br />

cover<strong>in</strong>g by shahabad stone / bricks, clear<strong>in</strong>g of<br />

route, bushes etc. The work shall be done as<br />

per extant practice on N C Railway and<br />

<strong>in</strong>structions of Railway Eng<strong>in</strong>eer at site. In case<br />

depth of trench not achievable due to site<br />

conditions proportionate payment will be made.<br />

P.<br />

Mtr.<br />

19300 31.18 601774.00<br />

2. Excavation of cable trench as per cable route<br />

plan, 1 mt. deep and 300 mm wide along side<br />

the track <strong>in</strong> hard soil, con<strong>for</strong>m<strong>in</strong>g to distances<br />

as per cable route plan and refill<strong>in</strong>g after cable<br />

lay<strong>in</strong>g. This work <strong>in</strong>cludes cover<strong>in</strong>g of cable<br />

laid <strong>in</strong> trenches by loose soil <strong>for</strong> a layer of 50<br />

mm thickness approximately be<strong>for</strong>e cover<strong>in</strong>g<br />

by shahabad stone / bricks, clear<strong>in</strong>g of route,<br />

bushes etc. The work shall be done as per<br />

extant practice on N C Railway and<br />

<strong>in</strong>structions of Railway Eng<strong>in</strong>eer at site. In case<br />

depth of trench not achievable due to site<br />

conditions proportionate payment will be made.<br />

P.<br />

Mtr.<br />

200 43.56 8712.00<br />

3. Fabrication, supply and fix<strong>in</strong>g of cable marker<br />

of 1: 3 : 6 concrete as per drg. No. – NR / S&T<br />

/ CON /1.5.97. The marker shall be fixed at<br />

various places of cable route as per <strong>in</strong>structions<br />

of Eng<strong>in</strong>eer at site.<br />

Nos. 650 159.74 103831.00<br />

Signature of contractor Page 13 of 127 Dy CSTE/IRPMU/Kanpur


4. Lay<strong>in</strong>g of Signall<strong>in</strong>g / Telecom / Power cables<br />

of different sizes as per drg.<br />

No.(NR/S&T/CON/1. 1/97) and as per cable<br />

route plan approved by Railways and<br />

megger<strong>in</strong>g of cable be<strong>for</strong>e and after its lay<strong>in</strong>g<br />

of all type of outdoor cables.<br />

P.<br />

Mtr.<br />

90500 3.31 299555.00<br />

5.<br />

Horizontal bor<strong>in</strong>g under railway track/ road <strong>for</strong><br />

lay<strong>in</strong>g 120 mm dia., DWC (Double Walled<br />

Corrugated) pipes at the depth of 1.4 meter to<br />

2.1 meter from <strong>for</strong>mation level (Level of earth<br />

below ballast) as per draw<strong>in</strong>g and directed by<br />

eng<strong>in</strong>eer-<strong>in</strong>-charge by trenchless technology<br />

exclud<strong>in</strong>g the cost of DWC pipes. Size of the<br />

bore at any location <strong>for</strong> lay<strong>in</strong>g DWC pipes will<br />

be decided by Eng<strong>in</strong>eer <strong>in</strong> charge.<br />

P.<br />

Mtr.<br />

1080 2700.07 2916075.6<br />

0<br />

(a) The cost shall <strong>in</strong>clude horizontal bor<strong>in</strong>g<br />

through any <strong>in</strong>termediate obstruction, either<br />

natural or man made or any bouldry strata.<br />

(b) The rate is <strong>in</strong>clusive of all the materials,<br />

equipments and labour required <strong>for</strong> do<strong>in</strong>g<br />

trenchless horizontal bor<strong>in</strong>g under the railway<br />

track, Noth<strong>in</strong>g extra shall be admissible on any<br />

account then the rates quoted above.<br />

(c) The pipes are to be laid under railway track/<br />

road. All necessary arrangements are to be<br />

provided and all precautions are to be taken, so<br />

that bore com<strong>in</strong>g out at other end is not<br />

deviated from the horizontal level l<strong>in</strong>e by more<br />

than 250 mm <strong>in</strong> horizontal or vertical direction.<br />

(d) The rates shall be <strong>in</strong>clusive of detection and<br />

protection of underground utilities encountered<br />

dur<strong>in</strong>g bor<strong>in</strong>g.<br />

(e) The payment <strong>for</strong> bor<strong>in</strong>g shall be made only<br />

when DWC pipes provided <strong>in</strong> item No. 3 of<br />

Schedule ‘B’ are laid <strong>in</strong> the bore.<br />

6. Supply and lay<strong>in</strong>g of second class bricks <strong>in</strong> the<br />

trench as per Drg No. (NR/S&T//Con//1.1/97)<br />

and <strong>in</strong>structions of Eng<strong>in</strong>eer at site.<br />

Per<br />

Bric<br />

k<br />

15600<br />

0<br />

2.11 329160.00<br />

Signature of contractor Page 14 of 127 Dy CSTE/IRPMU/Kanpur


7. Fix<strong>in</strong>g of G.I. pipe 75 mm dia, 3mm thick<br />

per<strong>for</strong>ated at a distance of 20 cm or less of<br />

required length at culverts/ bridges, suitably<br />

concreted at both ends as per drg. No.<br />

(RE/S&T/ SIG/ TENDE /SK /27/85) to be<br />

filled with chattered compound. G.I. clamps of<br />

M.S. flats, bolts and nut to be supplied by the<br />

contractor.<br />

8. Lay<strong>in</strong>g of RCC pipe <strong>in</strong>clud<strong>in</strong>g split pipe where<br />

required <strong>in</strong> the trench across the track/road &<br />

L-X<strong>in</strong>g gates etc. as per Drg. No. (CORE/S&T/<br />

ALD/ SK/373/93)<br />

Per<br />

mtr<br />

Per<br />

mtr<br />

50 37.97 1898.50<br />

120 36.61 4393.20<br />

9. Cast<strong>in</strong>g, concret<strong>in</strong>g and cur<strong>in</strong>g of foundation of<br />

Apparatus Cases (S<strong>in</strong>gle) as per drg. No.<br />

(RE/S&T/SIG/<strong>TENDER</strong>/SK/9/85). All<br />

materials such as cement, sand, aggregate and<br />

anchor bolts shall be supplied by the contractor.<br />

Contractor is required to execute all types of<br />

repair works of foundations if required while<br />

<strong>in</strong>sert<strong>in</strong>g the cable <strong>for</strong> term<strong>in</strong>ation.<br />

10. Cast<strong>in</strong>g, concret<strong>in</strong>g and cur<strong>in</strong>g of foundation of<br />

Half Apparatus cases as per Drg. No.<br />

(RE/S&T/SIG/<strong>TENDER</strong>/SK/8/85). All<br />

material such as cement, sand, aggregate and<br />

anchor bolt shall be supplied by contractor.<br />

Contractor is required to execute all type of<br />

repair works of foundations if required while<br />

<strong>in</strong>sert<strong>in</strong>g the cable <strong>for</strong> term<strong>in</strong>ation.<br />

Nos. 62 6031.49 373952.38<br />

Nos. 93 5856.56 544660.08<br />

11. Erection of Apparatus cases. This <strong>in</strong>cludes<br />

fill<strong>in</strong>g of location foundations with river bed<br />

sand and plaster<strong>in</strong>g on top of the sand.<br />

a) S<strong>in</strong>gle case as per Drg. No- RST / C /11175 Nos. 62 744.44 46155.28<br />

b) Half case as per Drg. No.- RST / C /11176 Nos. 93 579.01 53847.93<br />

12. Fabrication and fix<strong>in</strong>g of Hylum board <strong>in</strong><br />

location box by provid<strong>in</strong>g all fixtures as per<br />

Railway Draw<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g fix<strong>in</strong>g of PVC<br />

coated str<strong>in</strong>g rods at the back side <strong>for</strong> cable<br />

support with contractor's own materials. The<br />

work shall be done as per drg. And <strong>in</strong>structions<br />

of Railway Eng<strong>in</strong>eer at site.<br />

a) S<strong>in</strong>gle case as per Drg. No. RST / C /11175 / A Nos. 62 1482.11 91890.82<br />

Signature of contractor Page 15 of 127 Dy CSTE/IRPMU/Kanpur


) Half Case as per Drg. No. RST / C/11176 / A Nos. 93 1335.66 124216.38<br />

13. Fix<strong>in</strong>g of ARA term<strong>in</strong>als and fuse blocks with<br />

provision of holes on hylum sheets and fix<strong>in</strong>g<br />

by galvanised nuts and bolts. This <strong>in</strong>cludes<br />

provision of two additional holes on the hylum<br />

board on either side <strong>for</strong> cable conductor entry.<br />

The work shall be done as per the <strong>in</strong>struction of<br />

Railway Eng<strong>in</strong>eer at site.<br />

Nos. 13515 9.49 128257.35<br />

14. Term<strong>in</strong>ation of cable cores on ARA term<strong>in</strong>al /<br />

fuse blocks, <strong>in</strong> the apparatus cases / cable<br />

term<strong>in</strong>ation rack. This <strong>in</strong>cludes all associated<br />

works of pull<strong>in</strong>g out the cable from<br />

underground. The work shall be done as per<br />

location plans and <strong>in</strong>structions of Railway<br />

Eng<strong>in</strong>eer at site.<br />

P.<br />

Core<br />

10000 6.78 67800.00<br />

15. Charg<strong>in</strong>g of secondary cells as per charg<strong>in</strong>g<br />

procedure prescribed by the manufacturer and<br />

approved by the Railway. Two numbers of<br />

charged / discharged cycles should take place<br />

as per standard practice. All material battery<br />

grade distilled water will be supplied by<br />

contractor.<br />

Nos. 260 108.72 28267.20<br />

16.<br />

Installation of DC track circuits <strong>in</strong> RE area as<br />

per std. Practice. This will <strong>in</strong>clude follow<strong>in</strong>g:<br />

(a) Bond<strong>in</strong>g work across fish plates to be<br />

executed separately through Exothermic<br />

Weld<strong>in</strong>g method vide Item No. 17.<br />

(b) Jumper<strong>in</strong>g from rail to rail or to track lead<br />

junction box (<strong>in</strong>clud<strong>in</strong>g polarity jumpers /<br />

cables <strong>in</strong> case of po<strong>in</strong>t track circuit) to be<br />

executed through Exothermic Weld as per item<br />

Nos. – 18 and 19 as per Drg. No. – NR / S&T /<br />

CON / 3.1.97 and as per <strong>in</strong>sulation diagram.<br />

This <strong>in</strong>cludes fix<strong>in</strong>g of jumpers to the rails<br />

term<strong>in</strong>at<strong>in</strong>g the jumpers <strong>in</strong> the TL JB and fix<strong>in</strong>g<br />

the jumper on the sleeper as per <strong>in</strong>structions of<br />

Eng<strong>in</strong>eer at site, fitt<strong>in</strong>g of GI pipe and lay<strong>in</strong>g of<br />

jumper cables through the pipe. One TLJB to<br />

be provided extra <strong>for</strong> each polarity<br />

jumper/cable. All materials <strong>in</strong>clud<strong>in</strong>g G.I. pipe<br />

is to be supplied by the contractor.<br />

Signature of contractor Page 16 of 127 Dy CSTE/IRPMU/Kanpur


(c) Fix<strong>in</strong>g of <strong>in</strong>sulated block jo<strong>in</strong>ts complete<br />

with provision of skimmed fishplate. Fishplates<br />

shall be supplied by the Railways but<br />

skimm<strong>in</strong>g to be done by contractor. Supply of<br />

<strong>in</strong>sulation materials is not <strong>in</strong>cluded.<br />

(d) Fix<strong>in</strong>g of TLJBs as per drg. No. – NR /<br />

S&T / CON / 3.2.97 along with concrete<br />

foundation and plaster<strong>in</strong>g on both ends i.e. T.F.<br />

and TR end. All material <strong>for</strong> fix<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g<br />

angle iron shall be supplied by the contractor.<br />

This also <strong>in</strong>cludes supply and fix<strong>in</strong>g of TLJBs<br />

with provision of M-6 term<strong>in</strong>als TL JB to be<br />

written with track circuit number.<br />

(e) Provision and wir<strong>in</strong>g <strong>in</strong> the app. Cases of<br />

T.F. battery charger TF resistance 30 Ohm,<br />

track relays & batteries as per the standard<br />

practice us<strong>in</strong>g NDT fuses and term<strong>in</strong>als. This<br />

will <strong>in</strong>clude suitable anti-tilt<strong>in</strong>g arrangement<br />

<strong>for</strong> relays.<br />

(f) Commission<strong>in</strong>g of track circuits as per<br />

provisions of Para of IRS specn. S -36/81. This<br />

<strong>in</strong>cludes adjustment of track feed resistance,<br />

test<strong>in</strong>g with tra<strong>in</strong> shunt resistance. This also<br />

<strong>in</strong>cludes preparation of track history cards.<br />

Track history card should be supplied by the<br />

contractor.<br />

i) Berth<strong>in</strong>g track circuit. Nos. 9 8203.11 73827.99<br />

ii)<br />

2 to 5 rail length track circuit / Other than<br />

Berth<strong>in</strong>g track circuits.<br />

Nos. 25 7887.60 197190.00<br />

iii) Po<strong>in</strong>t track circuit <strong>for</strong> s<strong>in</strong>gle ended po<strong>in</strong>t. Nos. 13 8158.04 106054.52<br />

iv) Po<strong>in</strong>t track circuit <strong>for</strong> double ended po<strong>in</strong>t. Nos. 5 8781.53 43907.65<br />

17. Supply & Installation of Rail head cont<strong>in</strong>uity<br />

Bond<strong>in</strong>g material. This will <strong>in</strong>clude supply of<br />

all material <strong>in</strong>clud<strong>in</strong>g bond wire, weld powder,<br />

Fl<strong>in</strong>t igniter etc. Each set (suitable <strong>for</strong> 100<br />

cont<strong>in</strong>uity bonds) to conta<strong>in</strong> 100 Nos. of bond<br />

wire, one pair of replacement mould, one fl<strong>in</strong>t<br />

igniter and 200 Nos. of suitable Exothermic<br />

weld use powder <strong>for</strong> TIR 6 weld<strong>in</strong>g tools.<br />

Per<br />

set<br />

2 71506.40 143012.80<br />

Signature of contractor Page 17 of 127 Dy CSTE/IRPMU/Kanpur


18 Supply and fix<strong>in</strong>g of bonds of 3/16" 6 1/2 " of<br />

XS style no. IRS BS 24882 <strong>in</strong> boxes. Each box<br />

conta<strong>in</strong><strong>in</strong>g 100nos. Of bond of 3/16" dia of XS<br />

style no. IRS BS 24882 along with one pair of<br />

replacement moulds, fire igniter and necessary<br />

weld metal.<br />

19. Weld<strong>in</strong>g of jo<strong>in</strong>t of cable size 3/16" useful on<br />

rail web <strong>for</strong> TLJB/BOOTLEG application by<br />

Exothermic WELD bond<strong>in</strong>g method. All<br />

consumable materials shall be supplied by<br />

Railways.<br />

No.<br />

of<br />

bond<br />

s<br />

Per<br />

Wel<br />

d<br />

172 625.68 107616.96<br />

172 21.71 3734.12<br />

20. Supply, shap<strong>in</strong>g, drill<strong>in</strong>g holes, erection,<br />

pa<strong>in</strong>t<strong>in</strong>g and test<strong>in</strong>g of MS flat 50mm * 6mm<br />

of required length <strong>in</strong> pair and fix<strong>in</strong>g across<br />

exist<strong>in</strong>g glued jo<strong>in</strong>t both side (<strong>in</strong>side and<br />

outside) of the rail, by drill<strong>in</strong>g two nos. of holes<br />

of required size <strong>in</strong> the rails, with supply and<br />

fix<strong>in</strong>g of two copper rivets of size<br />

16mm*28mm.<br />

Nos. 150 388.51 58276.50<br />

21 Removal of exist<strong>in</strong>g mechanical po<strong>in</strong>t fitt<strong>in</strong>gs<br />

and FPL assembly from po<strong>in</strong>ts, fix<strong>in</strong>g of po<strong>in</strong>t<br />

mach<strong>in</strong>e, ground connection, adjustment and<br />

test<strong>in</strong>g with crank handle <strong>for</strong> operation.<br />

Removal of ground connection, po<strong>in</strong>t mach<strong>in</strong>e<br />

after test<strong>in</strong>g (duly numbered) and refix<strong>in</strong>g of<br />

mechanical po<strong>in</strong>t fitt<strong>in</strong>gs. This will <strong>in</strong>clude<br />

fabrication and fix<strong>in</strong>g of bent pipes with<br />

welded frame <strong>for</strong> cable entry to the po<strong>in</strong>t<br />

mach<strong>in</strong>e and term<strong>in</strong>ation of tail cable <strong>in</strong> po<strong>in</strong>t<br />

mach<strong>in</strong>e and wir<strong>in</strong>g servic<strong>in</strong>g of po<strong>in</strong>t mach<strong>in</strong>e<br />

and supply and fill<strong>in</strong>g of SAE 30 lubricat<strong>in</strong>g oil<br />

(500 ml. approx.). This also <strong>in</strong>cludes supply of<br />

all fix<strong>in</strong>g material, necessary fitt<strong>in</strong>g and<br />

adjustment to make the mechanically operated<br />

po<strong>in</strong>ts functional aga<strong>in</strong> (Ord<strong>in</strong>ary layout / derail<br />

switch / double slip / s<strong>in</strong>gle slip). The work<br />

shall be done as per extant practice on NC<br />

Railway and the <strong>in</strong>structions of Railway<br />

eng<strong>in</strong>eer at site.<br />

Per<br />

T/O<br />

2 3526.96 7053.92<br />

Signature of contractor Page 18 of 127 Dy CSTE/IRPMU/Kanpur


22. Refix<strong>in</strong>g of electrical po<strong>in</strong>t mach<strong>in</strong>e, ground<br />

connection dur<strong>in</strong>g phase work<strong>in</strong>g (Non<br />

<strong>in</strong>terlock work<strong>in</strong>g ) after remov<strong>in</strong>g the<br />

mechanical fitt<strong>in</strong>g , if any, adjustment if<br />

necessary , test<strong>in</strong>g and commission<strong>in</strong>g of<br />

electrically operated po<strong>in</strong>t, fix<strong>in</strong>g and<br />

connect<strong>in</strong>g po<strong>in</strong>t <strong>in</strong>dicator on derail switch if<br />

necessary . Term<strong>in</strong>ation of cable and its wir<strong>in</strong>g<br />

<strong>in</strong> case of newly laid T/O switch if necessary<br />

(ord<strong>in</strong>ary layout / derail switch / double slip /<br />

s<strong>in</strong>gle slip ). The work shall be done as per<br />

extant practice on NC Railway and the<br />

<strong>in</strong>structions of Railway eng<strong>in</strong>eer at site.<br />

23. Fix<strong>in</strong>g of po<strong>in</strong>t mach<strong>in</strong>e on newly laid turnout<br />

on wooden / MBC sleepers fix<strong>in</strong>g of ground<br />

connections. Adjustment and test<strong>in</strong>g with crank<br />

handle operations. Removal of ground<br />

connection and po<strong>in</strong>t mach<strong>in</strong>es duly numbered.<br />

This will <strong>in</strong>clude fabrication and fix<strong>in</strong>g of bend<br />

pipes with welded frame <strong>for</strong> cable entry to<br />

mach<strong>in</strong>e. This will also <strong>in</strong>cludes necessary<br />

adjustment and smithy work, drill<strong>in</strong>g of holes<br />

to tounge rails, fitt<strong>in</strong>g of <strong>in</strong>sulation <strong>for</strong> tounge<br />

attachment, gauge plate and William stretcher.<br />

The work shall be done as per extant practice<br />

on N C Railway and the <strong>in</strong>structions of<br />

Railway eng<strong>in</strong>eer at site.<br />

Per<br />

T/O<br />

Per<br />

T/O<br />

20 2804.21 56084.20<br />

20 2237.40 44748.00<br />

24. Fabrication and supply of po<strong>in</strong>t rodd<strong>in</strong>g<br />

(Ground Connection) set with <strong>in</strong>sulation <strong>for</strong><br />

Electric Po<strong>in</strong>t Mach<strong>in</strong>e (RDSO Type) as per<br />

RDSO Drg. No. RDSO / S / 3301-02<br />

25. Provision of crank handle lock<strong>in</strong>g arrangement<br />

on two po<strong>in</strong>t mach<strong>in</strong>e of turnout to suit ward<br />

group as per Standard Siemens Practice of<br />

us<strong>in</strong>g keys of different wards with ward plates<br />

and <strong>in</strong>structions of Site Eng<strong>in</strong>eer. Crank<br />

handles to be supplied by Railways.<br />

Nos. 22 5056.43 111241.46<br />

Nos. 9 731.19 6580.71<br />

Signature of contractor Page 19 of 127 Dy CSTE/IRPMU/Kanpur


26. Supply and <strong>in</strong>stallation of fac<strong>in</strong>g po<strong>in</strong>t<br />

operation layout and fac<strong>in</strong>g po<strong>in</strong>t lock layout<br />

with lock and lock bar and connections of<br />

po<strong>in</strong>ts/ lock bar start<strong>in</strong>g from lever <strong>in</strong> cab<strong>in</strong> and<br />

connection up to po<strong>in</strong>ts/lockbar. This <strong>in</strong>cludes<br />

mak<strong>in</strong>g of connect<strong>in</strong>g rods, fix<strong>in</strong>g of various<br />

cranks, compensators, A & B type foundations<br />

as per Drg No (RE/S&T/SIG/<strong>TENDER</strong><br />

/SK/11/85), radial guides, treastles, roller<br />

guides, roller guide assembly, po<strong>in</strong>t solid<br />

rodd<strong>in</strong>g 32mm, solid jo<strong>in</strong>ts, screw jo<strong>in</strong>ts and<br />

po<strong>in</strong>t adjust<strong>in</strong>g screw etc. Cast<strong>in</strong>g of<br />

foundations <strong>for</strong> cranks and compensators and<br />

mak<strong>in</strong>g lead-out <strong>in</strong>clud<strong>in</strong>g smithy work. All<br />

material except po<strong>in</strong>t rodd<strong>in</strong>g solid and Lever<br />

will be supplied by the contractor. Fix<strong>in</strong>g of<br />

FPL as per Drg No.<br />

(RE/S&T/SIG/<strong>TENDER</strong>/SK/35/85).<br />

27. Excavation and cast<strong>in</strong>g of ma<strong>in</strong> signal<br />

foundation as per Drg. No. RST 11173 with<br />

contractor's own materials <strong>in</strong>clud<strong>in</strong>g cement<br />

and anchor bolts of standard size. The required<br />

scaffold<strong>in</strong>g Ferma etc. <strong>for</strong> cast<strong>in</strong>g of foundation<br />

will have to be brought by the contractor at his<br />

own cost.<br />

28. Excavation and cast<strong>in</strong>g of shunt signal<br />

foundation as per Drg.No.RST-11173 with<br />

Contractor's own material <strong>in</strong>clud<strong>in</strong>g cement<br />

and Anchor bolts of standard Size. The<br />

required scaffold<strong>in</strong>g, Ferma etc. <strong>for</strong> cast<strong>in</strong>g of<br />

foundation will have to be brought by the<br />

Contractor at his own cost.<br />

29. Erection of CLS Post with Surface base and<br />

signal unit on top or on OFF set bracket, fix<strong>in</strong>g<br />

of front and back stag<strong>in</strong>g, ladder and guards,<br />

signal name plates / boards if any with<br />

contractors own brackets and fix<strong>in</strong>g materials.<br />

This also <strong>in</strong>cludes erection of auxiliary signals<br />

like call<strong>in</strong>g on, shunt signal if any. The work<br />

shall be done as per <strong>in</strong>structions of Railway<br />

Eng<strong>in</strong>eer at site.<br />

30. Erection of shunt signal with Surface base,<br />

post, signal unit and fix<strong>in</strong>g of No. plates. The<br />

work shall be done as per <strong>in</strong>structions of<br />

Railway Eng<strong>in</strong>eer at site.<br />

Nos. 2 69449.00 138898.00<br />

Nos. 29 5426.71 157374.59<br />

Nos. 11 1697.71 18674.81<br />

Nos. 29 2067.90 59969.10<br />

Nos. 18 302.39 5443.02<br />

Signature of contractor Page 20 of 127 Dy CSTE/IRPMU/Kanpur


31. Term<strong>in</strong>ation of tail cable on Ma<strong>in</strong> signal units<br />

and wir<strong>in</strong>g with contractor own material, fix<strong>in</strong>g<br />

of LED units etc. The work shall be done as per<br />

<strong>in</strong>structions of Railway Eng<strong>in</strong>eer at site.<br />

32. Term<strong>in</strong>ation of tail cable on shunt signal units<br />

and wir<strong>in</strong>g with contractor's own materials.<br />

fix<strong>in</strong>g of LED units etc. The work shall be done<br />

as per <strong>in</strong>structions of Railway Eng<strong>in</strong>eer at site.<br />

33. Installation, erection and wir<strong>in</strong>g of call<strong>in</strong>g on<br />

signal / shunt signal on the same post below<br />

ma<strong>in</strong> signal on offset bracket which also<br />

<strong>in</strong>cludes <strong>in</strong>stallation of LED lamp unit, its<br />

wir<strong>in</strong>g etc. Offset brackets, call<strong>in</strong>g on signal /<br />

shunt signal complete will be supplied by<br />

Railways or covered under supply. “U” bolt <strong>for</strong><br />

offset bracket and wire and wir<strong>in</strong>g material will<br />

be supplied by contractor.<br />

34. Fix<strong>in</strong>g of Junction Route Indication 1-Way/2-<br />

Way/3-Way on the top of the signal post.<br />

35. Supply and <strong>in</strong>stallation of LED signal Light<strong>in</strong>g<br />

unit <strong>for</strong> Illum<strong>in</strong>ated 'A / AG Marker' emitt<strong>in</strong>g<br />

white light. All material required <strong>for</strong> the job<br />

such as LED signal unit, MS angle, nuts and<br />

bolts, fixtures etc. will be supplied by the<br />

contractor.<br />

36. Fix<strong>in</strong>g of stop board / Call<strong>in</strong>g on board / block<br />

section limit board / goods warn<strong>in</strong>g board with<br />

contractors own materials as per <strong>in</strong>structions of<br />

site Eng<strong>in</strong>eer.<br />

37. Dismantl<strong>in</strong>g (one side) of exist<strong>in</strong>g lift<strong>in</strong>g<br />

barrier assembly (<strong>in</strong>clud<strong>in</strong>g its correspond<strong>in</strong>g<br />

road signal) and its <strong>in</strong>stallation at new location<br />

beyond Third l<strong>in</strong>e. The work will <strong>in</strong>volve<br />

excavation & cast<strong>in</strong>g of pedestal foundation &<br />

boom lock<strong>in</strong>g arrangement <strong>for</strong> boom of lift<strong>in</strong>g<br />

barrier and road signal with contractor's own<br />

material <strong>in</strong>clud<strong>in</strong>g cement & anchor bolts,<br />

erection of the complete lift<strong>in</strong>g barrier<br />

assembly <strong>in</strong>clud<strong>in</strong>g boom support, boom<br />

lock<strong>in</strong>g devices etc as per <strong>in</strong>structions of site<br />

eng<strong>in</strong>eer; test<strong>in</strong>g and commission<strong>in</strong>g thereof<br />

the LC gate.<br />

Nos. 29 649.52 18836.08<br />

Nos. 18 223.74 4027.32<br />

Nos. 9 460.96 4148.64<br />

Nos. 13 471.89 6134.57<br />

Nos. 18 11026.90 198484.20<br />

NO 4 343.07 1372.28<br />

Set 3 28438.61 85315.83<br />

Signature of contractor Page 21 of 127 Dy CSTE/IRPMU/Kanpur


38. Pa<strong>in</strong>t<strong>in</strong>g two coats of enamel pa<strong>in</strong>t over one<br />

coat of Red Oxide primer on the follow<strong>in</strong>g<br />

items after scrapp<strong>in</strong>g and clean<strong>in</strong>g of the<br />

surface wherever necessary. Primer and pa<strong>in</strong>ts<br />

both Asian pa<strong>in</strong>ts make are to be supplied by<br />

contractor.<br />

(i)<br />

Location boxes <strong>in</strong>side and outside surfaces with<br />

Alum<strong>in</strong>um pa<strong>in</strong>t.<br />

a) S<strong>in</strong>gle case NO 62 437.39 27118.18<br />

b) Half case (post box type) NO 93 345.62 32142.66<br />

(ii)<br />

Ma<strong>in</strong> signal post, signal unit, surface base and<br />

complete fitt<strong>in</strong>g as per N C Railway’s standard<br />

practice.<br />

NO 29 524.04 15197.16<br />

(iii) Shunt signal post with signal unit surface base. NO 18 241.33 4343.94<br />

(iv) Po<strong>in</strong>t mach<strong>in</strong>e with ground connections<br />

complete (po<strong>in</strong>t mach<strong>in</strong>e with black enamel<br />

only outside and ground connection with Red<br />

oxide).<br />

39. Letter<strong>in</strong>g / number<strong>in</strong>g of signals, po<strong>in</strong>t<br />

mach<strong>in</strong>e, track lead junction boxes, block<br />

jo<strong>in</strong>ts, apparatus cases etc. (each item to be<br />

taken as one unit). This work will be carried<br />

out as per the standard practice be<strong>in</strong>g followed<br />

<strong>in</strong> N C Railway.<br />

NO. 22 170.66 3754.52<br />

NO 450 45.92 20664.00<br />

40. Letter<strong>in</strong>g / number<strong>in</strong>g term<strong>in</strong>ation particulars<br />

equipment names etc. legibly and neatly <strong>in</strong>side<br />

location boxes.<br />

a) S<strong>in</strong>gle case NO 62 206.86 12825.32<br />

b) Half case (post box type) NO 93 131.01 12183.93<br />

Signature of contractor Page 22 of 127 Dy CSTE/IRPMU/Kanpur


41. Installation of earth electrode, earth<strong>in</strong>g of S&T<br />

apparatus cases, signal post etc. as per standard<br />

practice. The item <strong>in</strong>cludes digg<strong>in</strong>g of pit <strong>in</strong><br />

earth, 3 meters. and fix<strong>in</strong>g earth electrodes<br />

pipe, cast<strong>in</strong>g of cement concrete enclosures as<br />

per Drg. No. RE/ S&T/ SIG/<br />

<strong>TENDER</strong>/SK/13/85 and the soil treatment. The<br />

item <strong>in</strong>cludes provision of earth lead, wires and<br />

solder<strong>in</strong>g of lead wires. The other end of earth<br />

wire/flat to be connected to the cable armour,<br />

Apparatus case etc. as per Drg. No. CORE<br />

/S&T /ALD/ SK / 372/93 and Signal Post as<br />

per Drg. No. CORE/S&T/ ALD/SK/371/93.<br />

All material (except earth electrode) such as<br />

cement, wir<strong>in</strong>g material, solder<strong>in</strong>g material etc.<br />

to be supplied by the contractor.<br />

42. Supply and <strong>in</strong>stallation of prefabricated shelters<br />

of size 6m*4m and height 3m to house<br />

signall<strong>in</strong>g equipment (IPS, battery set, SSI,<br />

AFTC etc.) of automatic section. This will<br />

<strong>in</strong>clude all electrical wir<strong>in</strong>g/earth<strong>in</strong>g<br />

arrangements and fitt<strong>in</strong>gs, cast<strong>in</strong>g of<br />

foundations, load<strong>in</strong>g, unload<strong>in</strong>g of shelters and<br />

their erection at site.<br />

43 Releas<strong>in</strong>g of old location boxes, signal posts,<br />

equipment <strong>in</strong>side the location boxes, <strong>in</strong>clud<strong>in</strong>g<br />

the break<strong>in</strong>g of foundation as per the<br />

<strong>in</strong>structions of Eng<strong>in</strong>eer <strong>in</strong>-charge and their<br />

transportation to Central Stores at Jhansi.<br />

Nos. 54 655.05 35372.70<br />

Nos. 3 693600 2080800<br />

LOT 1 36774.63 36774.63<br />

44. Load<strong>in</strong>g, transportation and unload<strong>in</strong>g of<br />

signall<strong>in</strong>g materials from any station to<br />

SSE/IRPMU depot at Kanpur<br />

Per<br />

tonn<br />

e-<br />

Km<br />

17500 5.51 96425<br />

TOTAL or Schedule 'A' 97,60,056.<br />

03<br />

Signature of contractor Page 23 of 127 Dy CSTE/IRPMU/Kanpur


SCHEDULE 'B'<br />

Sr.<br />

No.<br />

Description Unit Qty. Rate Amount<br />

1. Supply of RCC pipes 150mm dia 2mtr long<br />

with collars as per spec IS/458/1971<br />

2. Supply of GI pipe 100mm dia B class as per<br />

spec. No. IS 1239 PT.1/1990<br />

Mtr. 120 347.14 41656.80<br />

Mtr. 50 709.19 35459.50<br />

3. Supply of Double Walled Corrugated pipes<br />

(Elect REX/ TeleRex or similar) <strong>for</strong> under<br />

ground communication/ signal cable protection<br />

120 mm Outer Dia, 103.5 mm Inner Dia <strong>in</strong> 6<br />

Meter straight length as per British Std. No.<br />

BSEN 50086-1 & BSEN 50086 2,4 & BIS<br />

draft specn. DOC HQ LTD 14 (5071) & ETD<br />

(5072) to specn. IS14930 part II. NOTE: One<br />

coupler <strong>for</strong> jo<strong>in</strong>t<strong>in</strong>g shall be supplied with each<br />

6 mtrs. length INSPECTION BY RITES.<br />

P.<br />

Mtr.<br />

1080 221.11 238798.80<br />

4. Supply of apparatus case steel S<strong>in</strong>gle steel RE<br />

type fitted with lock ‘E’ type lock and Key<br />

ward No. 42, as per Drg. No. RE / S & T / AID<br />

/ SK / 219 / 82 with Alt ‘A’ & 221 / 82 with<br />

Alt. ‘B’. The key and handle should be at the<br />

rate of one each per 4 Nos. apparatus case.<br />

5. Supply of apparatus case Half steel RE Type<br />

fitted with ‘E’ type lock and key ward No. 42<br />

and handle s<strong>in</strong>gle as per Drg. No. RE / S & T /<br />

AID / SK / 220 / 82 with Alt ‘B’ & 221 / 82<br />

with Alt. ‘B’. The key and handle should be at<br />

the rate of one each per 4 Nos. apparatus case.<br />

6. Supply of Hylum sheet (Bakelite <strong>in</strong>dustrial<br />

lam<strong>in</strong>ated paper based sheet), res<strong>in</strong> bonded 10<br />

mm thick grade p3 <strong>in</strong> standard size of 1.22 x<br />

1.22 mtr. as per spec. No. IS 2036 of 1974<br />

Nos. 62 10502.22 651137.64<br />

Nos. 93 8386.86 779977.98<br />

Nos. 60 3464.58 207874.80<br />

Signature of contractor Page 24 of 127 Dy CSTE/IRPMU/Kanpur


7. Supply of ARA term<strong>in</strong>al Block (M6) without<br />

disconnect<strong>in</strong>g l<strong>in</strong>ks as per Drg. No. SA 23741A<br />

(Alt-4) and Spec. No. IRS S 75/91 (Amdt-2)<br />

with latest amendments.<br />

8. Supply of <strong>in</strong>sulated disconnect<strong>in</strong>g l<strong>in</strong>k <strong>for</strong> ARA<br />

term<strong>in</strong>al block as per Drg. no. RST /11336<br />

9. Supply of cartridge fuse block made of PBT as<br />

per RDSO Drg. No. SA-23748 Alt.4 and Spec.<br />

No. IRS S 75/91 (Amdt. - 2)with latest<br />

amendment. Fuse block shall be suitable <strong>for</strong><br />

round head type voltage fuses.<br />

10. Supply of non deteriorat<strong>in</strong>g type low voltage<br />

cartridge fuse rates current 2A round head type<br />

as per spec. No. IRS: S- 78/92 with latest<br />

amendments.<br />

Nos. 13515 65.81 889422.15<br />

Nos. 10000 10.85 108500.00<br />

Nos. 120 107.12 12854.40<br />

Nos. 20 62.38 1247.60<br />

11. Supply of relays non AC immune plug <strong>in</strong> type<br />

metal to carbon.<br />

a) Track relay QTA2 9 ohms 2F/1B complete<br />

with plug- board, reta<strong>in</strong><strong>in</strong>g clip and connectors<br />

con<strong>for</strong>m<strong>in</strong>g to BRS: 939A, BRS: 966<br />

(Appendix F2), IRS S34 & IRS: S23 (as<br />

applicable).<br />

b) Relay Tw<strong>in</strong> DC Neutral l<strong>in</strong>e QNNA1 24V<br />

6F/2B complete with plug- board, reta<strong>in</strong><strong>in</strong>g clip<br />

and connectors con<strong>for</strong>m<strong>in</strong>g to BRS:960,<br />

IRS:S60, IRS: S34 & IRS: S23 (as applicable).<br />

Nos. 142 2342.00 332564.00<br />

Nos. 38 3402.00 129276.00<br />

c )<br />

Relay DC Neutral l<strong>in</strong>e QSPA1 slow to pick up,<br />

24V 8F/4B complete with plug- board,<br />

reta<strong>in</strong><strong>in</strong>g clip and connectors con<strong>for</strong>m<strong>in</strong>g to<br />

BRS:933A, IRS: S60, IRS S34 & IRS: S23 (as<br />

applicable).<br />

Nos. 142 3094.00 439348.00<br />

12. Supply of Track Feed battery Charger 110 - 70<br />

V / 2 - 4 - 6 Volt DC. as per IRS specification<br />

No. IRS-S-89-93 with latest amendment.<br />

Nos. 117 1522.79 178166.43<br />

Signature of contractor Page 25 of 127 Dy CSTE/IRPMU/Kanpur


13. Supply of Choke 'B' Type to suit specn. No. -<br />

IRS - S - 65 / 83 with latest amendment.<br />

14. Supply of DISC type Track feed resistance to<br />

suit RDSO Drg. no. SA-2016/M (Adv) to SA<br />

20166 / M (Adv) Alt -1.<br />

15. Supply of Low ma<strong>in</strong>tenance Lead Acid<br />

Secondary Cells 2V 40 AH as per Spec. RDSO<br />

IRS: S- 88/93 with latest amendments.<br />

16. Supply of earth electrode assembly without<br />

enclosure as per Drg. No RE / S&T / SIG /<br />

<strong>TENDER</strong> /SK/398/85<br />

17. Supply (&Test<strong>in</strong>g) of weld<strong>in</strong>g tools suitable <strong>for</strong><br />

jo<strong>in</strong>t of cable size 3/16 useful on rail web <strong>for</strong><br />

TLJB boot leg applications.<br />

18. Supply (& Test<strong>in</strong>g) of Weld<strong>in</strong>g tools suitable<br />

<strong>for</strong> rail head useful <strong>for</strong> rail head weld<strong>in</strong>g<br />

MODEL TIR 6.<br />

19. Supply (& Test<strong>in</strong>g) of Hammer die <strong>for</strong> 3/16<br />

cable.<br />

20. Supply (& Test<strong>in</strong>g) of Exothermic weld<br />

powder <strong>for</strong> weld<strong>in</strong>g 25 gram each.<br />

21. Supply of copper sleeve <strong>for</strong> 3/16 cable <strong>for</strong><br />

Exothermic weld.<br />

22. Supply (& Test<strong>in</strong>g) of graphite mould <strong>for</strong><br />

replac<strong>in</strong>g suitable jo<strong>in</strong>t of cable size 3/16 on<br />

rail web <strong>for</strong> boot leg application mold. It<br />

should be <strong>in</strong> pair LH & RH.<br />

23. Supply of Heavy Duty Gr<strong>in</strong>der Mach<strong>in</strong>e with<br />

Battery.<br />

24. Supply of tongue attachment <strong>in</strong>sulation set<br />

consist<strong>in</strong>g of one <strong>in</strong>sulat<strong>in</strong>g plate and 3 nos. of<br />

Ferrules with collars to suite rodd<strong>in</strong>g supplied<br />

as per RDSO spec. and drg.<br />

Nos. 184 2470.63 454595.92<br />

Nos. 117 861.06 100744.02<br />

Nos. 260 872.06 226735.60<br />

Nos. 54 724 39096<br />

Nos. 1 35753.20 35753.20<br />

Nos. 1 38307.00 38307.00<br />

Nos. 2 2170.73 4341.46<br />

Nos. 172 178.77 30748.44<br />

Nos. 172 11.49 1976.28<br />

Pair 2 11420.91 22841.82<br />

Nos. 1 18589.11 18589.11<br />

SET 10 229.75 2297.50<br />

Signature of contractor Page 26 of 127 Dy CSTE/IRPMU/Kanpur


25. Gauge tie plate <strong>in</strong>sulation as per RDSO drg. no.<br />

T-10372/ Alt. 2, T-10371/Alt.2, T-10368/Alt.<br />

T-15083/88/Alt.2 and T-11690/Alt.2 and to<br />

IRS S-23 and S40.<br />

26. Supply of William stretcher <strong>in</strong>sulation set<br />

suitable <strong>for</strong> ground connection as per RDSO<br />

Drg. no. T-10367, T10368, T-10384 and the<br />

spec IRS S 23 and 40 with latest amendments.<br />

27. Supply of GI bend pipe, B class 40mm dia <strong>for</strong><br />

cable entry <strong>in</strong> po<strong>in</strong>t mach<strong>in</strong>es as per Drg. No.<br />

SUR/N/STD/26.<br />

28. Supply of Ma<strong>in</strong> Signal post 140 mm outer dia<br />

4.5m length as per RDSO spec No. IRS S6/81<br />

with latest amendments.<br />

a) Supply of CLS Unit 2 aspect as per RDSO Drg.<br />

No. SA23003 A/M (Adv.) & Spec. No. S26/64<br />

b) Supply of CLS Unit 3 aspect as per RDSO Drg.<br />

No. SA23002 A/M (Adv.) & Spec. No. S26/64<br />

c) Supply of CLS Unit 4 aspect as per RDSO Drg.<br />

No. SA23001 A/M (Adv.) & Spec. No. S26/64<br />

29. Supply of cast iron ma<strong>in</strong> signal surface base<br />

140 mm as per spec. no. IRS S10 and Drg no.<br />

and Drg. No. 2011/M with latest amendments.<br />

30. Supply of CLS Ladder assembly complete <strong>for</strong><br />

CLS signal 5.5 m long as per RDSO Drg. No.<br />

SA-23156(Adv.) Alt.-1.<br />

31. Supply of signal front stag<strong>in</strong>g complete<br />

assembly <strong>for</strong> CLS signal as per Drg. No.<br />

RST/11413.<br />

32. Supply of Signal Number Plates as per Drg.<br />

supplied by Dy CSTE/IRPMU/CNB and<br />

already provided on Up and Dn l<strong>in</strong>es <strong>in</strong> PNK-<br />

BPU section and at Bhaupur station.<br />

SET 62 165.49 10260.38<br />

SET 31 361.69 11212.39<br />

Nos. 31 2524.35 78254.85<br />

Nos. 29 4474.80 129769.20<br />

Nos. 3 13473.22 40419.65<br />

Nos. 0 18680.26 0.00<br />

Nos. 26 18680.26 485686.76<br />

Nos. 29 2023.15 58671.35<br />

Nos. 29 3857.82 111876.78<br />

Nos. 29 1097.00 31813.00<br />

Nos. 29 340.36 9870.44<br />

Signature of contractor Page 27 of 127 Dy CSTE/IRPMU/Kanpur


33. Supply of Stop board, Call<strong>in</strong>g on board as per<br />

Drg. no. 7235/B, Block section limit board,<br />

Goods warn<strong>in</strong>g board as per Drg. no. SA-2380)<br />

with retrorefractive sheets as per <strong>in</strong>structions of<br />

site Eng<strong>in</strong>eer.<br />

a) Supply of 1 way junction route <strong>in</strong>dicator spec.<br />

no. IRS: S66/84 Amdt-1 & Drg No. SA<br />

23401(Adv) 4.<br />

b) Supply of 2 way junction route <strong>in</strong>dicator spec.<br />

no. IRS: S66/84 Amdt-1 & Drg No. SA<br />

23402(Adv) 4<br />

c) Supply of 4 way junction route <strong>in</strong>dicator spec.<br />

no. IRS: S66/84 Amdt-1 & Drg No. SA<br />

23404(Adv) 4.<br />

34. Supply of A/AG/C/P/G Board as per RDSO<br />

Drg. No. SA 23455-56 RST-11445 and SA<br />

23476-77 as applicable.<br />

35. Supply of signal call<strong>in</strong>g on colour light signal<br />

type with white lense, lamp holder and lock<br />

Drg. No. S-2748 / M. Spec. No. IRS – S. 23 /<br />

88.<br />

36. Supply of position light shunt signal Unit as per<br />

RDSO No. SA 23840(Adv.) or latest.<br />

37. Supply of Shunt signal post (GI pipe of 80 mm<br />

dia)<br />

Nos. 4 2198.08 8792.32<br />

Nos. 9 15500.44 139503.96<br />

Nos. 3 20380.68 61142.04<br />

Nos. 1 2038.07 2038.07<br />

Nos. 18 372.90 6712.20<br />

Nos. 5 4788.38 23941.90<br />

Nos. 18 6397.61 115156.98<br />

Nos. 11 1833.31 20166.41<br />

38. Supply of handcuff locks. Nos. 85 187.13 15906.05<br />

39. Supply of digital multimeter ‘Fluke 85-<br />

II/Tektronix TX3’ or similar make RDSO<br />

approved suitable <strong>for</strong> measur<strong>in</strong>g Digital axle<br />

counter parameters.<br />

Nos. 4 20502.83 82011.32<br />

Signature of contractor Page 28 of 127 Dy CSTE/IRPMU/Kanpur


40. Supply of auto range digital Insulation tester<br />

(Megger) with NiCd rechargeable cells as per<br />

spec. Voltage range 100 to 500V DC <strong>in</strong>sulation<br />

range 200 to 2000M ohms resolution 0.1 M<br />

ohm accuracy +/- 1% make Electron devices<br />

model no. DIT/500 or similar.<br />

41. Supply of portable 110V (13mm to 23mm) drill<br />

mach<strong>in</strong>e (horizontal) of Wolf make or similar.<br />

42. Supply of multi-utility Pr<strong>in</strong>ter HP J5508 or<br />

similar.<br />

Nos. 4 6590.19 26360.76<br />

Nos. 2 14762.03 29524.06<br />

1 10350.00 10350.00<br />

43.<br />

Supply of Ma<strong>in</strong>tenance kit: Each kit consists<br />

<strong>for</strong> item No. 1 to 11 as per list below: -<br />

P /<br />

set<br />

3 2450.23 7350.69<br />

i) Spanner D/E 30x32 mm =1No<br />

ii) Spanner D/E 18x19 mm =1No<br />

iii) Spanner comb<strong>in</strong>ation R<strong>in</strong>g and open end 19<br />

mm =1No<br />

iv) Spanner open end 50mm = 2 No<br />

v) Spanner comb<strong>in</strong>ation r<strong>in</strong>g and open end<br />

30mm = 1No.<br />

vi)Spanner comb<strong>in</strong>ation R<strong>in</strong>g and open end<br />

40mm=2 Nos.<br />

vii) Handle extension =1No<br />

viii) ‘L’ Handle =1No.<br />

ix) Box 30 and 19mm =1No.<br />

x) Cutter 4” cum stripp<strong>in</strong>g =1No.<br />

xi) Screwdriver 6” = 2 No.<br />

xii) Adjustable Wrench 375 mm = 1 No.<br />

xiii) Hammer Ball pan 1 ½ lb =1No.<br />

TOTAL <strong>for</strong> Schedule 'B' 65,39,102.<br />

01<br />

Signature of contractor Page 29 of 127 Dy CSTE/IRPMU/Kanpur


Sub Total <strong>for</strong> Schedule 'A' Rs. 97,60,056.03<br />

Sub Total <strong>for</strong> Schedule 'B' Rs. 65,39,102.01<br />

GRAND TOTAL<br />

(Schedule ‘A’+ Schedule ‘B’ + Schedule ‘C’)<br />

Rs. 1,62,99,158.04<br />

*****<br />

Signature of contractor Page 30 of 127 Dy CSTE/IRPMU/Kanpur


OFFER LETTER<br />

To<br />

The President of India,<br />

Act<strong>in</strong>g through Chief Adm<strong>in</strong>istrative Officer/ (or his successor),<br />

IRPMU, N C Railway,<br />

Shivaji Bridge, (IRCOT Complex), New Delhi.<br />

Name of Work: Design, Manufacture, Supply, Installation, Test<strong>in</strong>g and Commission<strong>in</strong>g<br />

of new Solid State (Electronic) Interlock<strong>in</strong>g System and Alteration to exist<strong>in</strong>g Solid State<br />

(Electronic) Interlock<strong>in</strong>g system con<strong>for</strong>m<strong>in</strong>g to RDSO Specification No. – RDSO/SPN/<br />

192/2005 with latest amendments <strong>in</strong> connection with ‘Provision of automatic signall<strong>in</strong>g<br />

on new 3rd l<strong>in</strong>e and bi-directional signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e<br />

<strong>in</strong> Panki-Bhaupur section and at Panki & Bhaupur stations on Kanpur-Etawah section of<br />

Allahabad division of North Central Railway’.<br />

Sir, I/We …………………………… have read various conditions to tender hereto<br />

attached and hereby agree to abide by the said conditions. I/We also agree to keep this<br />

Tender open <strong>for</strong> acceptance <strong>for</strong> a period of 120 days from the date fixed <strong>for</strong> open<strong>in</strong>g the<br />

same and <strong>in</strong> default thereof, I / We will be liable <strong>for</strong> <strong>for</strong>feiture of my/our Security<br />

Deposit. I / We offer to do this work as detailed below at the rates quoted below:<br />

S.<br />

No<br />

Schedule Approximate Cost of<br />

Schedule<br />

Rates quoted by the tenderer (% Above/<br />

Below/At Par) (Both <strong>in</strong> figures and Words)<br />

1. Schedule<br />

‘A’<br />

Rs. 97,60,056.03<br />

(Rupees N<strong>in</strong>ety Seven<br />

lakhs Sixty thousand and<br />

Fifty Six and three paise<br />

only)<br />

In Figure<br />

In Words<br />

ABOVE<br />

/<br />

BELOW<br />

2. Schedule<br />

‘B’<br />

Rs.65,39,102.01<br />

(Rupees Sixty Five lakhs<br />

Thirty N<strong>in</strong>e thousands<br />

One hundred and Two<br />

and One paise only)<br />

In Figures<br />

In Words<br />

ABOVE<br />

/<br />

BELOW<br />

3. TOTAL Rs. 1,62,99,158.04 (Rupees<br />

One Crore Sixty Two<br />

thousands N<strong>in</strong>ety N<strong>in</strong>e<br />

thousands One hundred<br />

and Fifty Eight and Four<br />

paise only)<br />

In Figures<br />

In Words<br />

ABOVE<br />

/<br />

BELOW<br />

Signature of contractor Page 31 of 127 Dy CSTE/IRPMU/Kanpur


I/We hereby b<strong>in</strong>d myself/ourselves to complete the work with<strong>in</strong> the time limits specified<br />

<strong>in</strong> the conditions of Tender. I/We also hereby agree to abide by the General conditions of<br />

Contract with latest amendments and special conditions of Contract and to carry out the<br />

works accord<strong>in</strong>g to the specifications of materials and works laid down by the Railway<br />

<strong>for</strong> present contract.<br />

I/We declare that I/We have gone through the Rules, Regulations of. Tender and Contract<br />

General Conditions, Special conditions, specifications and other particulars embodied <strong>in</strong><br />

Volume-2 and have fully understood and agree to abide by them.<br />

Until a <strong>for</strong>mal agreement is prepared and executed, acceptance of this Tender shall<br />

constitute, subject to modifications as may be mutually agreed to, a b<strong>in</strong>d<strong>in</strong>g contract,<br />

between us and the President of India act<strong>in</strong>g through the Chief Signal &<br />

Telecommunication Eng<strong>in</strong>eer (Construction), North Central Railway, Allahabad or the<br />

authority as <strong>in</strong>dicated <strong>in</strong> the letter of acceptance of my/our offer <strong>for</strong> this work.<br />

SIGNATURE OF <strong>TENDER</strong>ER [S]<br />

(Please affix your Seal also, if any)<br />

Contractor's Address:<br />

Date:<br />

Signature of contractor Page 32 of 127 Dy CSTE/IRPMU/Kanpur


Section – II<br />

Chapter – 1<br />

Instructions to Tenderer<br />

&<br />

Conditions of Tender<strong>in</strong>g<br />

Signature of contractor Page 33 of 127 Dy CSTE/IRPMU/Kanpur


INDEX<br />

1. GENERAL INSTRUCTIONS<br />

2. INTERPRETATIONS<br />

3. LOCAL CONDITIONS<br />

4. COMPLIANCE TO <strong>TENDER</strong> CONDITIONS, TECHNICAL SPECIFICATION &<br />

DRAWINGS<br />

5. EARNEST MONEY/BID GUARANTEE<br />

6. SUBMISSION OF OFFERS<br />

7. CONSTITUTION OF FIRM & POWER OF ATTORNEY<br />

8. UNIT PRICES<br />

9. VALIDITY OF OFFER<br />

10. RATES DURING NEGOTIATION<br />

11. INCOME TAX CLEARANCE CERTIFICATE<br />

12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH<br />

13. OPENING OF <strong>TENDER</strong><br />

14. NON-TRANSFERABILITY & NON-REFUNDABILITY<br />

15. ERRORS OMISSIONS & DISCREPANCIES<br />

16. WRONG INFORMATION BY <strong>TENDER</strong>ER<br />

17. CONSORTIUM BIDS<br />

18. QUALIFICATION CRITERIA<br />

19 DETERMINATION OF RESPONSIVENESS<br />

20. CORRECTION OF ERRORS<br />

21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES<br />

22. SYSTEM PERFORMANCE GUARANTEE<br />

23. AUTHORITY FOR ACCEPTANCE<br />

24. PURCHASE PREFERENCE<br />

25. AGREEMENT<br />

26. <strong>TENDER</strong>ER'S ADDRESS<br />

27. FOREIGN EXCHANGE<br />

Signature of contractor Page 34 of 127 Dy CSTE/IRPMU/Kanpur


Instructions to Tenderer & Conditions of Tender<strong>in</strong>g<br />

1 GENERAL INSTRUCTIONS<br />

1.1 Tenders are <strong>in</strong>vited on behalf of President of India act<strong>in</strong>g through Chief<br />

Adm<strong>in</strong>istrative Officer/IRPMU, Shivaji Bridge, New Delhi 110001 from<br />

established and reliable contractors <strong>for</strong> the work:<br />

Indoor and Outdoor signall<strong>in</strong>g works consist<strong>in</strong>g of trench<strong>in</strong>g, cable lay<strong>in</strong>g,<br />

term<strong>in</strong>ation of cables, cast<strong>in</strong>g of foundations, erection of signals & locations,<br />

relay and power supply wir<strong>in</strong>g, track circuit<strong>in</strong>g work, po<strong>in</strong>t mach<strong>in</strong>e work etc.,<br />

and their test<strong>in</strong>g & commission<strong>in</strong>g <strong>in</strong> connection of Provision of EI based<br />

automatic signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bi-directional signall<strong>in</strong>g on exist<strong>in</strong>g<br />

automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong> Panki-Bhaupur section and at Panki &<br />

Bhaupur stations on Kanpur-Etawah section of Allahabad division of North<br />

Central Railway. as given <strong>in</strong> the Preamble.<br />

1.2 The Preamble, Schedule of requirement of quantities, General Conditions of<br />

contract, Special Conditions of Contract, Instructions to tenderers and conditions<br />

of tender<strong>in</strong>g, Technical Specifications & Installation practices, all Annexure &<br />

Forms etc. shall, hereafter, be collectively referred to as the "Tender papers".<br />

Any clarifications required by the tenderer may be obta<strong>in</strong>ed from the Deputy<br />

Chief Signal & Telecommunication Eng<strong>in</strong>eer/Old Microwave bu1ld<strong>in</strong>g, North<br />

Central Railway, Juhi, Kanpur- 208014<br />

2. INTERPRETATIONS<br />

The follow<strong>in</strong>g terms wherever occurr<strong>in</strong>g <strong>in</strong> the tender papers and wherever used<br />

throughout the execution of the work, shall, unless excluded by or repugnant to<br />

the context, have the mean<strong>in</strong>g attributed there to as follows: -<br />

"CONTRACT" Means the Agreement or Work Order result<strong>in</strong>g from the<br />

acceptance by the Purchaser of this tender either <strong>in</strong> whole or <strong>in</strong> part.<br />

"CONTRACTOR” Means the successful Tenderer, i.e., the Tenderer whose<br />

Tender has been accepted either <strong>in</strong> whole or <strong>in</strong> part.<br />

“CONTRACTOR’S REPRESENTATIVE” Shall mean a person <strong>in</strong> supervisory<br />

capacity who shall be so declared by the contractor and who shall be authorised<br />

under a duly executed power of attorney to receive materials issued by the<br />

Purchaser to the Contractor <strong>for</strong> the works. He shall be responsible <strong>for</strong> proper<br />

execution of works at each or all places and shall take orders from Purchaser's<br />

Eng<strong>in</strong>eers and carry out the same.<br />

Signature of contractor Page 35 of 127 Dy CSTE/IRPMU/Kanpur


"ENGINEER" shall mean the Divisional Eng<strong>in</strong>eer/Divisional Electrical<br />

Eng<strong>in</strong>eer/Divisional Signal & Telecom. Eng<strong>in</strong>eer or the Assistant Eng<strong>in</strong>eers <strong>in</strong><br />

executive charge of the Railway works and shall <strong>in</strong>clude the superior officers of<br />

the Railway. He is responsible <strong>for</strong> ensur<strong>in</strong>g that all field works covered by the<br />

contract are carried out <strong>in</strong> accordance with approved designs, draw<strong>in</strong>gs and<br />

specifications and conditions of contract as agreed to.<br />

“ENGINEER’S REPRESENTATIVE" Shall mean the Sr. Section Eng<strong>in</strong>eers/<br />

Section Eng<strong>in</strong>eers <strong>in</strong> direct charge of the works of Signal &<br />

Telecom./Civil/Electrical Eng<strong>in</strong>eer<strong>in</strong>g department of Railway.<br />

"EQUIPMENT” Means all or any equipment considered necessary by the<br />

Purchaser's Eng<strong>in</strong>eers <strong>for</strong> the satisfactory operation, as a whole, of the <strong>in</strong>stallations.<br />

“GENERAL MANAGER" Means the officer <strong>in</strong> Adm<strong>in</strong>istrative charge of this<br />

Railway and shall mean and <strong>in</strong>clude the officers to whom the functions are<br />

delegated. His postal address shall be <strong>in</strong>timated to the successful Tenderers <strong>in</strong> due<br />

course.<br />

"MONTH” Means One English Calendar Month.<br />

"MATERIALS” Means all equipment, components, fitt<strong>in</strong>gs and other materials<br />

<strong>in</strong>clud<strong>in</strong>g raw materials required to complete the work.<br />

"PURCHASER” Means the President of India act<strong>in</strong>g through his accredited<br />

officers or any one of them. The Chief Project Manager / IRPMU, North Central<br />

Railway New Delhi shall be deemed to be one of such accredited officers.<br />

Subject as otherwise provided <strong>in</strong> this contract, all notices to be given and all other<br />

action to be taken on behalf of President of India may be given or taken on his<br />

behalf by General Manager, North Central Railway Allahabad/ Chief<br />

Adm<strong>in</strong>istrative Officer, North Central Railway New Delhi or any other<br />

representative of the North Central Railway Adm<strong>in</strong>istration nom<strong>in</strong>ated by him.<br />

“PURCHASER’S ENGINEERS" Means the Chief Adm<strong>in</strong>istrative Officer /<br />

IRPMU North Central Railway or successor who will decide all matters<br />

relat<strong>in</strong>g to survey, design, manufacture, <strong>in</strong>stallation and commission<strong>in</strong>g of the<br />

plant and equipment at site.<br />

"RAILWAY” Shall mean the President of the Republic of India or the<br />

Adm<strong>in</strong>istrative Officers of the Railway or of the successor Railway authorised to<br />

deal with any matters with which these present are concerned on his behalf.<br />

"SUB-CONTRACTOR"<br />

Means an <strong>in</strong>dividual or a firm of Contractor or a<br />

Signature of contractor Page 36 of 127 Dy CSTE/IRPMU/Kanpur


Company registered under Indian Company Act or an approved supplier of<br />

materials to whom the Contractor sublets portions of the contract after obta<strong>in</strong><strong>in</strong>g<br />

specific prior approval of the Purchaser <strong>in</strong> writ<strong>in</strong>g to sub-lett<strong>in</strong>g of contract.<br />

"SITE" Means the areas to be taken up <strong>for</strong> the execution of works, together<br />

with any other area or areas as shall be determ<strong>in</strong>ed by the Purchaser's<br />

Eng<strong>in</strong>eers, which may be placed at the disposal of the Contractor <strong>for</strong> the purpose<br />

of the contract and also such area or areas used <strong>for</strong> store yards, works yards or<br />

workshop <strong>in</strong> proximity of the works as the Purchaser' Eng<strong>in</strong>eers may have<br />

authorised as an extension of the site, irrespective of the terms and conditions<br />

under which they are occupied by the Contractor.<br />

"<strong>TENDER</strong>ER" Means and <strong>in</strong>cludes any firm of eng<strong>in</strong>eers or Contractors or any<br />

company or body, corporate or otherwise, who submit the Tender which has been<br />

<strong>in</strong>vited.<br />

“WORK OR WORKS" Means all or any of the items of the work <strong>for</strong> which<br />

the Tenderer/ Contractor has Tendered/contracted accord<strong>in</strong>g to the<br />

specifications, draw<strong>in</strong>gs and Annexure hereto annexed or to be implied there<br />

from, or <strong>in</strong>cidental thereto or to be hereafter specified or required <strong>in</strong> such<br />

explanatory <strong>in</strong>structions and draw<strong>in</strong>gs, be<strong>in</strong>g <strong>in</strong> con<strong>for</strong>mity with the orig<strong>in</strong>al<br />

specifications, draw<strong>in</strong>gs, Annexure and schedules, and also such <strong>in</strong>structions and<br />

draw<strong>in</strong>gs additional to the a<strong>for</strong>ementioned as may from time to time be issued by<br />

the Purchaser's Eng<strong>in</strong>eer dur<strong>in</strong>g the progress of the contracted work.<br />

"WRITING" Includes all matters written, typewritten or pr<strong>in</strong>ted either <strong>in</strong> whole<br />

or <strong>in</strong> part.<br />

3. LOCAL CONDITIONS<br />

3.1 It will be imperative <strong>for</strong> each tenderer to fully acqua<strong>in</strong>t himself with all the<br />

local conditions and factors which would have any effect on the per<strong>for</strong>mance of<br />

the contract and cost of the stores. The purchaser shall not enterta<strong>in</strong> any request<br />

<strong>for</strong> clarifications from the tenderer regard<strong>in</strong>g such local conditions. No request<br />

<strong>for</strong> the change of price or time schedule of delivery of stores shall be enterta<strong>in</strong>ed<br />

after the offer is accepted by the purchaser on account of any local condition or<br />

factor.<br />

3.2 In the event of the tenderer desir<strong>in</strong>g to have a field survey be<strong>for</strong>e furnish<strong>in</strong>g his<br />

quotations, he may apply to Railways <strong>for</strong> permission <strong>in</strong> this regard. Such<br />

permission will be given <strong>in</strong> writ<strong>in</strong>g by the Railways but the expenses <strong>in</strong> this<br />

regard will be borne by the tenderer completely.<br />

3. 3 The <strong>in</strong>tend<strong>in</strong>g tenderer is advised to study the tender papers carefully. Any<br />

Signature of contractor Page 37 of 127 Dy CSTE/IRPMU/Kanpur


submission of a quotation by the tenderer shall be deemed to have been done after<br />

a careful study and exam<strong>in</strong>ation of these documents with full understand<strong>in</strong>g of the<br />

implication thereof. These conditions and specifications shall be deemed to have<br />

been accepted unless otherwise, specifically commented upon by the Tenderer <strong>in</strong><br />

his quotation. Failure to adhere to anyone or all these <strong>in</strong>structions may render his<br />

offer liable to be ignored without any reference.<br />

3.4 Should a tenderer f<strong>in</strong>d discrepancies <strong>in</strong> or omission from the draw<strong>in</strong>g or any of<br />

the Tender papers or he has any doubt to their mean<strong>in</strong>g, he should at once notify<br />

the Railway who may send a written clarification to all tenderers.<br />

4. COMPLIANCE TO <strong>TENDER</strong> CONDITIONS, SPECIFICATION &<br />

DRAWINGS<br />

4.1 The tenderer shall <strong>in</strong>dicate paragraph by paragraph <strong>for</strong> each section and each<br />

clause and sub-clause of all annexure of technical specifications of the tender<br />

document that either his tender complies <strong>in</strong> every respect with the requirements of<br />

each clause and sub-clause or if not, precisely how they differ from the<br />

requirements of the tenderer. In later case, the tenderer shall enclose a separate<br />

statement as per pro-<strong>for</strong>ma given, <strong>in</strong>dicat<strong>in</strong>g only the deviations <strong>for</strong> any clause or<br />

sub-clause of General Conditions of Contract, Preamble, Instructions to tenderers<br />

and conditions of tender<strong>in</strong>g Special Conditions of Contract, Technical<br />

Specifications and Installation practices etc. which he proposes with "detailed<br />

justifications <strong>for</strong> deviations proposed". The purchaser, reserves the right to accept<br />

or reject these deviations and his decision thereon shall be f<strong>in</strong>al. (See Form 5).<br />

4.2 The equipment & material offered shall be <strong>in</strong> accordance with the draw<strong>in</strong>gs and<br />

specifications. Details of variation from the draw<strong>in</strong>gs and specifications, if any,<br />

should be clearly <strong>in</strong>dicated and <strong>in</strong> such an event, a certificate from the users must<br />

be furnished to the effect that the product offered per<strong>for</strong>ms the requisite functions<br />

satisfactorily, & is an alternative acceptable <strong>in</strong> one or more other countries. The<br />

name of users <strong>in</strong> those <strong>for</strong>eign countries should also be <strong>in</strong>dicated.<br />

4.3 Firms who have not carried out the works and supplied the items tendered <strong>for</strong> <strong>in</strong><br />

this case <strong>for</strong> the Indian Railways <strong>in</strong> the past should give details of supplies and<br />

works carried out and the customers along with their per<strong>for</strong>mance certificates.<br />

5. EARNEST MONEY/BID GUARANTEE<br />

5.1 The tenderer shall deposit <strong>in</strong> favour of the Dy FA & CAO, IRPMU, New Delhi, a<br />

sum of Rs. Rs. 2, 31,500/- (Rs. Two Lakhs Thirty one Thousand five Hundred<br />

only).<br />

5.2 The Earnest Money receipt shall be <strong>in</strong>corporated <strong>in</strong> the orig<strong>in</strong>al copy of the tender<br />

Signature of contractor Page 38 of 127 Dy CSTE/IRPMU/Kanpur


document. The other copies of the offer shall conta<strong>in</strong> true copies of Earnest<br />

Money receipt. The Earnest Money should be furnished either <strong>in</strong> cash or <strong>in</strong> any<br />

of the follow<strong>in</strong>g <strong>for</strong>ms:<br />

(a)<br />

(b)<br />

Deposit receipt, pay orders, Demand Drafts. These <strong>for</strong>ms of earnest money could<br />

be either of the State Bank of India or any of the Nationalized banks. No<br />

confirmatory advice from the Reserve Bank of India will be necessary.<br />

Deposit receipts executed by the Schedule Banks (other than the State Bank of<br />

India and the Nationalized Banks) approved by the Reserve Bank of India <strong>for</strong> this<br />

purpose. The Railways will not, however accept deposit receipt without gett<strong>in</strong>g <strong>in</strong><br />

writ<strong>in</strong>g the concurrence of Reserve Bank of India.<br />

NOTE: (a) In case the Earnest Money is deposited <strong>in</strong> cash the payment should<br />

be made to the Chief Cashier, North Central Railway, Allahabad and cash receipts<br />

obta<strong>in</strong>ed from him should be furnished along with the tender.<br />

Deposit receipts, Pay Order and Demand Drafts should be drawn <strong>in</strong> favour of the<br />

Dy FA&CAO, IRPMU, New Delhi, and endorsed "Account Payee". These<br />

<strong>in</strong>struments should be valid at least <strong>for</strong> the period cover<strong>in</strong>g the validity of the<br />

offer.<br />

5.3 No reference to the previous deposit of Earnest Money & Security Deposit <strong>for</strong><br />

adjustment aga<strong>in</strong>st the present tender will be accepted and any request <strong>for</strong><br />

recovery from any Security Deposit aga<strong>in</strong>st present tender will not be enterta<strong>in</strong>ed.<br />

5.4 The Earnest Money shall rema<strong>in</strong> deposited with the Purchaser <strong>for</strong> the period of<br />

120 days from the date of open<strong>in</strong>g of the tender. If the validity of the offer is<br />

extended, the Earnest Money Deposit duly extended shall also be furnished,<br />

fail<strong>in</strong>g which the offer after the expiry of the a<strong>for</strong>esaid period shall not be<br />

considered by the Purchaser.<br />

5.5 No <strong>in</strong>terest will be payable by the Purchaser on the Earnest Money.<br />

5.6 The Earnest Money deposited is liable to be <strong>for</strong>feited if the tenderer withdraws or<br />

amends impairs or derogates from the tender <strong>in</strong> any respect with<strong>in</strong> the period of<br />

validity of his offer.<br />

5.7 If the successful tenderer fails to furnish a Contract Per<strong>for</strong>mance Guarantee as<br />

required <strong>in</strong> the Special Conditions of Contract and fails to return the <strong>for</strong>mal<br />

contract duly signed with<strong>in</strong> 15 (fifteen) days of the receipt of the <strong>for</strong>mal contract,<br />

then the Earnest Money shall be liable to be <strong>for</strong>feited by the Purchaser.<br />

5.8 The Earnest Money of all unsuccessful tenderers will be returned by the Purchaser<br />

Signature of contractor Page 39 of 127 Dy CSTE/IRPMU/Kanpur


with<strong>in</strong> reasonable time after the f<strong>in</strong>alisation of the tender.<br />

5.9 Any tender not accompanied by Earnest Money <strong>in</strong> one of the approved <strong>for</strong>ms will<br />

be summarily rejected.<br />

6. SUBMISSION OF OFFERS<br />

6.1 All offers <strong>in</strong> the prescribed <strong>for</strong>ms should be submitted be<strong>for</strong>e the time and date<br />

fixed <strong>for</strong> the receipt of the offers. Offers received after the stipulated time and<br />

date will be dealt with as per rules <strong>in</strong> vogue <strong>in</strong> the Railways.<br />

6.2 In case the date of open<strong>in</strong>g happens to be a holiday or Bandh, the tender will be<br />

received and opened at the same time on the next work<strong>in</strong>g day.<br />

6.3 All offers shall be either type written or written neatly <strong>in</strong> <strong>in</strong>delible <strong>in</strong>k <strong>in</strong> English.<br />

Each page of the offer must be numbered consecutively. A reference to total<br />

number of pages compris<strong>in</strong>g the offer must be made at the top right hand corner<br />

of the top page. All the support<strong>in</strong>g documents should be submitted either <strong>in</strong><br />

orig<strong>in</strong>al or duly attested by a gazetted officer or notary public unless stated<br />

otherwise <strong>in</strong> these documents. The orig<strong>in</strong>al documents shall be produced <strong>for</strong><br />

verification when called <strong>for</strong>.<br />

6.4 All copies of the tender paper shall be signed <strong>in</strong> <strong>in</strong>k by the tenderer on each page<br />

<strong>in</strong>clud<strong>in</strong>g clos<strong>in</strong>g page, <strong>in</strong> token of his hav<strong>in</strong>g studied the Tender papers carefully.<br />

6.5 RATES IN FIGURES & WORDS: - All prices and other <strong>in</strong><strong>for</strong>mation like<br />

discounts etc. hav<strong>in</strong>g a bear<strong>in</strong>g on the price shall be written both <strong>in</strong> figures and <strong>in</strong><br />

words <strong>in</strong> the prescribed offer <strong>for</strong>m. In case of difference <strong>in</strong> words and figures the<br />

amount written <strong>in</strong> words will be taken <strong>in</strong>to consideration.<br />

6.6 ATTESTATION OF ALTERATION: - No scribbl<strong>in</strong>g is permissible <strong>in</strong> the tender<br />

documents. Tender conta<strong>in</strong><strong>in</strong>g erasures and alterations <strong>in</strong> the tender documents<br />

are liable to be rejected. Any correction made by the tenderer/tenderers <strong>in</strong><br />

his/their entries must be attested by him/them.<br />

6.7 The tenderer shall submit his tender <strong>in</strong> sealed cover. The tender shall be complete<br />

<strong>in</strong> all respects.<br />

6.8 The envelope should bear the tender number with description and date of<br />

clos<strong>in</strong>g/open<strong>in</strong>g clearly written on it and addressed to the Chief Adm<strong>in</strong>istrative<br />

Officer, IRPMU, Shivaji Bridge (IRCOT complex) New Delhi -110001.<br />

(a)<br />

The bid shall consist of the follow<strong>in</strong>g:-<br />

Signature of contractor Page 40 of 127 Dy CSTE/IRPMU/Kanpur


i) Offer letter complete. - Form No.1.<br />

ii)<br />

iii)<br />

iv)<br />

Schedule of Supply and Execution offer percentage above & below the estimated<br />

price.<br />

Earnest money <strong>in</strong> prescribed <strong>for</strong>m. (Para 5.0 of I.T.T.)<br />

Clause-wise compliance to tender conditions & Statements of deviations.<br />

Form No. 5 (Para 4 of I.T.T.)<br />

v) A copy of partnership deed and affidavit <strong>for</strong> proprietorship. (Para 7 of I.T.T.)<br />

vi)<br />

vii)<br />

viii)<br />

ix)<br />

Consortium agreement must accompany with the bid if the tenderer will<strong>in</strong>g to<br />

<strong>for</strong>m consortia (Para 17 of I.T.T.).<br />

Tenderer's credentials and will<strong>in</strong>gness of orig<strong>in</strong>al manufacturer as per Form<br />

No.13 Qualify<strong>in</strong>g Criteria (General) (Para 18.1 of I.T.T.).<br />

Similar works executed. (Para 18.2 of I.T.T.)<br />

Works <strong>in</strong> hand (para 18.2 of I.T.T.)<br />

x) Income Tax Clearance Certificate and audited balance sheet (Para 18.3 of I.T.T.)<br />

xi)<br />

xii)<br />

Eng<strong>in</strong>eer<strong>in</strong>g Organisation. (Para 18.5 of I.T.T.)<br />

Construction Mach<strong>in</strong>ery. (Para 18.6 of I.T.T.)<br />

xiii) Details of recommended Spares with quantities (S.C.C. Para 13).<br />

xiv) Details of special tools & <strong>in</strong>stallation materials (S.C.C. Para 10).<br />

xv) System Per<strong>for</strong>mance Guarantee (Para 22 of I.T.T.) – Form no. 7<br />

xvi)<br />

xvii)<br />

Tenderers scheme of work and Time Schedule (Para 12 of I.T.T.).<br />

Complete technical data and particulars of the equipment offered, as specified <strong>in</strong><br />

the Tender papers together with descriptive literature, leaflets etc. Draw<strong>in</strong>gs, if<br />

any, complete with list (Para 18.4 of I.T.T.).<br />

xviii) Name of manufacturers, place of manufacture and the certificate <strong>for</strong> proven<br />

design and per<strong>for</strong>mance (Para 18.4 of I.T.T.)<br />

xix)<br />

Technical proposal of the tenderer <strong>in</strong> con<strong>for</strong>mity with system design or alternative<br />

Signature of contractor Page 41 of 127 Dy CSTE/IRPMU/Kanpur


proposal of the tenderer, if any.<br />

xx)<br />

Any other <strong>in</strong><strong>for</strong>mation desired to be submitted by the tenderer.<br />

7. CONSTITUTION OF FIRM & POWER OF ATTORNEY<br />

7.1 Any <strong>in</strong>dividual(s) sign<strong>in</strong>g the tender or other documents connected therewith<br />

should specify whether he is sign<strong>in</strong>g: -<br />

(a)<br />

(b)<br />

(c)<br />

As sole proprietor of the concern or as attorney of the sole proprietor;<br />

As a partner or partners of the firm;<br />

As a Director, Manager or Secretary <strong>in</strong> the case of Limited Company duly<br />

authorised by a resolution passed by the Board of Directors or <strong>in</strong> pursuance of the<br />

authority conferred by Memorandum of Association.<br />

In the case of a firm not registered under the Indian Partnership Act, the names of<br />

all the exist<strong>in</strong>g partners and their full particulars should be furnished at the time of<br />

submitt<strong>in</strong>g the tender and all the partners with their full particulars or the attorney<br />

duly authorised by all of them should sign the tender and all other connected<br />

documents. The orig<strong>in</strong>al power of attorney or other documents empower<strong>in</strong>g the<br />

<strong>in</strong>dividual or <strong>in</strong>dividuals to sign should be furnished to the Purchaser <strong>for</strong><br />

verification, if required.<br />

7.3 The Railway will not be bound by Power of Attorney granted by the tenderer or<br />

by the changes <strong>in</strong> the composition of the firm made subsequent to the execution of<br />

the contract. It may, however, recognise such power of attorney and advice, the<br />

cost of which will be chargeable to the contractor. These charges have been fixed<br />

at Rs.100/- (Rs. One Hundred only) payable by the tenderer at the time of<br />

submitt<strong>in</strong>g the Power of Attorney <strong>for</strong> Scrut<strong>in</strong>y and legal advice.<br />

7.4 In case where the Power of Attorney partnership deed has not been executed <strong>in</strong><br />

English, the true and authenticated copies of the translation of the same by<br />

Advocate, authorised translators of Courts and Licensed Petition Writers should<br />

be supplied by the Contractor(s) while tender<strong>in</strong>g <strong>for</strong> the work.<br />

7.5 The cancellation of any documents such as Power of Attorney, Partnership deed<br />

etc. should be <strong>for</strong>thwith communicated by the contractor to the Railway<br />

Adm<strong>in</strong>istration <strong>in</strong> writ<strong>in</strong>g fail<strong>in</strong>g which the Railway Adm<strong>in</strong>istration shall have<br />

neither responsibility nor liability <strong>for</strong> any act so taken on the strength of the said<br />

documents.<br />

8. UNIT PRICES<br />

Signature of contractor Page 42 of 127 Dy CSTE/IRPMU/Kanpur


8.1 The Unit Prices should be quoted by the Contractor after tak<strong>in</strong>g all the relevant<br />

factors <strong>in</strong>to consideration and these should be Firm and all <strong>in</strong>clusive without any<br />

variation clauses. The prices shall be quoted <strong>in</strong> Indian rupees <strong>for</strong> the units under<br />

metric system. Reference may be made to Para-38 of Special Conditions of<br />

Contract.<br />

9. VALIDITY OF OFFER<br />

9.1 The tenderer shall keep the offer open <strong>for</strong> a m<strong>in</strong>imum period of 120 days from the<br />

date of open<strong>in</strong>g of the tender. With<strong>in</strong> that period, the tenderer can not withdraw<br />

his offer subject to the period be<strong>in</strong>g extended further if required by mutual<br />

agreement from time to time. Any contravention of the above condition will<br />

make the tenderer liable <strong>for</strong> <strong>for</strong>feiture of his Earnest Money Deposit.<br />

10. RATES DURING NEGOTIATION<br />

10.1 The tenderer/s shall not <strong>in</strong>crease his/their quoted rates <strong>in</strong> case the Railway<br />

Adm<strong>in</strong>istration negotiate <strong>for</strong> reduction of rates, such a negotiation shall not<br />

amount to cancellation or withdrawal of the orig<strong>in</strong>al offer and the rates orig<strong>in</strong>ally<br />

quoted will be b<strong>in</strong>d<strong>in</strong>g on the tenderer/s.<br />

11. INCOME TAX CLEARANCE CERTIFICATE<br />

11.1 The Tenderers are required to enclose along with the tender a Photostat copy of<br />

the valid Income Tax clearance certificate duly attested by Notary Public. The<br />

Tenderer will however submit the orig<strong>in</strong>al Income Tax clearance certificate<br />

whenever asked <strong>for</strong> by the purchaser <strong>for</strong> verification.<br />

12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH<br />

12.1 The works/work are/is to be completed with<strong>in</strong> a period as mentioned <strong>in</strong> preamble<br />

from the date of issue of Letter of Acceptance of the tender.<br />

12.2 The Tenderer shall enclose with his offer the scheme of work and time schedule<br />

<strong>in</strong> the <strong>for</strong>m of PERT chart <strong>in</strong>dicat<strong>in</strong>g all activities & show<strong>in</strong>g the period of time<br />

that he will take <strong>for</strong> the various items of work listed there<strong>in</strong>. The Tenderer shall<br />

<strong>in</strong>dicate <strong>in</strong> the <strong>for</strong>m of notes to the schedule the assumptions and the basis<br />

adopted <strong>for</strong> the preparation of the time schedule.<br />

12.3 The Successful Tenderer shall, however, submit their f<strong>in</strong>al programme <strong>in</strong><br />

consultation with Eng<strong>in</strong>eer of the project <strong>in</strong> terms of clause 6 of Special Condition<br />

of Contract.<br />

Signature of contractor Page 43 of 127 Dy CSTE/IRPMU/Kanpur


13. OPENING OF <strong>TENDER</strong><br />

13.1 The tender will be opened at the time & date of open<strong>in</strong>g of the tender given <strong>in</strong> the<br />

preamble <strong>in</strong> presence of such Tenderers/Representatives who choose to be<br />

present.<br />

13.2 If the offers are sent by post, should be sent only by registered post with<br />

acknowledgement duly addressed to The Chief Adm<strong>in</strong>istrative Officer, IRPMU,<br />

Shivaji Bridge (IRCOT complex) New Delhi 110001 clearly <strong>in</strong>dicat<strong>in</strong>g the<br />

contents as given <strong>in</strong> para 6.8. Offer sent by post must reach the office of The<br />

Chief Adm<strong>in</strong>istrative Officer, IRPMU, Shivaji Bridge (IRCOT complex) New<br />

Delhi 110001 be<strong>for</strong>e the clos<strong>in</strong>g time and date given <strong>in</strong> the preamble.<br />

14. NON-TRANSFERABILITY & NON-REFUNDABILITY<br />

The tender documents are not transferable. The cost of tender paper is not<br />

refundable.<br />

15. ERRORS OMISSIONS & DISCREPANCIES<br />

The Contractor(s) shall not take any advantage of any mis<strong>in</strong>terpretation of the<br />

conditions due to typ<strong>in</strong>g or any other error and if <strong>in</strong> doubt shall br<strong>in</strong>g it to the<br />

notice of the Eng<strong>in</strong>eer, without delay. In case of any contradiction only the<br />

pr<strong>in</strong>ted rules, and books should be followed and no claim <strong>for</strong> the mis<strong>in</strong>terpretation<br />

shall be enterta<strong>in</strong>ed.<br />

16. WRONG INFORMATION BY <strong>TENDER</strong>ER<br />

If the tenderer/s deliberately gives/give wrong <strong>in</strong><strong>for</strong>mation <strong>in</strong> his/their tender,<br />

creates/create circumstances <strong>for</strong> the acceptance of his/their tender, the Railway<br />

reserve the right to reject such tender at any stage.<br />

17. CONSORTIUM BIDS<br />

17.1 In view of nature of work covered <strong>in</strong> the Bid documents, it is anticipated that<br />

some of the <strong>in</strong>tend<strong>in</strong>g bidders will pool their resources and experience to <strong>for</strong>m<br />

consortia. In their own <strong>in</strong>terest, the bidders who <strong>for</strong>m such consortia are advised<br />

to <strong>in</strong>vestigate capabilities, availability of resources, experienced personnel,<br />

f<strong>in</strong>ancial soundness, past experience and concurrent engagements of constitut<strong>in</strong>g<br />

partners.<br />

17.2 Consortia of bidders, if any must clearly def<strong>in</strong>e role/scope of work of each<br />

partner/member. Further the legal agreement <strong>for</strong> a consortium must accompany<br />

the bid and should clearly def<strong>in</strong>e the leader of such a consortium who will be the<br />

Signature of contractor Page 44 of 127 Dy CSTE/IRPMU/Kanpur


prime contractor and will be responsible <strong>for</strong> timely completion of work as also<br />

dur<strong>in</strong>g execution of work, if awarded, co-ord<strong>in</strong>ate with Purchaser on behalf of the<br />

consortium, receive payments <strong>for</strong> the works executed and be liable <strong>for</strong> due<br />

per<strong>for</strong>mance of the contract <strong>in</strong> all respect. The tenderer must clearly write whether<br />

the offer is Consortium Bid or not. Remarks like ‘Complied’, ‘Noted’ will not<br />

suffice. In absence of clear submission, the offer will not be considered as<br />

Consortium Bid.<br />

17.3 Qualification documents, details etc., must however, be provided <strong>for</strong> each<br />

member firm complete <strong>in</strong> all respects strictly <strong>in</strong> requisite pro-<strong>for</strong>ma.<br />

17.4 A consortium <strong>for</strong>med will not be subject to alteration with regard to change <strong>in</strong><br />

constitut<strong>in</strong>g firms and/or reorientation of roles. Any changes if proposed by<br />

consortium to take advantage of certa<strong>in</strong> developments dur<strong>in</strong>g evaluation stage will<br />

render the bid liable to be rejected. As all details are required to be furnished<br />

along with the bids and should be critically exam<strong>in</strong>ed dur<strong>in</strong>g evaluation of bids, it<br />

is imperative that such details should have been thoroughly exam<strong>in</strong>ed as a<br />

safeguard aga<strong>in</strong>st a possible disqualification of bids on these grounds.<br />

17.5 All partners of the consortium shall be jo<strong>in</strong>tly and severally liable to the purchaser<br />

<strong>for</strong> the execution of the entire contract <strong>in</strong> accordance with its terms.<br />

18. QUALIFICATION CRITERIA<br />

18.1 GENERAL:<br />

18.1.1 Qualification criteria under this para lays down m<strong>in</strong>imum acceptable<br />

qualifications <strong>in</strong> various areas to ensure that qualified bidder has necessary<br />

experience, expertise, f<strong>in</strong>ancial and human resources to successfully complete the<br />

project. In case of a consortium bid, the qualification document details etc. must<br />

be provided <strong>for</strong> each member of consortium.<br />

18.1.2 If the tenderer proposes to buy any equipment from other suppliers/sources,<br />

documents <strong>in</strong>dicat<strong>in</strong>g their will<strong>in</strong>gness to supply the equipment and provide<br />

technical support to the tenderer that may be required dur<strong>in</strong>g <strong>in</strong>stallation,<br />

commission<strong>in</strong>g and warranty period and later on directly to the railways, shall be<br />

<strong>in</strong>cluded <strong>in</strong> the tender. Qualification documents and other details <strong>for</strong> such supplier<br />

shall be <strong>in</strong>cluded <strong>in</strong> the tender.<br />

18.1.3 The tenderer should submit the details of experience <strong>in</strong> works and services <strong>in</strong><br />

projects of similar nature br<strong>in</strong>g<strong>in</strong>g out clearly the expertise <strong>in</strong> the equipment<br />

manufacture, <strong>in</strong>stallation etc. of mobile tra<strong>in</strong> radio communication system.<br />

18.1.4 The tenderer shall complete the pro-<strong>for</strong>ma at Form No.13 and submit a certificate<br />

Signature of contractor Page 45 of 127 Dy CSTE/IRPMU/Kanpur


from the orig<strong>in</strong>al user <strong>for</strong> whom the project was undertaken certify<strong>in</strong>g the date of<br />

award of contract, date of completion, date of commission<strong>in</strong>g and the present<br />

work<strong>in</strong>g state of the system so established. The tenderer shall provide these<br />

details <strong>for</strong> all the projects that he has executed which satisfy the m<strong>in</strong>imum<br />

requirements <strong>in</strong> each case.<br />

18.2 MINIMUM ELIGIBILITY<br />

The tenderer or the consortium should have m<strong>in</strong>imum eligibility criteria as given<br />

<strong>in</strong> the table below:<br />

1. Should have completed <strong>in</strong> the last three f<strong>in</strong>ancial years (i.e. current year and three<br />

previous f<strong>in</strong>ancial years).<br />

At least one similar s<strong>in</strong>gle work, <strong>for</strong> a m<strong>in</strong>imum value of 35% of advertised<br />

Tender value of work.<br />

2. Total contract amount received dur<strong>in</strong>g last three years, as per current ITCC/<br />

Audited Balance Sheet should be a m<strong>in</strong>imum of 150% of Advertised Tender<br />

value of work.<br />

Note: Mean<strong>in</strong>g of similar work: -<br />

(a) Outdoor and Indoor Signall<strong>in</strong>g works of RRI/PI/EI/MACLS/Automatic signall<strong>in</strong>g or<br />

(b) Outdoor Signall<strong>in</strong>g works of RRI/PI/EI/MACLS/Automatic signall<strong>in</strong>g<br />

Tenders not accompanied with documents <strong>in</strong> support of credentials, and without<br />

complete documentation as mentioned <strong>in</strong> tender papers, shall not be considered and<br />

will be rejected summarily.<br />

18.3 FINANCIAL:<br />

18.3.1 The tenderer should produce:<br />

i) Latest Income Tax clearance certificate.<br />

ii)<br />

Audited Balance Sheet and Income statement of just concluded year.<br />

18.3.2 The tenderer shall furnish such documents as to establish the f<strong>in</strong>ancial soundness<br />

of his company as well as that of other companies if more than one company is<br />

<strong>in</strong>volved <strong>in</strong> bidd<strong>in</strong>g <strong>for</strong> this tender. The latest balance sheet, audited or certified<br />

by a neutral agency shall be furnished.<br />

Signature of contractor Page 46 of 127 Dy CSTE/IRPMU/Kanpur


18.3.3 The bidder shall submit required <strong>in</strong><strong>for</strong>mation <strong>in</strong> a separate Annexure and also a<br />

certificate from the user <strong>for</strong> whom the project was executed about the correctness<br />

of the dates <strong>in</strong>volved and satisfactory per<strong>for</strong>mance of the equipment/system.<br />

18.4 TECHNOLOGY & EQUIPMENT:<br />

18.4.1 The tenderer shall clearly identify the sources from which the equipment to be<br />

supplied under this tender will be obta<strong>in</strong>ed.<br />

18.4.2 All equipment proposed be used shall be of proven design and per<strong>for</strong>mance. The<br />

equipment of same family shall have been successfully commissioned and<br />

rema<strong>in</strong>ed <strong>in</strong> service at least <strong>for</strong> a period of one year on the date of tender<br />

submission. However, the tenderer shall supply latest version of the equipment<br />

under the standard. Certificate from the actual user of the equipment about<br />

satisfactory per<strong>for</strong>mance shall be enclosed with the tender. Any equipment<br />

proposed be manufactured with <strong>for</strong>eign collaborator shall be covered by the<br />

per<strong>for</strong>mance guarantee of the <strong>for</strong>eign collaborator.<br />

18.4.3 SOFTWARE:<br />

Software version of the equipment be<strong>in</strong>g supplied should be latest and must be<br />

<strong>in</strong>dicated.<br />

18.4.4 All the software upgrades and / or patches required <strong>for</strong> the ma<strong>in</strong>tenance of the<br />

system supplied will be implemented free of cost at each site <strong>for</strong> seven years by<br />

respective bidders. Acceptance Test<strong>in</strong>g of the system will be got done by him<br />

through authority designated by Railways <strong>for</strong> all functions of all systems after the<br />

implementation of the ma<strong>in</strong>tenance Software Upgrades / Patches <strong>in</strong> each system.<br />

18.5 ENGINEERING ORGANISATION:<br />

18.5.1 The tenderer shall make an assessment of the requirement of personnel <strong>for</strong><br />

execution of this project and shall give details as to how he proposes to mobilise<br />

all technical manpower required <strong>for</strong> the project. Details of the qualification and<br />

experience of the personnel identified <strong>for</strong> project execution shall be <strong>in</strong>cluded <strong>in</strong><br />

the tender.<br />

18.5.2 The successful tenderer shall appo<strong>in</strong>t a Project Manager who would have<br />

adequate experience <strong>in</strong> project management of similar nature, unless the railway<br />

so desire, the Project Manager should preferably be reta<strong>in</strong>ed till all the obligations<br />

under the contract have been fulfilled.<br />

18.5.3 The tenderers shall have at least one graduate Eng<strong>in</strong>eer and two experienced<br />

Signature of contractor Page 47 of 127 Dy CSTE/IRPMU/Kanpur


supervisors (Diploma Holders) hav<strong>in</strong>g 5/6 years experience <strong>in</strong> the relevant field,<br />

supported by at least 5 Nos. of artisan staff like Telecom. Mechanics, wire-men,<br />

cable jo<strong>in</strong>ters etc.<br />

18.5.4 Tenderer shall advise the number of Eng<strong>in</strong>eers, Supervisors and Cable<br />

Jo<strong>in</strong>ters/Artisans employed by him or go<strong>in</strong>g to be employed by him with their<br />

names, qualifications bio-data and experience <strong>in</strong> this particular trade under<br />

consideration along with the Tender positively. Irrevocable letters of commitment<br />

of the said Supervisors and Key Technicians/Artisans <strong>for</strong> do<strong>in</strong>g the work shall be<br />

furnished along with Tender Papers if they are not already <strong>in</strong> employment of the<br />

Tenderer.<br />

18.6 CONSTRUCTION MACHINERY<br />

The firm should have m<strong>in</strong>imum construction mach<strong>in</strong>ery, Tools and plants, test &<br />

measur<strong>in</strong>g <strong>in</strong>struments, Vehicles etc. Details of which will be furnished by them<br />

along with the bid.<br />

No tools and plants, scaffold<strong>in</strong>g materials <strong>for</strong> shutter<strong>in</strong>g, enter<strong>in</strong>g, shor<strong>in</strong>g etc.<br />

shall be supplied by the Railway and contractor will have to make his own<br />

arrangement <strong>for</strong> execution of the work.<br />

19 DETERMINATION OF RESPONSIVENESS<br />

19.1 Purchaser will determ<strong>in</strong>e whether each bid is substantively responsive to the<br />

equipment of the bidd<strong>in</strong>g documents.<br />

19.2 For the purpose of this Clause, a substantively responsive bid is one, which<br />

con<strong>for</strong>ms to all the terms, conditions and specifications of the bidd<strong>in</strong>g documents<br />

without material deviation or reservation. A material deviation or reservation is<br />

one, which affects <strong>in</strong> substantial way the scope, quality or per<strong>for</strong>mance of the<br />

works, or which limits <strong>in</strong> any substantial way, <strong>in</strong>consistent with the bidd<strong>in</strong>g<br />

documents, the Purchaser’s right or the bidder’s obligations under the Contract<br />

and the rectification of which deviation or reservation would affect unfairly the<br />

competitive position of other bidders present<strong>in</strong>g substantively responsive bids.<br />

20. CORRECTION OF ERRORS<br />

Bids determ<strong>in</strong>ed to be substantively responsive will be checked by the Purchaser<br />

<strong>for</strong> any arithmetic errors <strong>in</strong> computation and summation. The Purchaser will<br />

correct errors as follows: -<br />

a) Where there is a discrepancy between amounts <strong>in</strong> figures and <strong>in</strong> words, the<br />

amount <strong>in</strong> words will <strong>gov</strong>ern; and<br />

Signature of contractor Page 48 of 127 Dy CSTE/IRPMU/Kanpur


) Where there is a discrepancy between the unit rate and the total amount derived<br />

from the multiplication of the unit rate and the quantity, the unit rate as quoted<br />

will <strong>gov</strong>ern, unless <strong>in</strong> the op<strong>in</strong>ion of the Purchaser there is an obviously gross<br />

misplacement of the decimal po<strong>in</strong>t <strong>in</strong> the unit rate, <strong>in</strong> which event the total<br />

amount as quoted will <strong>gov</strong>ern and the unit rate will be corrected.<br />

20.2 The amount stated <strong>in</strong> the Form of Bid will be adjusted by the Purchaser <strong>in</strong><br />

accordance with the above procedure <strong>for</strong> the correction of errors and with the<br />

concurrence of the bidder, shall be considered as b<strong>in</strong>d<strong>in</strong>g upon the bidder. If the<br />

bidder does not accept the corrected amount of bid, his bid will be rejected and<br />

the bid security will be <strong>for</strong>feited.<br />

21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES<br />

Should there be any necessity of conversion to a s<strong>in</strong>gle currency i.e. Indian<br />

Rupees <strong>for</strong> the purpose of evaluation and comparison of offers, the Purchaser will<br />

convert the <strong>for</strong>eign currency content of each tender received <strong>in</strong>to Rupees at the<br />

sell<strong>in</strong>g exchange rate <strong>for</strong> each currency established by the Reserve Bank of India<br />

or any other Commercial Bank <strong>in</strong> the Purchaser's country, <strong>for</strong> similar transactions<br />

on the earlier of the follow<strong>in</strong>g date, namely, on the day twenty eight days be<strong>for</strong>e<br />

the latest date of tender open<strong>in</strong>g.<br />

22. SYSTEM PERFORMANCE GUARANTEE<br />

22.1 S<strong>in</strong>ce the design of the system to achieve the end objective shall be checked and<br />

confirmed by the contractor and the supply of the materials will be accord<strong>in</strong>g to<br />

this system design, the tenderer shall give unqualified and unconditional<br />

guarantee that when the equipment supplied by him is <strong>in</strong>stalled and commissioned<br />

at site, it shall achieve the desired objective and that <strong>in</strong> the event of per<strong>for</strong>mance<br />

of the system when <strong>in</strong>stalled not comply<strong>in</strong>g with the end objective or with the<br />

specifications, he shall provide further <strong>in</strong>puts to enable the Railways to realise<br />

the end objectives with full compliance of the specifications conta<strong>in</strong>ed <strong>in</strong> these<br />

documents. No additional payment will be made to the contractor <strong>for</strong> supply<br />

of any additional goods and service required <strong>in</strong> this regard.<br />

22.2 This certificate <strong>in</strong> the pro-<strong>for</strong>ma given <strong>in</strong> Form No.7, shall accompany the offer.<br />

Absence of this certificate which will <strong>for</strong>m part of the agreement shall disqualify<br />

the tenderer automatically.<br />

23. AUTHORITY FOR ACCEPTANCE<br />

The authority <strong>for</strong> the acceptance of the tender will rest with the Purchaser. The<br />

purchaser shall not be bound to accept the lowest or any tender or to assign any<br />

Signature of contractor Page 49 of 127 Dy CSTE/IRPMU/Kanpur


eason <strong>for</strong> non-acceptance or rejection of a tender. The purchaser reserves the<br />

right to accept any tender <strong>in</strong> respect of the whole or any portion of the work<br />

specified <strong>in</strong> the tender paper or to sub-divide the work among different<br />

Tenderers or to reduce the work or to accept any tender <strong>for</strong> less than the<br />

tendered quantities without assign<strong>in</strong>g any reason whatsoever.<br />

24. PURCHASE PREFERENCE<br />

10% purchase preference of lowest valid bid price, other th<strong>in</strong>gs be<strong>in</strong>g equal <strong>for</strong><br />

product & services will be admissible <strong>for</strong> Central Public Sector Under tak<strong>in</strong>g <strong>in</strong><br />

this tender subject to satisfaction of all other Terms & Conditions.<br />

25. AGREEMENT<br />

The successful tenderer/s shall be required to execute an agreement with the<br />

President of India act<strong>in</strong>g through the Chief Adm<strong>in</strong>istrative Officer, IRPMU,<br />

Shivaji Bridge (IRCOT complex) New Delhi 110001 or his accredited officer <strong>for</strong><br />

carry<strong>in</strong>g out the work accord<strong>in</strong>g to the tender documents as <strong>in</strong>dicated <strong>in</strong> para 2 of<br />

Special Conditions of Contract.<br />

26. <strong>TENDER</strong>ER'S ADDRESS<br />

Tenderer shall state <strong>in</strong> the tender his postal address fully and clearly. Any<br />

communication sent to the tenderers by post at his said address, shall be deemed<br />

to have reached the tenderer duly & timely, not withstand<strong>in</strong>g the fact that the<br />

communication could not reach the tenderer at all or <strong>in</strong> time <strong>for</strong> whatever reason.<br />

Important documents shall be sent by Registered post.<br />

27. FOREIGN EXCHANGE<br />

No <strong>for</strong>eign exchange and/or import license will be released /provided to the<br />

contractor <strong>in</strong> connection with this contract.<br />

Signature of contractor Page 50 of 127 Dy CSTE/IRPMU/Kanpur


Section – II<br />

Chapter – 2<br />

Special Conditions of<br />

Contract<br />

Signature of contractor Page 51 of 127 Dy CSTE/IRPMU/Kanpur


Special Conditions of Contract<br />

INDEX<br />

1. <strong>TENDER</strong> <strong>DOCUMENT</strong>S<br />

2. AGREEMENT<br />

3. SECURITY DEPOSIT & CONTRACT PERFORMANCE GUARANTEE<br />

4. CONTRACTOR'S OFFICE & STORES DEPOT<br />

5. USE OF RAILWAY LAND<br />

6. PROGRAMME OF WORK/OBLIGATION TO CARRY OUT ENGINEER’S INSTRUCTIONS<br />

7. COMPETENT SUPERVISORS<br />

8. MATERIAL SUPPLIED BY RAILWAYS<br />

9. MATERIAL SUPPLIED BY CONTRACTOR<br />

10. OTHER RAILWAY STORES:<br />

11. TESTING & MEASURING INSTRUMENTS, SPECIAL TOOLS AND<br />

INSTALLATION MATERIAL<br />

12. SUPPLY OF TECHNICAL LITERATURES, <strong>DOCUMENT</strong>ATION,<br />

DRAWINGS & COMPLETION PLANS ETC.<br />

13. SPARES<br />

14. LONG TERM AVAILABILITY OF SPARES AND SYSTEM SUPPORT<br />

15. QUALITY ASSURANCE<br />

16. EQUIPMENT EVALUATION AND APPROVAL<br />

17. INSPECTION OF MATERIALS<br />

18. INSPECTION OF WORKS<br />

19. QUANTUM OF WORK AND VARIATION IN QUANTITIES<br />

20. ADDITION/REDUCTION OF WORK<br />

21. SUBLETTING AND ASSIGNMENT<br />

22. EXECUTION OF WORK<br />

23. PROGRESS REPORTING<br />

Signature of contractor Page 52 of 127 Dy CSTE/IRPMU/Kanpur


24. MAINTENANCE OF WORKS<br />

25 CLEARANCE OF SITE<br />

26. PROVISIONAL ACCEPTANCE<br />

27. PLACING IN SERVICE & MAINTENANCE SUPERVISION<br />

28 FINAL ACCEPTANCE<br />

29. WARRANTY<br />

30. TRAINING<br />

31. INFRINGEMENT OF PATENTS<br />

32. LICENSE AS PER GOVT. OF INDIA CONTRACT LABOUR ACT<br />

33. DEFAULT & DELAYS<br />

34. LOSS SUSTAINED DUE TO DEFAULT AND DELAY<br />

35. PENALTY FOR DELAY IN COMPLETION<br />

36. EXTENSION OF TIME<br />

37. CONTRATOR'S LIABILITIES FOR COSTS AND DAMAGES<br />

38. UNIT PRICES<br />

39. MEASUREMENT OF WORKS<br />

40. TERMS OF PAYMENT<br />

41. ON ACCOUNT PAYMENT<br />

42. FINAL SETTLEMENT<br />

43. CERTIFICATE FOR MODVAT BENEFITS ON BILLS:<br />

44. DEDUCTION FROM ON ACCOUNT PAYMENT BILLS<br />

45. TAXES<br />

46. INSURANCE<br />

47. FORCE MAJEURE CLAUSE<br />

48. SETTLEMENT OF DISPUTE AND ARBITRATION<br />

*****<br />

Signature of contractor Page 53 of 127 Dy CSTE/IRPMU/Kanpur


SPECIAL CONDITIONS OF CONTRACT<br />

1. <strong>TENDER</strong> <strong>DOCUMENT</strong>S<br />

1.1 The goods and services required, bidd<strong>in</strong>g procedure and contract terms are<br />

prescribed <strong>in</strong> the tender documents. Bid documents can be obta<strong>in</strong>ed from 4 th December<br />

2008 to 22 nd December 2008 from 10.30 Hrs. to 16.00 Hrs. on every work<strong>in</strong>g day <strong>in</strong> the<br />

office of Dy CSTE/IRPMU, Old Microwave Build<strong>in</strong>g, N C Railway, Juhi, Kanpur, after<br />

deposit<strong>in</strong>g Rs 10,000/- (Rupees Ten Thousand only) <strong>in</strong> the <strong>for</strong>m of bank draft made <strong>in</strong><br />

favour of Dy. FA & CAO, IRPMU, New Delhi. The attention of tenderer is <strong>in</strong>vited to the<br />

follow<strong>in</strong>g documents:<br />

Section-I:<br />

Section-II:<br />

Section-III:<br />

Preamble along with Schedule of Requirement of quantities.<br />

Chapters<br />

1. Instructions to Tenderers and conditions of tender<strong>in</strong>g.<br />

2. Special Conditions of Contract.<br />

3. Tender Forms<br />

Technical Supplement along with Technical Instructions, Specifications<br />

and Draw<strong>in</strong>gs etc. <strong>for</strong> the scope of the work <strong>in</strong>cluded <strong>in</strong> this tender.<br />

Misc I) General Conditions of Contract (G.C.C.) as amended by advance<br />

correction slips issued up to date.<br />

II) IRS conditions of contract <strong>for</strong> the stores department with up to date<br />

modification (CCSS).<br />

General Conditions of Contract (G.C.C.) as amended by advance correction slips<br />

issued up to-date and IRS conditions of contract <strong>for</strong> the stores department with<br />

up to date modification (CCSS) can be obta<strong>in</strong>ed, if need be, from the office of the<br />

CAO/IRPMU after pay<strong>in</strong>g the cost prescribed <strong>for</strong> it <strong>in</strong> the <strong>for</strong>m of Bank Draft <strong>in</strong><br />

favour of Dy FA&CAO/IRPMU, New Delhi.<br />

1.2 If the Tender submitted by a tenderer is accepted and the contract awarded to the<br />

Tenderer, the various works com<strong>in</strong>g under purview of the contract shall be<br />

<strong>gov</strong>erned by tender documents mentioned above. Where there is any conflict<br />

between the <strong>in</strong>structions to tenderers and conditions of tender<strong>in</strong>g and special<br />

conditions of contract, Tender <strong>for</strong>ms, annexure etc. on one hand and General<br />

Conditions of Contract on the other, the <strong>for</strong>mer shall prevail.<br />

Signature of contractor Page 54 of 127 Dy CSTE/IRPMU/Kanpur


1.3 Any Special conditions stated by the Tenderer <strong>in</strong> the cover<strong>in</strong>g letter submitted<br />

along with the tender shall be deemed to be a part of the Contract to such extent<br />

only, as have been explicitly accepted by the Railway.<br />

1.4 The expression General conditions of contract (GCC), wherever occurr<strong>in</strong>g <strong>in</strong> these<br />

papers shall be deemed to mean the General conditions of contract, 1969 of<br />

Northern Railway department as amended by advance correction slips issued upto-date.<br />

2. AGREEMENT<br />

The successful Tenderer shall with<strong>in</strong> 21 days after hav<strong>in</strong>g been called upon by<br />

notice to do so be bound to execute an agreement based on accepted rates and<br />

conditions, <strong>in</strong> such <strong>for</strong>m as the Railways may prescribe, and lodge the same with<br />

the Railway together with the conditions of contract, specifications and<br />

Schedule of prices referred to there<strong>in</strong> duly completed. The <strong>for</strong>m <strong>for</strong> agreement<br />

is <strong>in</strong>cluded <strong>in</strong> Section II, Chapter-III (Form No.3).<br />

3. SECURITY DEPOSIT & CONTRACT PERFORMANCE GUARANTEE<br />

3.1 SECURITY DEPOSIT<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

Security deposit shall be 5% of the contract value<br />

The rate of recovery shall be @10% of the bill amount till the full security deposit<br />

is recovered. The EMD of successful tenderer will be reta<strong>in</strong>ed as part of Security<br />

deposit and will be adjusted <strong>in</strong> Security deposit, with only money over and above<br />

the Earnest money that will be recovered<br />

Security deposit will be recovered only from the runn<strong>in</strong>g bill of the contract and<br />

no other mode of collect<strong>in</strong>g SD as <strong>in</strong> the <strong>for</strong>m of <strong>in</strong>struments like BG, FD etc<br />

shall be accepted towards Security Deposit.<br />

No <strong>in</strong>terest will be payable upon the Security Deposit or amounts payable to the<br />

contractor under this contract.<br />

Security Deposit will be returned to the contractor after physical completion of<br />

work, ma<strong>in</strong>tenance period and warranty if any as certified by competent authority<br />

and settlement of all dues and disputes. The competent authority shall normally be<br />

the authority, who is competent to sign the contract. If this competent authority is<br />

of the rank lower than the JA grade, then a JA grade officer (concerned with the<br />

work) should issue the certificate. The certificate <strong>in</strong>ter alia should mention that<br />

the work has been completed <strong>in</strong> all respects & that all the contractual obligations<br />

have been fulfilled by the contractors and that there is no due from the contractor<br />

to Railways aga<strong>in</strong>st the contract concerned. Be<strong>for</strong>e releas<strong>in</strong>g the Security Deposit,<br />

contractor concerned should submit an unconditional & unequivocal no claim<br />

certificate.<br />

Signature of contractor Page 55 of 127 Dy CSTE/IRPMU/Kanpur


3.2 PERFORMANCE GUARANTEE<br />

The procedure <strong>for</strong> obta<strong>in</strong><strong>in</strong>g Per<strong>for</strong>mance Guarantee is outl<strong>in</strong>ed below:-<br />

(a)<br />

(b)<br />

The successful bidder shall submit a Per<strong>for</strong>mance Guarantee (PG) <strong>in</strong><br />

the <strong>for</strong>m of an irrevocable bank guarantee amount<strong>in</strong>g to 5% of the<br />

contract value.<br />

A Per<strong>for</strong>mance Guarantee shall be submitted by the successful bidder<br />

after the letter of acceptance has been issued, but be<strong>for</strong>e sign<strong>in</strong>g of the<br />

agreement. The agreement should normally be signed with<strong>in</strong> 15 days after<br />

the issue of LOA and Per<strong>for</strong>mance Guarantee shall also be submitted<br />

with<strong>in</strong> this time limit. This guarantee shall be <strong>in</strong>itially valid up to the<br />

stipulated date of completion plus 60 days beyond that. In case, the time<br />

<strong>for</strong> completion of work gets extended, the contractor shall get the validity<br />

of Per<strong>for</strong>mance Guarantee extended to cover such extended time <strong>for</strong><br />

completion of work plus 60 days.<br />

(c ) The Per<strong>for</strong>mance Guarantee (PG) shall be released after the physical<br />

completion of the work based on the “Completion Certificate” issued by<br />

the competent authority stat<strong>in</strong>g that the contractor has completed the<br />

work <strong>in</strong> all respects satisfactorily . The security deposit, however, shall be<br />

released only after the expiry of the ma<strong>in</strong>tenance period, warranty period<br />

if any and after pass<strong>in</strong>g the f<strong>in</strong>al bill based on “No Claim Certificate”.<br />

(d)<br />

(e)<br />

Wherever the contracts is resc<strong>in</strong>ded, the security deposit shall be <strong>for</strong>feited<br />

and Per<strong>for</strong>mance Guarantee shall be encashed and the balance work shall<br />

be got done <strong>in</strong>dependently without risk and cost of the failed contractor.<br />

The failed contractor shall be debarred from participat<strong>in</strong>g <strong>in</strong> the tender <strong>for</strong><br />

execut<strong>in</strong>g the balance work. If the failed contractor is a JV or a partnership<br />

firm, then every member/partner of such a firm shall be debarred from<br />

participat<strong>in</strong>g <strong>in</strong> the tender <strong>for</strong> the balance work either <strong>in</strong> his/her <strong>in</strong>dividual<br />

capacity or as a partner of any other JV/partnership firm. The contractor<br />

cannot make any legal claims aga<strong>in</strong>st the same.<br />

The Eng<strong>in</strong>eer shall not make a claim under the Per<strong>for</strong>mance Guarantee<br />

except <strong>for</strong> amounts to which the President of India is entitled under the<br />

contract (not withstand<strong>in</strong>g and /or without prejudice to any other<br />

provisions <strong>in</strong> the contract agreement) <strong>in</strong> the event of:<br />

1. Failure by the contractor to extend the validity of the Per<strong>for</strong>mance<br />

Guarantee as described here<strong>in</strong> above, <strong>in</strong> which event the Eng<strong>in</strong>eer may<br />

claim the full amount of the Per<strong>for</strong>mance Guarantee.<br />

Signature of contractor Page 56 of 127 Dy CSTE/IRPMU/Kanpur


2. Failure by contractor to pay President of India any amount due, either as<br />

agreed by the contractor or determ<strong>in</strong>ed under any of the<br />

Clauses/Conditions of the agreement, with<strong>in</strong> 30 days of the service of<br />

notice to this effect by Eng<strong>in</strong>eer.<br />

3. The contract be<strong>in</strong>g determ<strong>in</strong>ed or resc<strong>in</strong>ded under provision of the GCC<br />

the Per<strong>for</strong>mance Guarantee shall be <strong>for</strong>feited <strong>in</strong> full and shall be<br />

absolutely at the disposal of the President of India.<br />

4. CONTRACTOR'S OFFICE & STORES DEPOT<br />

The Contractor shall, with<strong>in</strong> a month of issue of letter of acceptance of tender,<br />

establish an office and stores depot at a convenient place <strong>for</strong> receiv<strong>in</strong>g and<br />

stor<strong>in</strong>g equipments and materials and progress<strong>in</strong>g field work expeditiously <strong>in</strong><br />

consultation and with the approval of the purchaser. He shall <strong>in</strong>timate the<br />

purchaser and address thereof to which all correspondence should be sent. Any<br />

communication sent to the contractor by post at his said address shall be deemed<br />

to have reached the contractor duly and <strong>in</strong> time. Important documents shall be<br />

sent by Registered post.<br />

5. USE OF RAILWAY LAND<br />

Use of Railway land required by the Contractor <strong>for</strong> constructions of temporary<br />

offices, quarter(s), hutments etc. <strong>for</strong> the staff and <strong>for</strong> stor<strong>in</strong>g materials etc., will be<br />

permitted to him/them free by Railway, if available. The location of these offices,<br />

hutments, stores etc. will be subject to the approval of the Eng<strong>in</strong>eer or his<br />

representative. The land will be restored to Railways by the Contractor(s) <strong>in</strong> the<br />

same condition as when taken over or <strong>in</strong> vacant condition as desired by the<br />

Eng<strong>in</strong>eer, after completion of the work or at any earlier day, as specified by the<br />

Eng<strong>in</strong>eer. The failure to do so will make the Contractor(s) liable to pay the cost<br />

<strong>in</strong>curred by the Railway <strong>for</strong> gett<strong>in</strong>g possession of land.<br />

6. PROGRAMME OF WORK/OBLIGATION TO CARRY OUT<br />

ENGINEER’S INSTRUCTIONS<br />

6.1 The Contractor shall have necessary resources to execute the work so that the<br />

entire work is completed with<strong>in</strong> a period as mentioned <strong>in</strong> the preamble from<br />

the date of issue of Letter of Acceptance of the tender. He shall also have<br />

necessary resources to take up the work of <strong>in</strong>stallation commission<strong>in</strong>g etc.<br />

simultaneously at two <strong>in</strong>dependent places.<br />

6.2 With<strong>in</strong> a period of 30 days beg<strong>in</strong>n<strong>in</strong>g from the date of issue of Letter of<br />

Acceptance of Tender, the Contractor shall submit the detailed time schedule <strong>for</strong><br />

the execution of work based on the conditions <strong>in</strong> consultation with the Railway to<br />

Signature of contractor Page 57 of 127 Dy CSTE/IRPMU/Kanpur


the authority mentioned <strong>in</strong> the Preamble and approved by the latter <strong>in</strong> writ<strong>in</strong>g<br />

be<strong>for</strong>e commencement of the work.<br />

6.3 The Contractor shall be held responsible <strong>for</strong> the execution of the work accord<strong>in</strong>g<br />

to the Programme given above <strong>for</strong> the execution of the work <strong>in</strong> full compliance of<br />

the approved cable route plans and also the various clauses of the technical<br />

supplement, Technical specifications, <strong>in</strong>structions and draw<strong>in</strong>gs available<br />

separately. Failure to comply with any of these will be dealt with as per provision<br />

laid down <strong>in</strong> General Conditions of Contract.<br />

6.4 The Contractor on his part will have to employ supervisors, technicians and<br />

labour <strong>in</strong> full strength commensurate with work<strong>in</strong>g area available. He will also<br />

arrange match<strong>in</strong>g materials and equipment to complete the job most expeditiously<br />

so as to ensure that the work is completed <strong>in</strong> phases with<strong>in</strong> the stipulated period.<br />

6.5 Inspection Register shall be ma<strong>in</strong>ta<strong>in</strong>ed at the site of work by the Railway<br />

where<strong>in</strong> <strong>in</strong>structions regard<strong>in</strong>g the work<strong>in</strong>g etc. shall be recorded by the Eng<strong>in</strong>eer<br />

or his executive subord<strong>in</strong>ates. It is expected of the Contractor or his representative<br />

at the site to note such <strong>in</strong>structions whenever asked upon to do so and take action<br />

accord<strong>in</strong>gly.<br />

6.6 No facility whatsoever, e.g. provisions of approach road and provision of<br />

temporary level cross<strong>in</strong>g etc. will be provided by Railway <strong>for</strong> cart<strong>in</strong>g materials.<br />

Approach roads with<strong>in</strong> the Railway limits can be used <strong>for</strong> cart<strong>in</strong>g materials.<br />

6.7 The contractor will programme his work <strong>in</strong> such a manner so as not to <strong>in</strong>terfere <strong>in</strong><br />

the work<strong>in</strong>g and movement of tra<strong>in</strong>s. No extra payment shall be allowed on this<br />

account and <strong>for</strong> tak<strong>in</strong>g any precautions or wastage of contractor's labour, time etc.<br />

due to tra<strong>in</strong> work<strong>in</strong>g.<br />

7. COMPETENT SUPERVISORS<br />

7.1 The Contractor shall place and keep competent Representatives /Supervisors/<br />

Eng<strong>in</strong>eers, as his representative on the works who will be authorised to receive<br />

and acknowledge materials issued by the Railway and take all orders issued by the<br />

Railway.<br />

7.2 The contractor shall employ the follow<strong>in</strong>g technical staff as a m<strong>in</strong>imum, dur<strong>in</strong>g<br />

the execution of the work:<br />

a) One graduate Eng<strong>in</strong>eer when the cost of the work to be executed is<br />

Rs.15 Lacs and above.<br />

b) One Identified diploma holder when the cost of work to be executed is<br />

Signature of contractor Page 58 of 127 Dy CSTE/IRPMU/Kanpur


more than 5 Lacs but less than Rs.15 Lacs.<br />

7.2.1 The technical staff should be available at site whenever required by the Eng<strong>in</strong>eer<strong>in</strong>-charge<br />

to take <strong>in</strong>structions. In case the Contractor/s fails/fail to employ the<br />

technical staff as a<strong>for</strong>esaid, he/they shall be liable to pay a reasonable amount not<br />

exceed<strong>in</strong>g a sum of Rs.2,000/-(Rupees Two thousand only) <strong>for</strong> each month of<br />

default <strong>in</strong> case of graduate eng<strong>in</strong>eer and Rs.1,000/- (Rs. One thousand only) <strong>for</strong><br />

each month of default <strong>in</strong> case of Diploma Holder.<br />

7.2.2 The decision of the Eng<strong>in</strong>eer-<strong>in</strong>-charge as to the period <strong>for</strong> which the required<br />

technical staff was not employed by the contractors and as to the reasonableness<br />

of the amount to be deducted on this account shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the<br />

Contractor.<br />

7.3 The said representatives shall be present at site dur<strong>in</strong>g work<strong>in</strong>g hours and any<br />

written orders or <strong>in</strong>structions which the purchaser's Eng<strong>in</strong>eer may give to the said<br />

representatives of the contractor shall be deemed to have been duly given or<br />

communicated to the contractor.<br />

7.4 The contractor or his representative will accompany the Purchaser's Eng<strong>in</strong>eer or<br />

Eng<strong>in</strong>eer on <strong>in</strong>spection or proceed to their offices whenever called upon to do so.<br />

8 MATERIAL SUPPLIED BY RAILWAYS<br />

8.1 All materials to be supplied by Railway are <strong>in</strong>dicated <strong>in</strong> the preamble and shall be<br />

supplied by Railway free of cost at Railway Depot as mentioned <strong>in</strong> Preamble.<br />

The price <strong>in</strong> schedule of work shall be exclusive of the cost of these items.<br />

8.2 The contractor shall furnish a stand<strong>in</strong>g <strong>in</strong>demnity bond <strong>for</strong> the materials and<br />

equipments supplied to him by Railways <strong>in</strong> Form No.6. (Section II Chapter 3).<br />

8.3 The quantity required would be determ<strong>in</strong>ed by the Railway accord<strong>in</strong>g to the<br />

quantum of work to be done. The Contractor shall be responsible <strong>for</strong> check<strong>in</strong>g<br />

be<strong>for</strong>e tak<strong>in</strong>g delivery that all the materials given to him are <strong>in</strong> good<br />

condition. The receipt of materials shall be acknowledged by the Contractor or<br />

his representative, mention<strong>in</strong>g details of materials and their quantities on a<br />

prescribed pro-<strong>for</strong>ma <strong>in</strong> Form No.10 enclosed. The left out/unused materials if<br />

any shall be returned to Railway Depot (as mentioned <strong>in</strong> Rate Schedule) by the<br />

Contractor <strong>for</strong> which no extra charges shall be paid by the Railway.<br />

8.4 The Contractor shall transport material supplied by Railways to the site of work<br />

as required and no cart<strong>in</strong>g charges shall be payable by Railways.<br />

Signature of contractor Page 59 of 127 Dy CSTE/IRPMU/Kanpur


8.5 RECONCILIATION OF MATERIALS SUPPLIED BY RAILWAYS:<br />

All the materials supplied by the Purchaser shall be correctly accounted <strong>for</strong><br />

and the quantities reconciled on completion of the work by the contractor. On<br />

completion of the work all surplus materials supplied by the Purchaser together<br />

with the ones found defective or that have became defective or broken on<br />

account of defective materials and/or workmanship shall be returned to him by the<br />

contractor.<br />

If the contractor fails to return excess and unused materials supplied by the<br />

railway or if there are any shortages dur<strong>in</strong>g f<strong>in</strong>al reconciliation, their cost there of<br />

shall be recovered by the Purchaser from the Contractor at the books rate plus<br />

railway freight, handl<strong>in</strong>g, load<strong>in</strong>g, supervision and other <strong>in</strong>cidental charges at the<br />

rates fixed by the railway to this will be added an <strong>in</strong>crease of 100%.<br />

9 MATERIAL SUPPLIED BY CONTRACTOR<br />

9.1 All materials required <strong>for</strong> the execution of the contract other than those<br />

specifically shown as be<strong>in</strong>g supplied by the Railways <strong>in</strong> this document shall be<br />

arranged and supplied by the contractor as detailed <strong>in</strong> the scope so as to realise<br />

the end objective.<br />

9.2 The list of the material (and their approximate quantity) to be supplied by the<br />

contractor have been <strong>in</strong>dicated <strong>in</strong> Schedule of requirement of quantities –<br />

Section 1 Chapter 3. The list is however, not limited and any other material as<br />

required <strong>for</strong> complet<strong>in</strong>g the work as per standard plans, draw<strong>in</strong>g etc. will be<br />

supplied by the contractor free of cost. The supply of equipment and materials<br />

shall also <strong>in</strong>clude required <strong>in</strong>stallation and other materials and documents etc.,<br />

which may not be specifically mentioned there<strong>in</strong>, but which are usually necessary<br />

<strong>for</strong> complet<strong>in</strong>g the work <strong>in</strong> all respects. In addition to the above, if any other petty<br />

material which may be considered necessary <strong>for</strong> execution of the work accord<strong>in</strong>g<br />

to specification of draw<strong>in</strong>g is required, the same shall be supplied by the<br />

contractor free of cost.<br />

9.3.1 The materials supplied and used by the contractor shall be of best available<br />

quality and shall con<strong>for</strong>m to relevant specifications, design and draw<strong>in</strong>gs duly<br />

<strong>in</strong>spected by RITES/RDSO/Railway consignee as the case may be.<br />

The materials to be supplied by the contractor as per schedule enclosed with the<br />

tender document will be procured from RDSO approved sources if the item<br />

appears <strong>in</strong> RDSO approved list as per guidel<strong>in</strong>e mentioned by RDSO <strong>in</strong> their<br />

booklet. In case of items not appear<strong>in</strong>g <strong>in</strong> RDSO approved list of material, the<br />

materials shall be supplied from reputed suppliers or their authorized<br />

representatives, shall be of best quality and shall con<strong>for</strong>m to relevant<br />

specifications, design and draw<strong>in</strong>gs duly <strong>in</strong>spected by RITES/RDSO/Railway<br />

Signature of contractor Page 60 of 127 Dy CSTE/IRPMU/Kanpur


consignee. The contractor may be required to produce test certificates from the<br />

manufacturers whenever called <strong>for</strong> by the Eng<strong>in</strong>eer <strong>in</strong> charge.<br />

9.4 Be<strong>for</strong>e procur<strong>in</strong>g the material to be supplied by contractor, the contractor shall<br />

submit the names and addresses of suppliers from whom it is proposed to procure<br />

the materials required to be supplied <strong>in</strong> the tender and shall take approval of<br />

railways <strong>for</strong> the same.<br />

9.6 CONSIGNEE<br />

The contractor should consign, if need be, all the materials to 'self' to the nearest<br />

stations where materials can be booked <strong>for</strong> stack<strong>in</strong>g be<strong>for</strong>e erection. Such items,<br />

where part payment is admissible on receipt by the Railway, can be booked to<br />

store godown of Sr. Section Eng<strong>in</strong>eer/Sig/IRPMU/Kanpur, from where the<br />

materials shall be handed over to the contractor <strong>for</strong> <strong>in</strong>stallation. All<br />

transportation charges to the site of work, taxes, octroi etc and all handl<strong>in</strong>g<br />

charges <strong>for</strong> each such item shall be borne by the contractor.<br />

10 OTHER RAILWAY STORES<br />

10.1 If any material other than those specified <strong>in</strong> para 8 above is supplied by the<br />

Railways either at the Contractor's request or suo motto <strong>in</strong> order to prevent any<br />

possible delay <strong>in</strong> the execution of the works likely to occur due to the<br />

Contractor's <strong>in</strong>ability to make adequate arrangements <strong>for</strong> supply thereof or<br />

otherwise, recovery will be made from Contractor's bill at 1.5 times the cost of<br />

procurement which is <strong>in</strong>clusive of freight or rate given <strong>in</strong> schedule whichever is<br />

higher. Freight between the Railway sources of supply and Railway<br />

Stores/depot shall be to the Contractor's account.<br />

10.2 If however, the material required by the Contractor is not available <strong>in</strong> Railways<br />

stock or the Railways decide not to supply the same, be that <strong>for</strong> whatever<br />

reasons, the Railway will not be bound to arrange <strong>for</strong> the supply at the cost<br />

quoted above or at any other cost nor will this fact be accepted as an excuse <strong>for</strong><br />

delay <strong>in</strong> execution of works.<br />

11 TEST & MEASURING INSTRUMENTS, SPECIAL TOOLS AND<br />

INSTALLATION MATERIAL<br />

11.1 Special tools and <strong>in</strong>struments required <strong>for</strong> <strong>in</strong>stallation and ma<strong>in</strong>tenance of all<br />

the equipment shall be arranged by the tenderer <strong>in</strong> adequate quantities. All<br />

<strong>in</strong>stallation material <strong>for</strong> complete commission<strong>in</strong>g of the system shall be<br />

provided by the tenderer. Details of special tools, their quantities and unit<br />

prices shall be <strong>in</strong>dicated.<br />

Signature of contractor Page 61 of 127 Dy CSTE/IRPMU/Kanpur


11.2 All tests and measur<strong>in</strong>g <strong>in</strong>struments and other arrangements required <strong>for</strong> all the<br />

acceptance tests shall be provided by the contractor free of cost.<br />

12. SUPPLY OF TECHNICAL LITERATURE, <strong>DOCUMENT</strong>ATION,<br />

DRAWINGS & COMPLETION PLANS ETC.<br />

12.1 The supply of equipment and materials shall <strong>in</strong>clude supply of two sets of pr<strong>in</strong>ted<br />

documents from the orig<strong>in</strong>al equipment manufacturers with each equipment. The<br />

documents should <strong>in</strong>clude all software documentation required <strong>for</strong> the equipment<br />

system.<br />

12.2 Except where pr<strong>in</strong>ted documents are supplied with each equipment by orig<strong>in</strong>al<br />

equipment manufacturer, all other documentation and <strong>in</strong><strong>for</strong>mation shall be<br />

prepared us<strong>in</strong>g CAD. All he documentation and draw<strong>in</strong>gs etc. shall be supplied<br />

<strong>in</strong> two sets of CD. The draw<strong>in</strong>gs etc. shall also be supplied <strong>in</strong> duplicate on J.K.<br />

Copier/ map litho white paper to facilitate tak<strong>in</strong>g out copies on pla<strong>in</strong> paper<br />

copier. In addition, four complete sets of such documents shall also be supplied<br />

<strong>for</strong> ready use duly bounded <strong>in</strong> good plastic folders.<br />

12.3 The supply of equipment and materials shall also <strong>in</strong>clude necessary<br />

documentation related to tra<strong>in</strong><strong>in</strong>g on the ma<strong>in</strong>tenance of equipment <strong>in</strong> sufficient<br />

number of copies and one CD to the extent specified elsewhere <strong>in</strong> this agreement.<br />

13. SPARES<br />

13.1 Railway shall consider the follow<strong>in</strong>g essential spares at 5% of the quantities used<br />

<strong>in</strong> the equipment subject to a m<strong>in</strong>imum of one. The requirement of essential<br />

spares will be <strong>in</strong>dicated <strong>in</strong> the schedule of requirement.<br />

In addition follow<strong>in</strong>g are to be supplied as spares:<br />

a) Software back up <strong>in</strong> two sets of floppies/CDs.<br />

b) Three times the quantity of fuses used <strong>in</strong> the equipment <strong>for</strong> each type.<br />

13.2 In addition to the essential spares, tenderer may <strong>in</strong>dicate additional<br />

recommended quantities of spares <strong>for</strong> efficient ma<strong>in</strong>tenance of the equipment<br />

and the systems <strong>for</strong> a period of 1 year to ensure that the quality & reliability is<br />

achieved. The details, unit price and the total cost of recommended spares shall<br />

be <strong>in</strong>cluded <strong>in</strong> the tender as an option. However, the cost of such recommended<br />

spares shall not be considered `<strong>for</strong> tender evaluation.<br />

14. LONG TERM AVAILABILITY OF SPARES AND SYSTEM SUPPORT<br />

Not applicable.<br />

Signature of contractor Page 62 of 127 Dy CSTE/IRPMU/Kanpur


15. QUALITY ASSURANCE<br />

Not applicable.<br />

16. REJECTION<br />

16.1 INSPECTING OFFICER – POWER OF REJECTION<br />

a) Be<strong>for</strong>e any stores or part thereof are submitted <strong>for</strong> <strong>in</strong>spection, to certify that they<br />

are not <strong>in</strong> accordance with the contract/ow<strong>in</strong>g to the adoption of any unsatisfactory<br />

method of manufacture.<br />

b) To reject any stores submitted as not be<strong>in</strong>g <strong>in</strong> accordance with the particulars.<br />

c) To reject the whole of the <strong>in</strong>stallment tendered <strong>for</strong> <strong>in</strong>spection if after <strong>in</strong>spection of<br />

such portion thereof, as he may <strong>in</strong> his discretion th<strong>in</strong>k fit, he is satisfied that the<br />

same is unsatisfactory.<br />

d) To mark the rejected stores with a rejection mark, so that they may be easily<br />

identified if resubmitted.<br />

The Inspect<strong>in</strong>g officer’s decision as regards the rejection shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on<br />

the contractor.<br />

16.2 CONSIGNEE’S RIGHT OF REJECTION<br />

Notwithstand<strong>in</strong>g any approval which the <strong>in</strong>spect<strong>in</strong>g Officer may have given <strong>in</strong> respect of<br />

the stores or any materials or the work or workmanship <strong>in</strong>volved <strong>in</strong> the per<strong>for</strong>mance of<br />

the contract (whether with or without any test carried out by the contractor or the<br />

<strong>in</strong>spect<strong>in</strong>g officer or under the direction of the Inspect<strong>in</strong>g officer) and notwithstand<strong>in</strong>g<br />

delivery of the stores where so provided to the <strong>in</strong>terim consignee it shall be lawful <strong>for</strong> the<br />

consignee, on behalf of the purchaser, to reject the stores or any part, portion of<br />

consignment there of with<strong>in</strong> a reasonable time after actual delivery thereof to him at the<br />

place or dest<strong>in</strong>ation fixed <strong>in</strong> the contract if such stores or part, portion of consignment<br />

thereof is not <strong>in</strong> all respects <strong>in</strong> con<strong>for</strong>mity with the terms and conditions of the contract<br />

whether on account of any loss, deterioration or damage be<strong>for</strong>e dispatch or delivery or<br />

dur<strong>in</strong>g transit or otherwise howsoever.<br />

16.3 REJECTED STORES<br />

When any stores delivered at the consignee’s depots are rejected, this shall be removed<br />

by the contractor with<strong>in</strong> 21 days from the date of rejection. Such rejected stores shall lie<br />

at the contractor’s risk from the date of rejection. If the stores are not removed by the<br />

Signature of contractor Page 63 of 127 Dy CSTE/IRPMU/Kanpur


contractor with<strong>in</strong> this period, the purchaser or his nom<strong>in</strong>ee shall have the right to dispose<br />

of such stores, as deemed fit, at the contractor’s risk and account.<br />

The purchaser shall also be entitled to recover from the contractor, handl<strong>in</strong>g and ground<br />

rent / demurrage and any other charges <strong>for</strong> the period the rejected stores are not removed<br />

after the a<strong>for</strong>ementioned period.<br />

Stores that have been dispatched by rail and rejected after arrival at dest<strong>in</strong>ation may be<br />

taken back by the contractor either at the station where they were rejected or at the station<br />

from which they were dispatched. If the contract is placed <strong>for</strong> delivery F.O.R. station of<br />

dispatch, the contractor shall pay the carriage charges on the rejected consignment at<br />

Public traffic Rates from the station of dispatch to the station where they were rejected. If<br />

the contractor prefers to take back the goods at the station from which they were<br />

dispatched, the goods shall, <strong>in</strong> addition, be booked back to him, freight to pay at Public<br />

Traffic Rates and at owner’s risk.<br />

16.4 CONSEQUENCES OF REJECTION<br />

If on the stores be<strong>in</strong>g rejected by the Inspect<strong>in</strong>g Officer or consignee at the dest<strong>in</strong>ation,<br />

the contractor fails to make satisfactory supplies with<strong>in</strong> the stipulated period of delivery,<br />

the purchaser shall be at liberty to:-<br />

a) Request the contractor to replace the rejected store <strong>for</strong>thwith but <strong>in</strong> any event not<br />

later than period of 21 days from the date of rejection and the contractor shall bear all the<br />

cost of such replacement, <strong>in</strong>clud<strong>in</strong>g freight, if any on such replac<strong>in</strong>g and replaced stores<br />

but without be<strong>in</strong>g entitled to any extra payment on that or any other account.<br />

b) Purchase or authorize the purchase of quantity of the stores, rejected or others of a<br />

similar description ( when stores exactly comply<strong>in</strong>g with the particulars are not readily<br />

available <strong>in</strong> the op<strong>in</strong>ion of the purchaser, which shall be f<strong>in</strong>al), without notice to the<br />

contractor, at his risk and cost and without affect<strong>in</strong>g the contractor’s liability as regards to<br />

the supply of any further <strong>in</strong>stallment due under the contract or.<br />

c) Cancel the contract and purchase or authorise the purchase of the stores or other of<br />

a similar description( when stores exactly comply<strong>in</strong>g with the particulars are not readily<br />

available, <strong>in</strong> the op<strong>in</strong>ion of the purchaser, which shall be f<strong>in</strong>al ) at the risk and cost of the<br />

contractor. In the event of action be<strong>in</strong>g taken under sub-clause above or this sub clause,<br />

the provisions relevant clauses of the General Conditions of contract, shall apply as far as<br />

applicable.<br />

Where under a contract, the price payable is fixed on F.O.B. part of export or F.O.R.<br />

dispatch<strong>in</strong>g station, the contractor shall, if the stores are rejected at the dest<strong>in</strong>ation by the<br />

consignee, be liable <strong>in</strong> addition to his other liabilities <strong>in</strong>clud<strong>in</strong>g refund of price<br />

Signature of contractor Page 64 of 127 Dy CSTE/IRPMU/Kanpur


ecoverable <strong>in</strong> respect of the stores so rejected, to reimburse to the purchase, the freight<br />

and all other expenses <strong>in</strong>curred by the purchase <strong>in</strong> this respect.<br />

17. INSPECTION OF MATERIALS<br />

17.1 All equipment, materials, fitt<strong>in</strong>gs and components will be subject to <strong>in</strong>spection by<br />

the purchaser or his representative at the manufacturer's premises be<strong>for</strong>e despatch<br />

except imported material which will be accepted based on Orig<strong>in</strong>al factory<br />

Acceptance Test Report and physical <strong>in</strong>spection at site/ store depot. No materials<br />

shall be dispatched from the manufacturer's premises until these are <strong>in</strong>spected and<br />

/or approved. Materials also be <strong>in</strong>spected by the purchaser or his representative at<br />

the contractor’s depot at the purchaser’s discretion. The purchaser or his<br />

representative shall have the right to be present dur<strong>in</strong>g all stages of manufacture,<br />

and shall be af<strong>for</strong>ded, free of charge all reasonable facilities <strong>for</strong> <strong>in</strong>spection and<br />

test<strong>in</strong>g so as to satisfy himself that the materials are <strong>in</strong> accordance with<br />

specifications, approved draw<strong>in</strong>g and designs.<br />

17.2 Materials appear<strong>in</strong>g <strong>in</strong> RDSO approved list as per IRS/RDSO design or<br />

specification shall be <strong>in</strong>spected by RDSO as per guidel<strong>in</strong>es mentioned <strong>in</strong> RDSO<br />

booklet regard<strong>in</strong>g the cost aspect of materials to be supplied. Telecomm items of<br />

ITD/TEC specification which are <strong>in</strong>spected by RDSO usually shall also be got<br />

<strong>in</strong>spected by RDSO as per guidel<strong>in</strong>es mentioned <strong>in</strong> RDSO booklets. Materials<br />

other than this will be <strong>in</strong>spected by Purchaser Eng<strong>in</strong>eer or his<br />

representative/RITES. Inspection by Purchaser’s representative will be at<br />

factory/site.<br />

17.3 All materials that are not covered under the specification, designs and draw<strong>in</strong>gs<br />

of RDSO/TEC etc. shall be procured from the reputed manufacturers or their<br />

authorised dealers. Such materials are to be approved by the purchaser’s<br />

Eng<strong>in</strong>eer. The Contractor may be required to produce test certificate from the<br />

manufacturer wherever called <strong>for</strong> by the Eng<strong>in</strong>eer.<br />

17.4 Dur<strong>in</strong>g the execution of the contract, samples may be taken from all the<br />

materials employed <strong>for</strong> the purpose of test and/or analysis under the conditions<br />

laid down <strong>in</strong> specification; such samples to be prepared <strong>for</strong> test<strong>in</strong>g and<br />

<strong>for</strong>warded to the test<strong>in</strong>g entity shall be free of all costs to the Railway.<br />

17.5 The decision of the purchaser or his successor shall be f<strong>in</strong>al <strong>in</strong> respect of<br />

acceptability or otherwise of any material, equipment etc. required <strong>for</strong> the work.<br />

17.6 The cost of <strong>in</strong>spection of equipment and materials, all tests and/or analysis<br />

per<strong>for</strong>med shall be borne by the Contractor.<br />

17.7 All expenses of the purchasers representative shall be borne by the purchaser<br />

whether the <strong>in</strong>spected materials is utilised <strong>in</strong> the work or not.<br />

Signature of contractor Page 65 of 127 Dy CSTE/IRPMU/Kanpur


17.8 In case any material be found not accord<strong>in</strong>g to the standard specifications after<br />

delivery at site, the contractor shall immediately remove such materials with<strong>in</strong> 48<br />

hours from Railway premises at his own cost.<br />

18. INSPECTION OF WORKS<br />

18.1 The Eng<strong>in</strong>eer or his representative may <strong>in</strong>spect and test the various portions of the<br />

work at all stages and shall have full power to reject all or any portion of the<br />

work that he may consider to be defective or <strong>in</strong>ferior <strong>in</strong> quality of materials<br />

workmanship of design <strong>in</strong> comparison to what is called <strong>for</strong> <strong>in</strong> the specification.<br />

18.2 All material brought to site can be erected only after <strong>in</strong>spection and acceptance by<br />

the Eng<strong>in</strong>eer <strong>in</strong> charge or his authorised representative. Similarly, dur<strong>in</strong>g the<br />

execution of the contract, samples may be taken <strong>for</strong> the purpose of test and/or<br />

analysis under the conditions laid down <strong>in</strong> specification, such samples to be<br />

prepared <strong>for</strong> test<strong>in</strong>g and <strong>for</strong>warded free of all cost to the Railway. The contractor<br />

shall carryout such tests at the cost as are necessary <strong>in</strong> the op<strong>in</strong>ion of the Railway to<br />

ensure necessary compliance of the specifications of the contractor.<br />

18.3 In the event of rejection of any work already executed and not <strong>in</strong> accordance<br />

with specification as <strong>in</strong> this tender and/or as determ<strong>in</strong>ed by the Eng<strong>in</strong>eer or<br />

which the Contractor has been apprised, the Contractor shall carry out<br />

alterations/replacements to such works to the satisfaction of the Eng<strong>in</strong>eer <strong>for</strong> which<br />

no additional expenses will be borne by the Railway.<br />

18.4 Be<strong>for</strong>e the cables are actually laid contractor's representative and the<br />

Eng<strong>in</strong>eer's representative shall jo<strong>in</strong>tly <strong>in</strong>spect the quality and depth of trenches,<br />

chases, quality of bricks and arrangements <strong>for</strong> tamped fill<strong>in</strong>g. The measurements<br />

of length <strong>for</strong> all these items will be suitably recorded by the Eng<strong>in</strong>eer's<br />

representative who will permit the lay<strong>in</strong>g of cables after issu<strong>in</strong>g the certificates <strong>in</strong><br />

Form No.9 (Section II Chapter 3) that the above works have been done as required<br />

by the Specifications.<br />

18.5 Inspection of completed works<br />

The contractor shall advise the railway 15 days <strong>in</strong> advance the time when his<br />

portion of the work will be completed by him and be ready <strong>for</strong> <strong>in</strong>spection. The<br />

Railway will make <strong>in</strong>spection after the advice of completion of work is received<br />

from the Contractor.<br />

Although the contractor’s portion of the work shall be <strong>in</strong>spected by the Railway as<br />

<strong>in</strong>dicated above, it is possible that certa<strong>in</strong> defects may appear at the time of<br />

Signature of contractor Page 66 of 127 Dy CSTE/IRPMU/Kanpur


<strong>in</strong>stallation. The Contractor shall be responsible to rectify these defects to the<br />

satisfaction of the Railway.<br />

Dur<strong>in</strong>g <strong>in</strong>spection of <strong>in</strong>stallation by Railway Eng<strong>in</strong>eer the contractor shall make<br />

such tests as would be necessary to demonstrate to the satisfaction of the Railway<br />

that the work as completed by him is <strong>in</strong> accordance with the specifications of the<br />

contract. The contractor shall provide such <strong>in</strong>struments and apparatus as may be<br />

necessary <strong>for</strong> mak<strong>in</strong>g these tests.<br />

19. QUANTUM OF WORK AND VARIATION IN QUANTITIES<br />

19.1 The quantities of various items given <strong>in</strong> the schedules <strong>for</strong> the works to be<br />

executed are only approximate and are only <strong>for</strong> the guidance of the contractor. As<br />

far as possible, they have been assessed correctly but are likely to vary dur<strong>in</strong>g the<br />

execution of the work.<br />

19.2 Individuals NS items <strong>in</strong> contracts shall be operated with variation of plus or m<strong>in</strong>us<br />

25% and payment would be made as per the agreement rate.<br />

19.4 The limit <strong>for</strong> vary<strong>in</strong>g quantities <strong>for</strong> m<strong>in</strong>or value items shall be 100% (as aga<strong>in</strong>st<br />

25% prescribed <strong>for</strong> other items). A m<strong>in</strong>or value item <strong>for</strong> this purpose is def<strong>in</strong>ed as<br />

an item whose orig<strong>in</strong>al agreement value is less than 1% of the total orig<strong>in</strong>al<br />

agreement value.<br />

19.5 As far as SOR items are concerned, the limit of 25% would apply to the value of<br />

SOR schedule as a whole and not on <strong>in</strong>dividual SOR items. However, <strong>in</strong> case of<br />

NS items, the limit of 25% would apply on the <strong>in</strong>dividual items irrespective of the<br />

manner of quot<strong>in</strong>g the rate (s<strong>in</strong>gle percentage rate or <strong>in</strong>dividual item rate).<br />

19.6 No such quantity variation limit shall apply <strong>for</strong> foundation items.<br />

19.4 When the gross value of the work to be executed is likely to <strong>in</strong>crease <strong>in</strong> excess of<br />

25% of the orig<strong>in</strong>al value of the agreement, the contractor should notify the<br />

Eng<strong>in</strong>eer <strong>in</strong> –charge at least THIRTY DAYS be<strong>for</strong>e such necessity arises.<br />

19.5 Railway reserves the right to refix the rates, by mutual consent, of those items <strong>in</strong><br />

the schedule, where the quantities have exceeded by 25% of the agreemental<br />

quantities.<br />

19.6 An undertak<strong>in</strong>g shall be given to the effect that additional quantities up to 25% of<br />

the contract value at the same unit rates shall be supplied by the tenderer <strong>in</strong> case<br />

order <strong>for</strong> the additional quantity is placed with<strong>in</strong> the currency period of contract.<br />

It should be noted that this excludes additional quantities that may be required as<br />

warranty or replacement due to defective design and manufacture etc. On this<br />

Signature of contractor Page 67 of 127 Dy CSTE/IRPMU/Kanpur


account, the responsibility of the tenderer under the warranty clause will not be<br />

diluted <strong>in</strong> any way.<br />

20. ADDITION/REDUCTION OF QUANTITIES OF WORK<br />

If dur<strong>in</strong>g the execution of the work the contractor is called upon to carry out any<br />

new work not <strong>in</strong>cluded <strong>in</strong> orig<strong>in</strong>al scope of work, it should not be executed be<strong>for</strong>e<br />

a rate has been agreed to by the Railways <strong>in</strong> the manner as <strong>in</strong>dicated <strong>in</strong> General<br />

Conditions of Contract and Instructions <strong>for</strong> tenders of the Engg. Department of<br />

Railways.<br />

The successful tenderer will, however, have no claims or right <strong>in</strong> the execution of<br />

any work which <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer should be carried out<br />

departmentally or otherwise and the Railway reserves the right any time be<strong>for</strong>e or<br />

after the acceptance of the tender to keep back from the contract and carry out the<br />

work or portion of work through any other agent it may th<strong>in</strong>k fit without assign<strong>in</strong>g<br />

any reason. No claim <strong>for</strong> compensation / loss or what so ever on this account will<br />

be enterta<strong>in</strong>ed by the Railway.<br />

21. SUBLETTING AND ASSIGNMENT<br />

21.1 The contractor may sublet a part of the works under this contract and enter <strong>in</strong>to<br />

contract with suppliers <strong>for</strong> supply of materials only with the approval of the<br />

Railway adm<strong>in</strong>istration.<br />

21.2 The names of all sub contractors proposed to be employed <strong>for</strong> execution of work<br />

or any part thereof <strong>in</strong>clud<strong>in</strong>g manufactur<strong>in</strong>g of equipment and other materials<br />

shall be submitted by the contractor to the purchaser and got approved by him<br />

be<strong>for</strong>e the contractor enter <strong>in</strong>to a agreement with the sub contractor <strong>for</strong> the<br />

purpose.<br />

21.3 The contractor shall arrange <strong>for</strong> effective supervision of sub contractor's work and<br />

rema<strong>in</strong> solely responsible <strong>for</strong> materials supplied and <strong>for</strong> works carried out on his<br />

behalf by the sub contractor.<br />

21.4 The contractor shall not, save with the previous consent <strong>in</strong> writ<strong>in</strong>g of the<br />

Purchaser, sublet, transfer or assign the contract or any part thereof or <strong>in</strong>terest<br />

there<strong>in</strong> or benefit or advantage thereof any manner whatsoever.<br />

21.5 In the event of the Contractor's sublett<strong>in</strong>g or assign<strong>in</strong>g this contract or any part<br />

thereof without such permission, the purchaser shall be entitled to cancel the<br />

contract and to purchase the stores elsewhere on the contractor's account and risk<br />

and the contractor shall be liable <strong>for</strong> any loss or damage which the purchaser<br />

may susta<strong>in</strong> <strong>in</strong> consequence or aris<strong>in</strong>g out of such purpose.<br />

Signature of contractor Page 68 of 127 Dy CSTE/IRPMU/Kanpur


22. EXECUTION OF WORK<br />

All the work shall be executed <strong>in</strong> strict con<strong>for</strong>mity to the provisions of the<br />

contract document and accord<strong>in</strong>g to detailed draw<strong>in</strong>gs, specifications and<br />

<strong>in</strong>structions as may be approved from time to time by Railway based on<br />

detailed design and eng<strong>in</strong>eer<strong>in</strong>g carried out by contractor <strong>in</strong> l<strong>in</strong>e with<br />

requirements as per contract document. The contractor shall be responsible <strong>for</strong><br />

ensur<strong>in</strong>g that the work throughout are executed <strong>in</strong> the most substantial, proper<br />

and workman like manner with the quality of material and workmanship <strong>in</strong><br />

strict accordance with the specifications and as per sound <strong>in</strong>dustrial practices and<br />

to the entire satisfaction of the Railway. In case of any doubts regard<strong>in</strong>g any<br />

particulars of construction and any ambiguities <strong>in</strong> the plans, the decision of the<br />

purchaser’s eng<strong>in</strong>eer shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor.<br />

23. PROGRESS REPORTING<br />

23.1 The contractor shall submit to Railways at his own cost periodic progress<br />

reports at regular <strong>in</strong>tervals regard<strong>in</strong>g the state and progress of work. The<br />

details and pro-<strong>for</strong>ma of the report will mutually be agreed after award of the<br />

Contract. Such reports shall be <strong>for</strong> daily man power, equipment and plant<br />

development, weekly work progress and monthly progress review reports. All<br />

actions as directed by Railway pursuant to such reports shall be promptly attended<br />

to by Contractor.<br />

23.2 The purchaser’s eng<strong>in</strong>eer shall also conduct monthly meet<strong>in</strong>gs with the<br />

contractor to assess and review the programme of works. The action proposed to<br />

progress the work as planned, difficulties, assistance required etc. shall be<br />

clearly brought out and remedial action taken. The m<strong>in</strong>utes of these meet<strong>in</strong>gs<br />

shall be jo<strong>in</strong>tly signed by Railways and contractor.<br />

24. MAINTENANCE OF WORKS<br />

24.1 The contractor shall at all times dur<strong>in</strong>g the progress and cont<strong>in</strong>uance of the works<br />

and also <strong>for</strong> the period of ma<strong>in</strong>tenance specified <strong>in</strong> the tender <strong>for</strong>m and after the<br />

date of pass<strong>in</strong>g of the certificate of completion by the Railway's representative or<br />

any other earlier date subsequent to the completion of the works that may be<br />

fixed by Railway's representative be responsible <strong>for</strong> and effectively ma<strong>in</strong>ta<strong>in</strong> and<br />

uphold <strong>in</strong> good, substantial, sound and perfect condition all and every part of the<br />

works and shall make good from time to time and at all times, as often as<br />

the Railway's representative shall require, any damage or defect that may dur<strong>in</strong>g<br />

the above period arise <strong>in</strong> or be discovered or be <strong>in</strong> any way connected with the<br />

works, provided that such damage or defect is not directly caused by errors<br />

<strong>in</strong> the contract documents, act of providence or <strong>in</strong>struction or civil riot, and the<br />

Signature of contractor Page 69 of 127 Dy CSTE/IRPMU/Kanpur


contractor shall be liable <strong>for</strong> and shall pay and make good to the Railways or<br />

other persons legally entitled thereto whenever required by the Railway's<br />

representative so to do, all losses, damages, costs and expenses they or any of<br />

them may <strong>in</strong>cur or be put or be liable to, by reason or <strong>in</strong> consequence of the<br />

operations of the contractor or his failure <strong>in</strong> any respect.<br />

24.2 ANNUAL MAINTENANCE CONTRACT<br />

24.2.1 The tenders have to quote <strong>for</strong> a year wise comprehensive Annual ma<strong>in</strong>tenance<br />

Contract <strong>for</strong> 1(one) year to be signed at the end of warranty period, if so specified<br />

<strong>in</strong> the tender schedule.<br />

24.2.2 The Railway can consider award<strong>in</strong>g the AMC and extend<strong>in</strong>g it <strong>for</strong> a period of<br />

further four years at the end of first year of AMC contract at the same rates, terms<br />

and conditions. Railway further reserves the right of term<strong>in</strong>ation of AMC by<br />

serv<strong>in</strong>g three months notice as and when considered necessary.<br />

24.2.3 If railways decide to extend the AMC period, the bank guarantee <strong>for</strong> the AMC<br />

will have to be renewed be<strong>for</strong>e the expiry of the AMC.<br />

24.2.4 Dur<strong>in</strong>g AMC, the contractor has to ensure the supervision of operations &<br />

ma<strong>in</strong>tenance of the Technical specification.<br />

24.2.5 No separate charges shall be paid <strong>for</strong> visit of eng<strong>in</strong>eers <strong>for</strong> attend<strong>in</strong>g to faults and<br />

repairs or towards the supply of spare parts.<br />

24.2.6 Dur<strong>in</strong>g the warranty, the bidder shall per<strong>for</strong>m all the functions as enunciated<br />

under the AMC, free of cost.<br />

24.2.7. The tenderer shall, at the time of submitt<strong>in</strong>g the offer, submit the proposal<br />

specify<strong>in</strong>g as to how he proposes <strong>for</strong> carry<strong>in</strong>g out the proper repairs under AMC.<br />

He shall also <strong>in</strong>dicate what spares will be kept <strong>in</strong> different locations. The tenderer<br />

shall also <strong>in</strong>dicate as how he proposes to meet the obligations under AMC. His<br />

action plan to deal with the various situations aris<strong>in</strong>g out of hardware and<br />

software fault shall also be clearly <strong>in</strong>dicated.<br />

24.2.8 Indian Railways shall <strong>in</strong>timate the contractor about the problem occurrence <strong>in</strong><br />

case the vendor’s assistance is required. Even <strong>for</strong> remote locations the contractors<br />

shall <strong>in</strong>dicate his support offices, so as to attend the problem <strong>in</strong> earliest possible<br />

time.<br />

24.2.9 Fail<strong>in</strong>g to provide services as mentioned <strong>in</strong> above clause, the contractor shall be<br />

liable to a token penalty @<br />

Signature of contractor Page 70 of 127 Dy CSTE/IRPMU/Kanpur


‣ Rs. 1000/- per hour after expiry of 6 hours after <strong>in</strong>timation to contractor about the<br />

problem<br />

A cumulative loss to Railways may be much more but only token penalty have<br />

been imposed just to emphasize the criticality of the equipment.<br />

24.2.10 Tenderer shall specify to Railways, the telephone number/Fax/Pager/E-mail,<br />

name, office and residential address of the support officials proposed to be<br />

located by the contractor at centralized site nearest to the <strong>in</strong>stallation sites, so<br />

that demand can be lodged by Railway on round the clock basis <strong>for</strong> replacement<br />

of the defective card and request <strong>for</strong> site assistance, if any.<br />

24.2.11 The payment <strong>for</strong> AMC shall be made quarterly on expiry of the satisfactory<br />

ma<strong>in</strong>tenance after deduction of penalty charges leviable as per above clauses.<br />

24.2.12 A separate ma<strong>in</strong>tenance contract, at mutually agreed terms and conditions, on<br />

above guidel<strong>in</strong>es, shall be f<strong>in</strong>alised at the quoted rate.<br />

24.2.13 The bank guarantee as required to be submitted <strong>for</strong> AMC per<strong>for</strong>mance<br />

guarantee shall be returned to the contractor after deduct<strong>in</strong>g penalty as<br />

mentioned above and without any <strong>in</strong>terest on expiry/term<strong>in</strong>ation of AMC<br />

agreements.<br />

25 CLEARANCE OF SITE<br />

25.1 Contractor at his own expenses clean the site, set out all works and provide all<br />

necessary labours, pegs, str<strong>in</strong>g, steel to enable the purchaser or any of his<br />

representatives to check all sett<strong>in</strong>g out and the contractor will correct all errors at<br />

his own expenses.<br />

25.2 At the end of the work <strong>in</strong> each section the contractor shall as a part of his<br />

contractual obligation leave the area completely cleared of rubbish and obstructions<br />

of all k<strong>in</strong>ds accord<strong>in</strong>g to the <strong>in</strong>structions of the Railway's representatives. Besides,<br />

he shall take execution of work to avoid the presence of loose earth and ballast on<br />

plat<strong>for</strong>ms, <strong>in</strong> dra<strong>in</strong>s, on the track <strong>for</strong>mation and pathways <strong>in</strong> the vic<strong>in</strong>ity. If with<strong>in</strong><br />

<strong>for</strong>tnight of completion of the particular item of site work, the refuge is not cleared,<br />

the Railway will arrange to get them removed at the cost of the Contractor.<br />

However, be<strong>for</strong>e the Railway actually gets the site cleared, <strong>in</strong>timation <strong>in</strong> writ<strong>in</strong>g<br />

shall be sent to the Contractor.<br />

Signature of contractor Page 71 of 127 Dy CSTE/IRPMU/Kanpur


26. PROVISIONAL ACCEPTANCE<br />

26.1 Immediately after the completion of the work at each station or after<br />

completion of work <strong>in</strong> a block section here<strong>in</strong> after referred as sub-section, the<br />

contractor shall certify and advise the purchaser <strong>in</strong> writ<strong>in</strong>g that the <strong>in</strong>stallation<br />

is (i) complete, (ii) ready <strong>for</strong> satisfactory service and (iii) ready to be handed<br />

over. He will also place at the disposal of the purchaser the required staff <strong>for</strong><br />

<strong>in</strong>spection, test<strong>in</strong>g and putt<strong>in</strong>g it <strong>in</strong>to operation.<br />

26.2 The test or tests specified <strong>in</strong> Technical specification will be conducted jo<strong>in</strong>tly by<br />

the purchaser and contractor as soon as possible after receipt of advice of<br />

completion of one sub-section by the purchaser from the contractor. The<br />

test schedule shall be furnished by the tenderer which will be modified by<br />

mutual discussion between the contractor and Railway be<strong>for</strong>e f<strong>in</strong>alisation.<br />

Any component, modules, sub-assemblies or equipment fail<strong>in</strong>g dur<strong>in</strong>g the<br />

commission<strong>in</strong>g test shall be replaced/repaired free of cost by the tenderer.<br />

26.3 Purchaser's Eng<strong>in</strong>eer shall issue a Provisional Acceptance certificate <strong>for</strong><br />

successful commission<strong>in</strong>g of whole system cover<strong>in</strong>g all materials and services<br />

<strong>in</strong>cluded <strong>in</strong> the Schedule of works, after the f<strong>in</strong>al acceptance test as per the<br />

approved test procedure have been completed and the per<strong>for</strong>mance has been<br />

found to meet the specifications. Railways decision <strong>in</strong> this respect shall be f<strong>in</strong>al.<br />

The Provisional acceptance certificate shall be signed by both the parties.<br />

26.4 The Purchaser's Eng<strong>in</strong>eer may issue such a certificate with respect to any part of<br />

the works be<strong>for</strong>e the completion of the whole of the works or with respect to any<br />

substantial part of the works which has been both completed to the satisfaction<br />

of the Purchaser's Eng<strong>in</strong>eer and occupied or used by the Railway and when any<br />

such certificate is given <strong>in</strong> respect of a part of the works, such part shall be<br />

considered as completed.<br />

26.5 Should the result/s of <strong>in</strong>spection and test be not satisfactory, an extension of<br />

one month will be granted to the contractor to make good the defects and<br />

deficiencies po<strong>in</strong>ted out by the purchaser. Fresh <strong>in</strong>spection and test will then<br />

be carried out after the contractor has attended to the defects and<br />

deficiencies. If these tests are also not satisfactory the purchaser may proceed<br />

at the contractor's expense by all means deemed expedient, to have the<br />

<strong>in</strong>stallation made satisfactory until they comply with the specifications, and<br />

approved draw<strong>in</strong>gs and designs.<br />

26.6 In such a case or <strong>in</strong> the case of delay <strong>in</strong> complet<strong>in</strong>g the work under this contract<br />

with<strong>in</strong> the time limit the purchaser reserves the right, if he deems it possible<br />

to use <strong>in</strong> a reasonable manner any part of the <strong>in</strong>stallation even if some<br />

<strong>in</strong>stallations are not completely erected. The purchaser will give to the contractor<br />

Signature of contractor Page 72 of 127 Dy CSTE/IRPMU/Kanpur


<strong>for</strong> this purpose 7 days previous notice. The contractor shall then take at his own<br />

expense all necessary steps to complete the work <strong>in</strong> accordance with the<br />

provisions of the contract. In case it becomes impossible to proceed with the<br />

above mentioned tak<strong>in</strong>g over tests or reasons other than <strong>for</strong> which the contractor<br />

is responsible, the Provisional Acceptance Certificate shall be issued at or with<strong>in</strong><br />

a mutually agreed reasonable period not exceed<strong>in</strong>g six months after completion of<br />

<strong>in</strong>stallation.<br />

26.7 The issue of provisional acceptance will not be withheld <strong>for</strong> rectification of<br />

m<strong>in</strong>or defects as dist<strong>in</strong>ct from rejected equipment, which may not be<br />

essential <strong>for</strong> commission<strong>in</strong>g and operation of the <strong>in</strong>stallation. In such cases,<br />

only the value of the materials and cost of the rectification of the m<strong>in</strong>or defects<br />

shall be withheld from the payments on provisional acceptance until rectification<br />

is completed.<br />

27. PLACING IN SERVICE & MAINTENANCE SUPERVISION<br />

27.1 After the equipment has been commissioned & placed <strong>in</strong> service and<br />

Provisional Acceptance certificate issued by Purchaser's Eng<strong>in</strong>eer, the<br />

contractor shall be responsible <strong>for</strong> proper ma<strong>in</strong>tenance supervision of the<br />

equipment <strong>for</strong> a period of 12 months from the date of commission<strong>in</strong>g. For this<br />

purpose he shall prepare a ma<strong>in</strong>tenance plan and make available the services<br />

of qualified ma<strong>in</strong>tenance eng<strong>in</strong>eer stationed at the location approved by<br />

Purchaser's Eng<strong>in</strong>eer who will guide and supervise the work of Railways<br />

ma<strong>in</strong>tenance staff.<br />

27.2 Dur<strong>in</strong>g this period of ma<strong>in</strong>tenance supervision if any lacuna is noticed <strong>in</strong> the<br />

function<strong>in</strong>g as a result of any defect <strong>in</strong> design or manufacture, the same will be<br />

rectified by the contractor free of cost. Dur<strong>in</strong>g such rectification if any faulty<br />

equipment/modules need replacement or repair, they shall be provided by the<br />

contractor at his cost. The contractor shall br<strong>in</strong>g to the site of <strong>in</strong>stallation a set of<br />

equipment or modules <strong>in</strong> addition to all the materials to be supplied aga<strong>in</strong>st this<br />

contract as spares dur<strong>in</strong>g commission<strong>in</strong>g to circumvent any delay <strong>in</strong><br />

commission<strong>in</strong>g on this account.<br />

Use of spare modules covered under the Schedule of material of this tender shall<br />

not be permitted to be used dur<strong>in</strong>g <strong>in</strong>stallation, commission<strong>in</strong>g and ma<strong>in</strong>tenance<br />

supervision period without personal approval of Chief Signal &<br />

Telecommunication Eng<strong>in</strong>eer/IRPMU, New Delhi. Spares, so issued under<br />

unusual circumstances, should be replaced by the firm with<strong>in</strong> seven days of their<br />

issue.<br />

The scope of ma<strong>in</strong>tenance supervision will cover all equipment (supplied by the<br />

contractor) under warranty.<br />

Signature of contractor Page 73 of 127 Dy CSTE/IRPMU/Kanpur


28. FINAL ACCEPTANCE<br />

28.1 The f<strong>in</strong>al acceptance of the entire equipment <strong>in</strong>stalled <strong>in</strong> the section shall take<br />

effect from the date of expiry of the period of ma<strong>in</strong>tenance supervision as def<strong>in</strong>ed<br />

<strong>in</strong> para- 27 or the expiry of the last of the respective period of Ma<strong>in</strong>tenance<br />

Supervision of various sections <strong>for</strong> which Provisional Acceptance Certificates<br />

are issued or brought <strong>in</strong>to full fledged operation, provided that the contractor<br />

has complied fully with his obligations under clause 27 <strong>in</strong> respect of each<br />

section under the contract.<br />

28.2 If on the other hand the contractor has not so complied with his obligation under<br />

para 27 <strong>in</strong> respect of any section, the purchaser may either extend the period of<br />

ma<strong>in</strong>tenance supervision <strong>in</strong> respect of that section until the necessary works are<br />

carried out by the contractor or carry out those works suo moto on behalf of the<br />

contractor at the contractor's expenses. After expiry of the period of<br />

ma<strong>in</strong>tenance supervision <strong>for</strong> each section, a certificate of F<strong>in</strong>al Acceptance <strong>for</strong><br />

the section shall be issued by the purchaser and the last of such certificate will be<br />

called the Last and F<strong>in</strong>al Acceptance Certificate. The contract shall not be<br />

considered as completed until the issue of F<strong>in</strong>al Acceptance Certificate by<br />

the purchaser.<br />

28.3 The purchaser shall not be liable to the contractor <strong>for</strong> any dispute aris<strong>in</strong>g out of<br />

or <strong>in</strong> connection with the contract or execution of the work unless the contractor<br />

have made a claim <strong>in</strong> writ<strong>in</strong>g <strong>in</strong> respect thereof be<strong>for</strong>e the issue of F<strong>in</strong>al<br />

Acceptance Certificate under this clause. The contractor shall be debarred from<br />

disput<strong>in</strong>g the correctness of the items caused by the no claim certificate or<br />

demand<strong>in</strong>g a reference to Arbitration <strong>in</strong> respect thereof.<br />

28.4 Notwithstand<strong>in</strong>g the issue of F<strong>in</strong>al Acceptance Certificate, the contractor and the<br />

purchaser (subject to Sub Clause as above) shall rema<strong>in</strong> liable <strong>for</strong> fulfilment of<br />

any obligation <strong>in</strong>curred under the provision of the contract prior to the issue of<br />

F<strong>in</strong>al Acceptance Certificate which rema<strong>in</strong>s unper<strong>for</strong>med at the time such<br />

certificate is issued and <strong>for</strong> determ<strong>in</strong><strong>in</strong>g the nature and extent of such<br />

obligation, the contract shall be deemed to rema<strong>in</strong> <strong>in</strong> <strong>for</strong>ce between the parties<br />

hereto.<br />

29. WARRANTY<br />

29.1 All equipment and system supplied by the Contractor shall be guaranteed aga<strong>in</strong>st<br />

the defects/faults <strong>in</strong> design, material, workmanship and manufacture etc. <strong>for</strong> a<br />

period of 12 (twelve) months from the date of commission<strong>in</strong>g of work and plac<strong>in</strong>g<br />

<strong>in</strong> service. The date of the commission<strong>in</strong>g of the work will be after the sign<strong>in</strong>g of<br />

the provisional acceptance certificate by both the parties as per details at clause<br />

26(26.3) above.<br />

Signature of contractor Page 74 of 127 Dy CSTE/IRPMU/Kanpur


29.2 Dur<strong>in</strong>g the period of warranty, the contractor shall rema<strong>in</strong> responsible to arrange<br />

replacement and <strong>for</strong> sett<strong>in</strong>g right at his own cost any equipment <strong>in</strong>stalled by him<br />

which is of defective manufacture or design or becomes unworkable due to any<br />

cause whatsoever. The decision of the Railway's representative <strong>in</strong> this regard to<br />

direct the contractor to attend to any damage or defect <strong>in</strong> work shall be f<strong>in</strong>al and<br />

b<strong>in</strong>d<strong>in</strong>g on the Contractor.<br />

29.3 Dur<strong>in</strong>g the period of warranty, the contractor shall be responsible to the extent<br />

expressed <strong>in</strong> this clause <strong>for</strong> any defects that may develop under the conditions<br />

provided <strong>for</strong> by the contract and under proper use, aris<strong>in</strong>g from faulty materials,<br />

design of workmanship <strong>in</strong> the plant, or from faulty execution of the plant by the<br />

contractor but not otherwise and shall remedy such defects at his own cost<br />

when called upon to do so by the Purchaser who shall state <strong>in</strong> writ<strong>in</strong>g <strong>in</strong> what<br />

respect the portion is faulty.<br />

29.4 If it becomes necessary <strong>for</strong> the contractor to replace or renew any defective<br />

portions of the system under this clause the provisions of this clause shall apply<br />

to the portions of the plant to be replaced or renewed until the expiration of<br />

twelve months from the date of such replacement or renewal or until the end of<br />

the warranty period whichever may be later. If any defect is not remedied with<strong>in</strong><br />

reasonable time, the purchaser may proceed to do the work at contractor's risk<br />

and expense, but without prejudice to any other rights which the purchaser<br />

may have aga<strong>in</strong>st the contractor <strong>in</strong> respect of such defects.<br />

29.5 If the replacement or renewal are of such a character as may affect the efficiency<br />

of the system the purchaser shall have the right to give to the contractor with<strong>in</strong><br />

one month from such replacement or renewal notice <strong>in</strong> writ<strong>in</strong>g <strong>for</strong> the tests to<br />

be carried out. The cost of all such tests shall be borne by the contractor.<br />

29.6 All <strong>in</strong>spections, adjustments, replacements or renewals carried out by the<br />

contractor dur<strong>in</strong>g the supervised ma<strong>in</strong>tenance period shall be <strong>gov</strong>erned by the<br />

special conditions of this contract.<br />

29.7 Until the f<strong>in</strong>al certificate shall have been issued, the contractor shall have the right<br />

of entry, at his own risk and expense, by himself or his duly authorised<br />

representatives, whose names shall have previously been communicated <strong>in</strong><br />

writ<strong>in</strong>g to the purchaser at all reasonable work<strong>in</strong>g hours upon all necessary<br />

parts of the works <strong>for</strong> the purpose of <strong>in</strong>spect<strong>in</strong>g the work<strong>in</strong>g and the records of<br />

the system and tak<strong>in</strong>g notes there from and, if he desires at his own risk and<br />

expense, mak<strong>in</strong>g any tests subject to the approval of the purchaser which shall<br />

not be unreasonably withheld.<br />

30. TRAINING<br />

Signature of contractor Page 75 of 127 Dy CSTE/IRPMU/Kanpur


30.1 The tenderer shall undertake to tra<strong>in</strong> Railway eng<strong>in</strong>eers and other staff<br />

nom<strong>in</strong>ated by the Railways <strong>in</strong> different aspects of equipments function<strong>in</strong>g, field<br />

<strong>in</strong>stallation, test<strong>in</strong>g, commission<strong>in</strong>g, operation, ma<strong>in</strong>tenance and repair,<br />

cover<strong>in</strong>g both hardware and software.<br />

30.2 The contractor shall at every stage of <strong>in</strong>stallation, test<strong>in</strong>g and commission<strong>in</strong>g shall<br />

provide all facilities <strong>for</strong> adequate tra<strong>in</strong><strong>in</strong>g of Railway personnel who may be<br />

deputed to work on the project.<br />

31. INFRINGEMENT OF PATENTS<br />

(a)<br />

(b)<br />

The Contractor is <strong>for</strong>bidden to use any patents or registered draw<strong>in</strong>gs, processes<br />

or patterns <strong>in</strong> fulfill<strong>in</strong>g his contract without the previous consent <strong>in</strong> writ<strong>in</strong>g of the<br />

owner of such patents, draw<strong>in</strong>gs, patterns or trade marks, except where these<br />

are specified by the purchaser himself. Royalties where payable <strong>for</strong> the use of<br />

such patented processes, registered draw<strong>in</strong>gs or patterns shall be borne<br />

exclusively by the Contractor. The Contractor shall advise the purchaser of any<br />

proprietary rights that may exist on such processes, draw<strong>in</strong>gs or patterns which he<br />

may use of his own accord.<br />

In the case of patents taken out by the Contractor of the draw<strong>in</strong>gs or patterns<br />

registered by him, or of those patents, draw<strong>in</strong>gs or patterns <strong>for</strong> which he holds<br />

a license, the sign<strong>in</strong>g of the contract automatically gives the Purchaser the<br />

right to repair by himself the purchased articles covered by the patent or by<br />

any person or body chosen by him and to obta<strong>in</strong> from any sources he desires the<br />

component parts required by him <strong>for</strong> carry<strong>in</strong>g out the repair work. In the event<br />

of <strong>in</strong>fr<strong>in</strong>gement of any patent rights due to above action of the purchaser, he<br />

shall be entitled to claim damages from the contractor on the grounds of any<br />

loss of any nature which he may suffer.<br />

32. LICENSE AS PER GOVT. OF INDIA CONTRACT LABOUR ACT<br />

32.1 The contractors are required to produce license as enjo<strong>in</strong>ed <strong>in</strong> the Government of<br />

India Contract Labour (Regulation and Abolition) Act (1978). They shall not be<br />

allowed to undertake or execute any work through contract labour except under<br />

and <strong>in</strong> accordance with a license issued under the said Act <strong>in</strong> that behalf by<br />

the authorised licens<strong>in</strong>g Officer.<br />

33. DEFAULT & DELAYS<br />

The Contractor shall execute the work with due diligence and expedition, keep<strong>in</strong>g<br />

to the approved Time schedule. Should he refuse or neglect to comply with any<br />

reasonable orders given to him <strong>in</strong> writ<strong>in</strong>g by the Purchaser's Eng<strong>in</strong>eers <strong>in</strong><br />

Signature of contractor Page 76 of 127 Dy CSTE/IRPMU/Kanpur


connection with the work or contravene the provision of the contract or the<br />

progress of work lags persistently beh<strong>in</strong>d the time schedule due to his neglect,<br />

the Purchaser shall be at liberty to give seven days notice <strong>in</strong> writ<strong>in</strong>g to the<br />

Contractor requir<strong>in</strong>g him to make good the neglect or contravention compla<strong>in</strong>ed<br />

of and should the contractor fail to comply with the requisitions made <strong>in</strong> the<br />

notice with<strong>in</strong> seven days from the receipt thereof, it shall be lawful <strong>for</strong> the<br />

purchaser to take the work wholly or <strong>in</strong> part out of the Contractor's hands<br />

without any further reference and get the work or any part thereof, as the case<br />

may be, completed by other agencies at the expense of the contractor without<br />

prejudice to any other right or remedy of the Purchaser.<br />

34. LOSS SUSTAINED DUE TO DEFAULT AND DELAY<br />

In the event of any loss to the purchaser on account of execution and/or<br />

completion of the work or any part thereof by agencies other than the<br />

contractor, the contractor shall be liable to reimburse the loss to purchaser<br />

without prejudice to the other rights and remedies of the purchaser, and<br />

the reimbursement <strong>in</strong> full or <strong>in</strong> part as the case may be, shall be met, at the<br />

option of the purchaser from out of all or any of the follow<strong>in</strong>g sources viz:<br />

i) Any amount due and payable to the contractor by the purchaser on any account<br />

whatsoever;<br />

ii)<br />

The Contractor's security deposit <strong>in</strong> hands of the purchaser as far as available<br />

and any other assets whatsoever of the contractor;<br />

In the event of re-imbursement from out of sources (i) and/or (ii) above<br />

mentioned, the purchaser shall have the right of appropriation suo-moto.<br />

35. PENALTY FOR DELAY IN COMPLETION<br />

a) If the contractor fails to execute and complete the work with<strong>in</strong> the time<br />

specified <strong>in</strong> the Agreement or with<strong>in</strong> the period of extension granted under para<br />

36 except <strong>in</strong> so far as the delay is on the purchaser's account, the contractor shall<br />

be levied Liquidated Damages @ 1/2% per week or part thereof of the entire<br />

contract value of the work awarded to the contractor <strong>for</strong> delays <strong>in</strong><br />

supply/execution of the work as per General Condition of contract.<br />

b) For the purpose of this clause, the contract value of the works shall be taken as<br />

value of work as per contract agreement <strong>in</strong>clud<strong>in</strong>g any supplementary work<br />

order/contract agreement issued Provided also, that the total amount of liquidated<br />

damages under this condition shall not exceed the under noted percentage value or<br />

Signature of contractor Page 77 of 127 Dy CSTE/IRPMU/Kanpur


of the total value of the item or groups of items of work <strong>for</strong> which a separate<br />

dist<strong>in</strong>ct completion period is specified <strong>in</strong> the contract.<br />

(i) For contract value up to Rs. 2 Lakhs<br />

(ii) For contracts valued above Rs. 2 Lakhs<br />

-- 10% of the total value of the<br />

contract.<br />

-- 10% <strong>for</strong> the first Rs.2 Lakhs<br />

and the 5% of the balance.<br />

Provided further, that if the Railway is not satisfied that the works can be<br />

completed by the Contractor and <strong>in</strong> the event of failure on the part of the contractor<br />

to complete the work with<strong>in</strong> further extension of time allowed as a<strong>for</strong>esaid, the<br />

Railway shall be entitled, without prejudice to any other right or remedy available<br />

<strong>in</strong> that behalf, to appropriate the contractor’s security deposit and resc<strong>in</strong>d the<br />

contract under clause 62 of these conditions, whether or not actual damage is<br />

caused by such default.<br />

36. EXTENSION OF TIME<br />

If such a failure as a<strong>for</strong>esaid shall have arisen from any cause which the<br />

Purchaser may agree as be<strong>in</strong>g a reasonable ground <strong>for</strong> extension of time, the<br />

Chief Signal & Telecommunication Eng<strong>in</strong>eer/ IRPMU or his successor(s) may<br />

allow such additional time as he may <strong>in</strong> his absolute discretion consider to be<br />

reasonably justified by the circumstances of the case, such extensions shall be<br />

granted with liquidated damages <strong>in</strong> the Form No.11. The Contractor will apply<br />

<strong>for</strong> extension at least two months be<strong>for</strong>e the expiry of the period of completion.<br />

Form No.12 will be applicable <strong>in</strong> case extension is on purchaser's account and<br />

also <strong>in</strong> case extension is on contractor's account but the purchaser is reasonably<br />

satisfied that contractor cannot be penalised <strong>for</strong> such delay. The terms and<br />

conditions of the orig<strong>in</strong>al contract will rema<strong>in</strong> operative dur<strong>in</strong>g the extended<br />

period and noth<strong>in</strong>g will be allowed on this account.<br />

37. CONTRACTOR'S LIABILITIES FOR COSTS AND DAMAGES<br />

37.1 WITHHOLDING AND LIEN IN RESPECT OF SUMS CLAIMED<br />

a) Whenever any claim or claims <strong>for</strong> payment of a sum of money arises out of<br />

under the contract aga<strong>in</strong>st the contractor, the Purchaser shall be entitled to<br />

withhold and also have lien to reta<strong>in</strong> such sum or sums <strong>in</strong> whole or <strong>in</strong> part from<br />

the security, if any, deposited by the contractor and <strong>for</strong> the purpose a<strong>for</strong>esaid the<br />

purchaser shall be entitled to withhold the said cash security deposit or the<br />

security, if any, furnished as the case may be and also have lien over the sum<br />

pend<strong>in</strong>g f<strong>in</strong>alisation or adjudication of any such claim.<br />

Signature of contractor Page 78 of 127 Dy CSTE/IRPMU/Kanpur


) In the event of the security be<strong>in</strong>g <strong>in</strong>sufficient to cover the claimed amount or<br />

amounts or if no security has been taken from the Contractor, the purchaser shall<br />

be entitled to withhold and have lien to reta<strong>in</strong> to the extent of such claim amount<br />

or amounts referred to spura, from any sum or sums found payable or which at<br />

any time thereafter may become payable to the Contractor under the same<br />

contract or any other department of the Central Government pend<strong>in</strong>g<br />

f<strong>in</strong>alisation or adjudication of any such claims.<br />

c) It is an agreed term of the contract that the sum of money or moneys so withheld<br />

or reta<strong>in</strong>ed under the lien referred to by the purchaser till the claim aris<strong>in</strong>g out of<br />

or under the contract is determ<strong>in</strong>ed by the Arbitrator. (If the contract is <strong>gov</strong>erned<br />

by the Arbitration clause) or by the competent court as the case may be and that<br />

the contractor will have no claim <strong>for</strong> <strong>in</strong>terest of damages whatsoever on any<br />

account <strong>in</strong> respect of such withhold<strong>in</strong>g or retention under the lien referred to<br />

spura and duly notified as such to the Contractor.<br />

d) For the purpose of this clause, where contractor is a partnership firm or a<br />

limited company, the purchaser shall be entitled to withhold and also have a lien<br />

to reta<strong>in</strong> towards such claimed amount or amounts <strong>in</strong> whole or <strong>in</strong> part from any<br />

sum found payable to any partner/limited company, as the case may be,<br />

whether <strong>in</strong> his <strong>in</strong>dividual company or otherwise.<br />

37.2 LIEN IN RESPECT OF OTHER CONTRACTS<br />

a) Any sum or sums of money due and payable to the Contractor (<strong>in</strong>clud<strong>in</strong>g the<br />

security deposit returnable to him under the contract) may be withheld or<br />

reta<strong>in</strong>ed by way of lien by the Purchaser aga<strong>in</strong>st any claim of this Railway or<br />

any other Railways or any other Departments of the Central Government <strong>in</strong><br />

respect of payment of a sum of money aris<strong>in</strong>g out of or under any other<br />

contract made by the Contractor with this or any other Railway or any other<br />

department of the Central Government.<br />

b) It is an agreed term of the contract that the sum of money so withheld or reta<strong>in</strong>ed<br />

under this clause by the purchaser will be kept withheld or reta<strong>in</strong>ed as such by<br />

the purchaser till the claim aris<strong>in</strong>g out of or under any other contract is<br />

either mutually settled or determ<strong>in</strong>ed by the Arbitrator if the other contract is<br />

<strong>gov</strong>erned by the Arbitration clause or by the competent court as the case may<br />

be, and that the contractor shall have no claim <strong>for</strong> <strong>in</strong>terest or damages <strong>in</strong> respect<br />

of any sum of money withheld or reta<strong>in</strong>ed under this clause and duly notified to<br />

the contractor.<br />

38. UNIT PRICES<br />

Signature of contractor Page 79 of 127 Dy CSTE/IRPMU/Kanpur


38.1 The prices quoted by the Tenderer shall <strong>in</strong>clude the prices of materials <strong>in</strong>clud<strong>in</strong>g<br />

all <strong>in</strong>cidental charges <strong>for</strong> transport, load<strong>in</strong>g/unload<strong>in</strong>g and handl<strong>in</strong>g of<br />

materials, commission <strong>for</strong> arrang<strong>in</strong>g despatch by rail / road direct from<br />

manufacturer's factory and complet<strong>in</strong>g all necessary <strong>for</strong>malities <strong>in</strong> this respect,<br />

such as submission of <strong>for</strong>ward<strong>in</strong>g notes, arrang<strong>in</strong>g placement of Wagon,<br />

collection of banker's charges <strong>for</strong> Bank guarantee, Indemnity Bonds, <strong>in</strong>clusive<br />

of cost of Stamp etc. as also sid<strong>in</strong>g or shunt<strong>in</strong>g charges, if any, levied by the<br />

Railway. The break up of the basic cost and other taxes and duties shall be<br />

positively submitted.<br />

38.2 The prices shall <strong>in</strong>clude all taxes, duties, Royalty and levies (<strong>in</strong>clud<strong>in</strong>g Octroi<br />

etc.) applicable on this Works Contract. There<strong>for</strong>e, they should quote their prices<br />

tak<strong>in</strong>g <strong>in</strong>to account the rate of sales tax as leviable <strong>in</strong> the event of sale to the<br />

Central Government Organisation etc. It is clarified that required <strong>for</strong>m applicable<br />

<strong>for</strong> this purpose will be supplied to the contractor, as applicable <strong>in</strong> the state where<br />

the contract is be<strong>in</strong>g executed. The prices shall also <strong>in</strong>clude provision <strong>for</strong> losses<br />

and wastage <strong>in</strong> transit and <strong>in</strong>stallation and commission<strong>in</strong>g.<br />

38.3 The prices quoted by the tenderer shall <strong>in</strong>clude cost of commission<strong>in</strong>g and<br />

test<strong>in</strong>g and all costs of Adm<strong>in</strong>istration of Contract, Insurance Premium,<br />

Banker's charges <strong>for</strong> guarantees, cost of storage, load<strong>in</strong>g-unload<strong>in</strong>g and handl<strong>in</strong>g<br />

of materials and <strong>for</strong> any road transport which the contractor may use <strong>for</strong> carriage<br />

of materials to his depot and the site of work. The prices shall <strong>in</strong>clude the cost of<br />

works and adjustments necessary to be done by the contractor dur<strong>in</strong>g or after<br />

tests carried out by the purchaser.<br />

38.4 The price to be quoted by the tenderers should take <strong>in</strong>to account the credit availed<br />

on <strong>in</strong>puts under the MODVAT scheme <strong>in</strong>troduced w.e.f. Ist March 1986. The<br />

tenderers should give a declaration that any let offs <strong>in</strong> respect of duties on <strong>in</strong>puts<br />

as admissible under law is be<strong>in</strong>g totally and unconditionally passed on to the<br />

purchaser <strong>in</strong> the price quoted by him (see para 43).<br />

38.5 While the price quoted <strong>in</strong> the contract are <strong>in</strong>clusive of all taxes i.e. custom duty,<br />

excise duty, octroi, local levies, Sales tax levied by any statutory authority, the<br />

purchaser shall make any deduction toward sales tax on works contract if<br />

statutorily required to do so. The deducted sales tax on works contract shall be<br />

remitted to the concerned sales tax authority and the purchaser shall <strong>in</strong> no way<br />

be responsible <strong>for</strong> any disputes between the sales tax authorities and the<br />

contractor <strong>in</strong> this regard.<br />

38.6 All taxes, duties and levies (Includ<strong>in</strong>g octroi etc.) aris<strong>in</strong>g out of the transaction<br />

between the contractor and his sub contractor/supplier <strong>for</strong> this work will be<br />

<strong>in</strong>cluded <strong>in</strong> the rates quoted by the contractor <strong>in</strong> the relevant schedule.<br />

Signature of contractor Page 80 of 127 Dy CSTE/IRPMU/Kanpur


38.7 Arrangement of permits/license <strong>for</strong> materials will not be made by the Railway<br />

or any assistance given. The Contractor will have to make his own<br />

arrangement. Also no import license shall be arranged by the Railway <strong>for</strong> this<br />

work.<br />

38.8 The Unit prices offered aga<strong>in</strong>st the various items <strong>in</strong> schedules will <strong>in</strong>clude beside<br />

labour the follow<strong>in</strong>g elements of cost :-<br />

(i)<br />

(ii)<br />

(iv)<br />

(v)<br />

Cost of transportation of material, supplied by the Railway from place of delivery<br />

to the site of work.<br />

Return of released materials, left over cables and other materials from the site of<br />

work and hand<strong>in</strong>g over to the Eng<strong>in</strong>eer at specified locations or stores depot.<br />

Cost of preparation of detailed documentation, completion plans/draw<strong>in</strong>gs (see<br />

para 12).<br />

All other miscellaneous expenses necessary <strong>for</strong> the execution of the work and<br />

fulfillment of contractual obligation.<br />

39. MEASUREMENT OF WORKS<br />

39.1 Payments <strong>for</strong> the works shall be made <strong>in</strong> accordance with approved designs &<br />

draw<strong>in</strong>gs and measured <strong>in</strong> relevant units except where provided or otherwise.<br />

The measurements will be made generally <strong>in</strong> accordance with standard<br />

eng<strong>in</strong>eer<strong>in</strong>g practice & <strong>in</strong> con<strong>for</strong>mity with the General conditions of Contract.<br />

39.2 Figures, Dimensions and Draw<strong>in</strong>gs shall supersede measurement by scale and<br />

draw<strong>in</strong>gs to a larger scale shall take precedence over those to a smaller scale.<br />

Special dimensions or directions <strong>in</strong> the specification shall supersede all else.<br />

39.3 MEANING AND INTERPRETATION BY RAILWAY TO BE FINAL<br />

All measurement, method of measurement, mean<strong>in</strong>g and <strong>in</strong>tent of specifications<br />

and <strong>in</strong>terpretation of Special Conditions of Contract, given and made by the<br />

Purchaser or by the Purchaser’s Eng<strong>in</strong>eer shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g and shall<br />

be considered "excepted matters" <strong>in</strong> terms of conditions laid down <strong>in</strong> the<br />

General Conditions of Contract.<br />

40. TERMS OF PAYMENT<br />

Signature of contractor Page 81 of 127 Dy CSTE/IRPMU/Kanpur


40.1 Payment to contractor will be made through EFT/ECS. All bills shall be<br />

submitted to the authority mentioned <strong>in</strong> Preamble or as nom<strong>in</strong>ated by<br />

CAO/IRPMU from time to time.<br />

40.2 Subject to any deductions or recovery which the Railway may be entitled to<br />

make under contract, the Contractor will be entitled to be paid from time to<br />

time by way of `on account payment' <strong>for</strong> supply of goods and `progress<br />

payment' <strong>for</strong> works as <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer he has executed <strong>in</strong> terms<br />

of Contract.<br />

41 ON ACCOUNT PAYMENT<br />

41.1 "On Account Payment" will be made <strong>for</strong> supply of equipment, materials <strong>in</strong>dicated<br />

<strong>in</strong> the supply schedule on receipt of materials <strong>in</strong> good condition at the<br />

Stores of Sr. Section Eng<strong>in</strong>eer/IRPMU at Kanpur. On Account payments made<br />

will subsequently be adjusted aga<strong>in</strong>st payments due on Provisional Acceptance or<br />

F<strong>in</strong>al Acceptance. 80% of the value of each item of Schedule ‘B’ will be paid on<br />

production of the follow<strong>in</strong>g documents: -<br />

a) Store receipt certificate issued by Railway official/Representative as per<br />

Form-14.<br />

b) Orig<strong>in</strong>al Inspection certificate issued by Inspect<strong>in</strong>g Officer viz. RDSO/RITES<br />

/Railway Representative or Inspection Waiver Certificate issued by competent<br />

authority.<br />

c) Manufacturer’s certificate <strong>for</strong> SSI equipments and associated equipment that the<br />

materials are <strong>in</strong> accordance with the specifications of the contract.<br />

d) Challan / Invoice <strong>in</strong> duplicate.<br />

e) A certificate that the materials supplied are as per the contract and the amount<br />

claimed <strong>in</strong> the <strong>in</strong>voice is correct as per terms of the contract.<br />

f) Current Sale Tax Clearance Certificate. (Form No. 58).<br />

41.2 All on account payments shall be covered by a stand<strong>in</strong>g <strong>in</strong>demnity bond <strong>in</strong> the<br />

approved <strong>for</strong>m (see Form No.6).<br />

41.3 80% payment of each Item of Schedule ‘A’ and next 10% payment of the value of<br />

each item of Schedule ‘B’ will be made after successful execution/<strong>in</strong>stallation of<br />

the item at site pend<strong>in</strong>g commission<strong>in</strong>g of work.<br />

41.4 Next 10% payment aga<strong>in</strong>st Items of all schedules A and B will be made on<br />

successful completion of Acceptance Test after <strong>in</strong>stallation and commission<strong>in</strong>g <strong>in</strong><br />

Signature of contractor Page 82 of 127 Dy CSTE/IRPMU/Kanpur


which the equipment per<strong>for</strong>mance would have been demonstrated to the Railways<br />

by the Contractor and on production of a certificate to that effect issued by the<br />

Railway Eng<strong>in</strong>eer. In case if commission<strong>in</strong>g is delayed on Railway Account <strong>for</strong><br />

more then Six months from date of <strong>in</strong>stallation, this 10% shall be released on<br />

submission of Bank Guarantee of equivalent amount.<br />

41.5 The balance 10% payment <strong>for</strong> Schedule ‘A’ will be made after satisfactory<br />

completion of the ma<strong>in</strong>tenance period and issue of F<strong>in</strong>al acceptance certificate.<br />

The certification will be done by the authorised representative of Railway.<br />

42. FINAL SETTLEMENT<br />

On expiry of the ma<strong>in</strong>tenance and warranty period, if any, and issue of the<br />

certificate by the competent authority, the security deposit will be refunded after<br />

adjustment of any dues payable by the contractor. In case AMC is built <strong>in</strong> the<br />

contract as part of the schedule of requirements, the security deposit shall be<br />

released after submission of bank guarantee of an amount equivalent to total value<br />

of AMC contract <strong>for</strong> 1 year (Bank Guarantee can be of reduc<strong>in</strong>g value, after every<br />

year equivalent to AMC charges of each lapsed year).<br />

43. CERTIFICATE FOR MODVAT BENEFITS ON BILLS<br />

a) The Contractor should submit the follow<strong>in</strong>g certificate along with the bills:-<br />

"We certify that no additional duty set off on the Goods supplied by us have<br />

accrued under the MODVAT Scheme <strong>in</strong> <strong>for</strong>ce on the date of supply after we<br />

submitted our quotations and submitted the present bill."<br />

b) In the event of MODVAT credit be<strong>in</strong>g extended by the Government of India<br />

to more items than that already covered, the firm should advise the purchaser<br />

about the additional benefits accrued through a letter conta<strong>in</strong><strong>in</strong>g the follow<strong>in</strong>g<br />

certificate or any variation thereof as may be considered necessary by<br />

<strong>in</strong>dividual Railway adm<strong>in</strong>istration :-<br />

“We hereby declare that we can avail additional duty set off as per latest<br />

MODVAT scheme <strong>in</strong> <strong>for</strong>ce now and we hereby give a reduction of<br />

(___________) per unit and agree to revise the prices <strong>in</strong>dicated <strong>in</strong> the order. The<br />

current E.D. of (_________) is payable on this reduced price. There<strong>for</strong>e, we<br />

request you to amend the order accord<strong>in</strong>gly."<br />

44. DEDUCTION FROM ON ACCOUNT PAYMENT BILLS<br />

Signature of contractor Page 83 of 127 Dy CSTE/IRPMU/Kanpur


(i) All costs, damages or expenses, which Railways may have paid or <strong>in</strong>curred,<br />

which under the provisions of contract are Contractor's obligations will be<br />

deducted by Railways from progress payment Bills/Invoice of contractor, as<br />

and when it is understood that such an expenses has been <strong>in</strong>curred or paid <strong>for</strong>.<br />

(ii)<br />

All such claims of Railways shall, however, be duly supported by appropriate and<br />

certified vouchers, receipts or explanations as are available to enable the<br />

contractor to identify such claims.<br />

45. TAXES<br />

45.1 The Contractor and all personnel employed by him shall pay such taxes like<br />

Income Tax as are payable under statutory laws of India and the Purchaser WILL<br />

NOT ACCEPT any liability <strong>for</strong> the same.<br />

45.2 Deduction of Income Tax at source as per provisions of F<strong>in</strong>ance Act and<br />

Income Tax Act <strong>in</strong> <strong>for</strong>ce shall be made from the Contractor/Sub-Contractor and<br />

the amount so deducted may be credited to the Central Government.<br />

45.3 Wherever the law makes it statutory <strong>for</strong> the Purchaser to deduct any amount<br />

towards Sales Tax on Works Contract, the same will be deducted and remitted to<br />

the concerned authority.<br />

45.4 INFRASTRUCTURE BENEFIT COST<br />

45.4.1 The tenderer shall ensure the availability of <strong>in</strong>frastructure Benefit <strong>for</strong> reduced<br />

custom duty, if applicable. The goods would be <strong>in</strong> Railways’ name. The<br />

tenderers shall be responsible <strong>for</strong> custom clearance, transportation and <strong>in</strong>surance<br />

etc, on behalf of the Railways <strong>in</strong>clud<strong>in</strong>g payment of custom duty, <strong>in</strong>surance,<br />

freight and other charges, if any tenderers shall also be responsible <strong>for</strong> avail<strong>in</strong>g<br />

<strong>in</strong>frastructure benefit, if any, on behalf of purchaser. Purchaser will issue<br />

necessary letter of authorization required <strong>for</strong> the purpose. The equipment will<br />

rema<strong>in</strong> with the tenderer at his risk till it is f<strong>in</strong>ally taken over.<br />

If such <strong>in</strong>frastructure benefit is not applicable, tenderers shall quote the price of<br />

goods and services mentioned <strong>in</strong> price schedule with all duties applicable at the<br />

time of submission of bids.<br />

46. INSURANCE<br />

46.1 The Contractor shall take out and keep <strong>in</strong> <strong>for</strong>ce a policy or policies of <strong>in</strong>surance<br />

aga<strong>in</strong>st all liabilities of the Contractor or the Purchaser at common law or under<br />

any statute <strong>in</strong> respect of accidents to persons who shall be employed by the<br />

contractor <strong>in</strong> or about the site <strong>for</strong> the purpose of carry<strong>in</strong>g out the works on the<br />

Signature of contractor Page 84 of 127 Dy CSTE/IRPMU/Kanpur


site. The Contractor shall also take out and keep <strong>in</strong> <strong>for</strong>ce a policy or policies of<br />

Insurance aga<strong>in</strong>st all recognized risks to their offices and depots. Such <strong>in</strong>surance<br />

shall <strong>in</strong> all respects be to the approval of the Purchaser and if he so requires <strong>in</strong> his<br />

name.<br />

46.2 INSURANCE OF MATERIALS & INSTALLATIONS<br />

The Contractor shall take out and keep <strong>in</strong> <strong>for</strong>ce a policy or policies of Insurance<br />

<strong>for</strong> all materials <strong>in</strong>clud<strong>in</strong>g Railway supply materials equipment irrespective of<br />

whether used up <strong>in</strong> the portion of work already done or kept <strong>for</strong> the use <strong>in</strong> the<br />

balance portion of the work until such works are provisionally handed over to<br />

the Railways. For this purpose the works are deemed to have been provisionally<br />

handed over when Provisional Acceptance certificate is issued <strong>for</strong> the Sub-section<br />

as per para 26 of SCC.<br />

46.3 The Contractor shall not be liable <strong>for</strong> losses/damages to the materials either used<br />

up <strong>in</strong> the portion of work done or his material kept <strong>for</strong> use at site, <strong>in</strong><br />

consequence of mut<strong>in</strong>y, or other similar causes over which the Contractor has no<br />

control and which cannot be <strong>in</strong>sured. Such losses or damages shall be the liability<br />

of the Purchaser and if required by the Purchaser, be made good by the contractor,<br />

at the cost of the Purchaser.<br />

46.4 The Contractor should, however, <strong>in</strong>sure the stores brought to site, aga<strong>in</strong>st risks<br />

<strong>in</strong> consequence of war and <strong>in</strong>vasion, as required under the Emergency Risk<br />

(Goods) Insurance Act <strong>in</strong> <strong>for</strong>ce from time to time.<br />

46.5 It may be noted that the beneficiary of the <strong>in</strong>surance policy should be Railways or<br />

the policies should be pledged <strong>in</strong> favour of Railway. The contractor shall keep the<br />

policy/policies current till the <strong>in</strong>stallations are provisionally handed over to the<br />

Purchaser. It may also be noted that <strong>in</strong> the event of contractor's failure to<br />

keep the policy current and alive, renewal of the policy will be done by the<br />

purchaser <strong>for</strong> which the cost of the premium plus 20% of premium shall be<br />

recovered from the contractor.<br />

46.6 For purpose of enabl<strong>in</strong>g the contractor to take the <strong>in</strong>surance cover <strong>in</strong> connection<br />

with this contract, the purchaser's eng<strong>in</strong>eer will advise the approximate price of<br />

all the Railway supply materials to the contractor.<br />

46.7 The Contractor shall take out all Insurance covers <strong>in</strong> connection with this<br />

contract with General Insurance Corporation of India only.<br />

47. FORCE MAJEURE CLAUSE<br />

Signature of contractor Page 85 of 127 Dy CSTE/IRPMU/Kanpur


If at any time, dur<strong>in</strong>g the cont<strong>in</strong>uance of this contract, the per<strong>for</strong>mance, <strong>in</strong> whole<br />

or part, by either party, of any obligation under this contract shall be prevented or<br />

delayed by reason of any war, hostility, act of the public enemy, Civil<br />

Commotion, Sabotage, Fires, Floods, Earth quakes, explosions, strikes,<br />

epidemics, quarant<strong>in</strong>e, restrictions lockouts, any statute, statutory rules,<br />

regulations, order of requisitions issued by any Government Department or<br />

Competent Authority or acts of God (here-<strong>in</strong> after referred to as event) then<br />

provided notice of the happen<strong>in</strong>g of any such, event is given by either party to<br />

the other with<strong>in</strong> twenty one days from the date of occurrence thereof neither<br />

party shall by reason of such event be entitled to term<strong>in</strong>ate this Contract nor<br />

shall either party have any claim <strong>for</strong> damage aga<strong>in</strong>st the other <strong>in</strong> respect of such<br />

non-per<strong>for</strong>mance or delay <strong>in</strong> per<strong>for</strong>mance, and the obligations under the<br />

Contract shall be resumed as soon as practicable after such event has come to an<br />

end or ceased to exist, provided further that if the per<strong>for</strong>mance <strong>in</strong> whole or<br />

part of any obligation under this contract is prevented or delayed by reason of<br />

any such event beyond a period as mutually agreed to by the Railways and the<br />

Contractor after any event or 60 days <strong>in</strong> the absence of such an agreement<br />

whichever is more, either party may at its option term<strong>in</strong>ate the Contract<br />

provided also that if the contract is so term<strong>in</strong>ated under this clause the Railways<br />

may at the time of such term<strong>in</strong>ation take over from the Contractor at prices as<br />

provided <strong>for</strong> <strong>in</strong> the contract, all works executed or works under execution.<br />

48. SETTLEMENT OF DISPUTE AND ARBITRATION<br />

48.1 MATTERS FINALLY DETERMINED BY THE RAILWAY<br />

All disputes or differences of any k<strong>in</strong>d whatsoever aris<strong>in</strong>g out of or <strong>in</strong> connection<br />

with the contract, whether dur<strong>in</strong>g the progress of the work or after its completion<br />

and whether be<strong>for</strong>e or after the determ<strong>in</strong>ation of the contract shall be referred<br />

by the contractor to the Railway and the Railway shall with<strong>in</strong> 120 days after<br />

receipt of the contractor's representation make and notify decisions on all matters<br />

referred to by the contractor <strong>in</strong> writ<strong>in</strong>g provided that matters <strong>for</strong> which<br />

provision has been made <strong>in</strong> clauses 8(a), 18, 22(5), 39, 43(2), 45(a) 55, 55-<br />

A(5), 57, 57A, 61(1), 61(2) and 62(i)(b) of General Conditions of Contract or <strong>in</strong><br />

any clause of the Special Conditions of the Contract shall be deemed as<br />

'excepted matters' and decision of the Railway authority, thereon shall be<br />

f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor provided further that 'excepted matters' shall<br />

stand specifically excluded from the purview of the arbitration clause and not<br />

be referred to arbitration.<br />

48.2 DEMAND FOR ARBITRATION<br />

(i)<br />

In the event of any dispute or difference between the parties hereto as to the<br />

construction or operation of this contract, or the respective rights and liabilities<br />

of the parties on any matter <strong>in</strong> question, dispute or difference on any account or<br />

Signature of contractor Page 86 of 127 Dy CSTE/IRPMU/Kanpur


as to the withhold<strong>in</strong>g by the Railway of any certificate to which the contractor<br />

may claim to be entitled to, or if the Railway fails to make a decision with<strong>in</strong><br />

120 days, then and <strong>in</strong> any such case, but except <strong>in</strong> any of the 'excepted matters'<br />

referred to <strong>in</strong> clause 49.1 of these conditions, the contractor, after 120 days but<br />

with<strong>in</strong> 180 days of his present<strong>in</strong>g his f<strong>in</strong>al claim on disputed matters shall<br />

demand <strong>in</strong> writ<strong>in</strong>g that the dispute or difference be referred to Arbitration.<br />

(ii)<br />

The demand <strong>for</strong> arbitration shall specify the matters which are <strong>in</strong> question or<br />

subject of the dispute or difference as also the amounts of claim item-wise.<br />

Only such dispute(s) or difference(s) <strong>in</strong> respect of which the demand has<br />

been made, together with counter claims or set off shall be referred to<br />

arbitration and other matters shall not be <strong>in</strong>cluded <strong>in</strong> the reference.<br />

(a) The Arbitration proceed<strong>in</strong>gs shall be assumed to have commenced from the<br />

day, a written and valid demand <strong>for</strong> arbitration is received by the Railway.<br />

(b) The claimant shall submit his claim stat<strong>in</strong>g the facts support<strong>in</strong>g the claims along<br />

with all relevant documents and the relief or remedy sought aga<strong>in</strong>st each claim<br />

with<strong>in</strong> a period of 30 days from the date of appo<strong>in</strong>tment of the Arbitral Tribunal.<br />

(c) The Railway shall submit its defence statement and counter claims, if any<br />

with<strong>in</strong> a period of 60 days of receipt of copy of claims from Tribunal thereafter,<br />

unless otherwise extension has been granted by Tribunal.<br />

(d) No new claim shall be added dur<strong>in</strong>g proceed<strong>in</strong>gs by either party. However party<br />

may amend or supplement the orig<strong>in</strong>al claim or defence thereof dur<strong>in</strong>g the<br />

course of arbitration proceed<strong>in</strong>gs subject to acceptance by Tribunal hav<strong>in</strong>g due<br />

regard to the delay <strong>in</strong> mak<strong>in</strong>g it.<br />

(e) If the contractor(s) does/do not prefer his/their specific and f<strong>in</strong>al claims <strong>in</strong><br />

writ<strong>in</strong>g, with<strong>in</strong> a period of 90 days of receiv<strong>in</strong>g the <strong>in</strong>timation from the<br />

Railways that the f<strong>in</strong>al bill is ready <strong>for</strong> payment, he/they will be deemed to<br />

have waived his/their claim(s) and the Railway shall be discharged and<br />

released of all liabilities under the contract <strong>in</strong> respect of these claims.<br />

48.3 OBLIGATIONS DURING PENDENCY OF ARBITRATION<br />

Work under the contract shall, unless otherwise directed by the Eng<strong>in</strong>eer,<br />

cont<strong>in</strong>ue dur<strong>in</strong>g the arbitration proceed<strong>in</strong>gs, and no payment due or payable by<br />

the Railway shall be withheld on account of such proceed<strong>in</strong>gs, provided,<br />

however, it shall be open <strong>for</strong> Arbitral Tribunal to consider and decide whether<br />

or not such work should cont<strong>in</strong>ue dur<strong>in</strong>g arbitration proceed<strong>in</strong>gs.<br />

Signature of contractor Page 87 of 127 Dy CSTE/IRPMU/Kanpur


48.3(a)(i) In cases where the total value of all claims <strong>in</strong> question added together does<br />

not exceed Rs.10,00,000/- (Rupees Ten Lakhs only), the Arbitral Tribunal<br />

consist of a sole arbitrator who shall be either the General Manager or a<br />

gazetted officer of Rail not below the grade of JA Grade nom<strong>in</strong>ated by the<br />

General Manager <strong>in</strong> that behalf. The sole arbitrator shall be appo<strong>in</strong>ted with<strong>in</strong><br />

60 days from the day when a written and valid demand <strong>for</strong> arbitration is received<br />

by Railway.<br />

48.3(a)(ii) In cases not covered by clause 50.3(a)(i), the Arbitral Tribunal shall<br />

consist of a panel of three Gazetted Railway Officers not below JA Grade, as<br />

the arbitrators. For this purpose, the Railway will send a panel of more than 3<br />

names of Gazetted Railway Officers of one or more departments, of the<br />

Railway to the contractor who will be asked to suggest to General Manager upto<br />

2 names out of the panel <strong>for</strong> appo<strong>in</strong>tments as contractor's nom<strong>in</strong>ee. The<br />

General Manager shall appo<strong>in</strong>t at least one out of them as the contractor's<br />

nom<strong>in</strong>ee and will, also simultaneously appo<strong>in</strong>t the balance number of<br />

arbitrators either from the panel or from outside the panel, duly <strong>in</strong>dicat<strong>in</strong>g the<br />

'Presid<strong>in</strong>g arbitrator from amongst the 3 arbitrators so appo<strong>in</strong>ted. While<br />

nom<strong>in</strong>at<strong>in</strong>g the arbitrators it will be necessary to ensure that one of them is from<br />

the Accounts department. An officer of Selection Grade of the Accounts<br />

department shall be considered of equal status to the officers <strong>in</strong> SA grade of<br />

other departments of the Railways <strong>for</strong> the purpose of appo<strong>in</strong>tment of arbitrators.<br />

48.3(a)(iii) If one or more of the arbitrators appo<strong>in</strong>ted as above refuses to act as<br />

arbitrator, withdraws from his office as arbitrator, or vacates his/their<br />

office/offices or is/are unable or unwill<strong>in</strong>g to per<strong>for</strong>m his functions as<br />

arbitrator <strong>for</strong> any reason whatsoever or dies or <strong>in</strong> the op<strong>in</strong>ion of the General<br />

Manager fails to act without undue delay, General Manager shall appo<strong>in</strong>t new<br />

arbitrator/arbitrators to act <strong>in</strong> his/their place <strong>in</strong> the same manner <strong>in</strong> which the<br />

earlier arbitrator/arbitrators had been appo<strong>in</strong>ted. Such re-constituted Tribunal<br />

may at its discretion, proceed with the reference from the stage at which it was<br />

left by the previous arbitrator(s).<br />

48.3.3(a)(iv) The arbitral Tribunal shall have power to call <strong>for</strong> such evidence by way of<br />

affidavits or otherwise as the arbitral Tribunal shall th<strong>in</strong>k proper, and it shall be<br />

the duty of the parties hereto to do or cause to be done all such th<strong>in</strong>gs as may<br />

be necessary to enable the Arbitral Tribunal to make the award without any<br />

delay.<br />

48.3(a)(v) While appo<strong>in</strong>t<strong>in</strong>g arbitrator(s) under Sub-clause (i), (ii) and (iii) above, due<br />

care shall be taken that he/they is/are not the one/those who had an opportunity<br />

to deal with the matters to which the contract relates or who <strong>in</strong> the course of<br />

his/their duties as Railway servant(s) expressed views on all or any of the matters<br />

under dispute or differences. The proceed<strong>in</strong>gs of the Arbitral Tribunal or the<br />

Signature of contractor Page 88 of 127 Dy CSTE/IRPMU/Kanpur


award made by such Tribunal will, however, not be <strong>in</strong>valid merely <strong>for</strong> the reason<br />

that one or more arbitrator had, <strong>in</strong> the course of his service, opportunity to deal<br />

with the matters to which the contract relates or who <strong>in</strong> the course of his/their<br />

duties expressed views on all or any of the matters under dispute.<br />

48.3(b)(i) The arbitral award shall state <strong>in</strong> item-wise, the sum and reasons upon which it<br />

is based.<br />

48.3(b)(ii) A party may apply <strong>for</strong> corrections of any computational errors, any<br />

typographical or clerical errors or any other error of similar nature occurr<strong>in</strong>g <strong>in</strong><br />

the award and <strong>in</strong>terpretation of a specific po<strong>in</strong>t of award to tribunal with<strong>in</strong> 30<br />

days of receipt of the award.<br />

48.3(b)(iii) A party may apply to tribunal with<strong>in</strong> 30 days of receipt of award to make<br />

on additional award as to claims presented <strong>in</strong> the arbitral proceed<strong>in</strong>gs but<br />

omitted from the arbitral award.<br />

48.4 In case of the Tribunal, compris<strong>in</strong>g of three Members, any rul<strong>in</strong>g or award shall<br />

be made by a majority of Members of Tribunal. In the absence of such a<br />

majority the views of the Presid<strong>in</strong>g Arbitrator shall prevail.<br />

48.5 Where the arbitral award is <strong>for</strong> the payment of money, no <strong>in</strong>terest shall be payable<br />

on whole or any part of the money <strong>for</strong> any period till the date on which the award<br />

<strong>in</strong> made.<br />

48.6 The cost of arbitration shall be borne by the respective parties. The cost shall<br />

<strong>in</strong>ter-alia <strong>in</strong>clude fees of the arbitrator(s) as per the rates fixed by the Railway<br />

Adm<strong>in</strong>istration from time to time.<br />

48.7 Subject to the provisions of the a<strong>for</strong>esaid Arbitration and conciliation Act 1996<br />

and the rules there under and any statutory modification thereof shall apply to the<br />

arbitration proceed<strong>in</strong>gs under this clause.<br />

**********<br />

Signature of contractor Page 89 of 127 Dy CSTE/IRPMU/Kanpur


Section – II<br />

Chapter – 3<br />

Tender Forms<br />

Signature of contractor Page 90 of 127 Dy CSTE/IRPMU/Kanpur


FORM No. 1<br />

FORM No. 2<br />

FORM No. 3<br />

: Offer letter.<br />

: Not Applicable.<br />

: Agreement.<br />

FORM No. 4 : Bank Guarantee <strong>for</strong> Per<strong>for</strong>mance Guarantee<br />

FORM No. 5<br />

FORM No. 6<br />

: Statement of Deviations.<br />

: Stand<strong>in</strong>g Indemnity Bond <strong>for</strong> on account<br />

Payments and Stores supplied by Railway<br />

FORM No. 7 : System Per<strong>for</strong>mance Guarantee.<br />

FORM No. 8 : Not Applicable<br />

FORM No. 9<br />

: Jo<strong>in</strong>t Inspection of Cable Trench & Protective<br />

Works<br />

FORM No. 10 : Acknowledgement <strong>for</strong> receiv<strong>in</strong>g<br />

Material and Cable from Railways.<br />

FORM No. 11 : Extension of period of completion on<br />

Account of contractor.<br />

FORM No. 12 : Extension of period of completion of<br />

work.<br />

FORM No. 13 : Qualification Experience.<br />

FORM No. 14 : Store Receipt Certificate.<br />

FORM No. 15 : Electronic Clear<strong>in</strong>g Service.<br />

Signature of contractor Page 91 of 127 Dy CSTE/IRPMU/Kanpur


FORM-1<br />

Para-6.8 (a), Section II Chapter 1<br />

OFFER LETTER<br />

To<br />

The President of India,<br />

Act<strong>in</strong>g through Chief Adm<strong>in</strong>istrative Officer/ (or his successor),<br />

IRPMU, N C Railway,<br />

Shivaji Bridge, (IRCOT Complex), New Delhi.<br />

Name of Work: Design, Manufacture, Supply, Installation, Test<strong>in</strong>g and Commission<strong>in</strong>g<br />

of new Solid State (Electronic) Interlock<strong>in</strong>g System and Alteration to exist<strong>in</strong>g Solid State<br />

(Electronic) Interlock<strong>in</strong>g system con<strong>for</strong>m<strong>in</strong>g to RDSO Specification No. – RDSO/SPN/<br />

192/2005 with latest amendments <strong>in</strong> connection of ‘Provision of automatic signall<strong>in</strong>g on<br />

new 3rd l<strong>in</strong>e and bi-directional signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong><br />

Panki-Bhaupur section and at Panki & Bhaupur stations on Kanpur-Etawah section of<br />

Allahabad division of North Central Railway’.<br />

Sir, I/We …………………………… have read various conditions to tender hereto<br />

attached and hereby agree to abide by the said conditions. I/We also agree to keep this<br />

Tender open <strong>for</strong> acceptance <strong>for</strong> a period of 120 days from the date fixed <strong>for</strong> open<strong>in</strong>g the<br />

same and <strong>in</strong> default thereof, I / We will be liable <strong>for</strong> <strong>for</strong>feiture of my/our Security<br />

Deposit. I / We offer to do this work as detailed below at the rates quoted below:<br />

S.<br />

No<br />

Schedule<br />

Approximate<br />

Cost of<br />

Schedule<br />

Rates quoted by the tenderer (% Above/ Below/At<br />

Par) (Both <strong>in</strong> figures and Words)<br />

In Figures<br />

In Words<br />

ABOVE<br />

/<br />

BELOW<br />

In Figures<br />

In Words<br />

ABOVE<br />

/<br />

BELOW<br />

TOTAL<br />

I/We hereby b<strong>in</strong>d myself/ourselves to complete the work with<strong>in</strong> the time limits specified<br />

<strong>in</strong> the conditions of Tender. I/We also hereby agree to abide by the General conditions of<br />

Contract with latest amendments and special conditions of Contract and to carry out the<br />

works accord<strong>in</strong>g to the specifications of materials and works laid down by the Railway<br />

<strong>for</strong> present contract.<br />

Signature of contractor Page 92 of 127 Dy CSTE/IRPMU/Kanpur


I/We declare that I/We have gone through the Rules, Regulations of. Tender and Contract<br />

General Conditions, Special conditions, specifications and other particulars embodied <strong>in</strong><br />

Volume-2 and have fully understood and agree to abide by them.<br />

Until a <strong>for</strong>mal agreement is prepared and executed, acceptance of this Tender shall<br />

constitute, subject to modifications as may be mutually agreed to, a b<strong>in</strong>d<strong>in</strong>g contract,<br />

between us and the President of India act<strong>in</strong>g through the Chief Signal &<br />

Telecommunication Eng<strong>in</strong>eer (Construction), North Central Railway, Allahabad or the<br />

authority as <strong>in</strong>dicated <strong>in</strong> the letter of acceptance of my/our offer <strong>for</strong> this work.<br />

SIGNATURE OF <strong>TENDER</strong>ER [S]<br />

(Please affix your Seal also, if any)<br />

Contractor's Address:<br />

Date:<br />

Signature of contractor Page 93 of 127 Dy CSTE/IRPMU/Kanpur


AGREEMENT<br />

FORM - 3<br />

Para-2/ Section II Chapter 2<br />

AN AGREEMENT made this ........................................................... day of<br />

....................................... Two Thousand .......................... between the President of India,<br />

act<strong>in</strong>g <strong>in</strong> the premises through the Chief Adm<strong>in</strong>istrative Officer/IRPMU, North Central<br />

Railway or his successor ......................................... of the M<strong>in</strong>istry of Railways, Railway<br />

Board (here<strong>in</strong> after referred to as “the Railway”) of one part and Messers<br />

.................................................. (here<strong>in</strong> after referred to as “Contractor”) of the other part,<br />

a .......................... Firm (Status of the firm) be<strong>in</strong>g represented by .....................................<br />

(Name & Designation of the proprietor <strong>in</strong> case of sole proprietorship bus<strong>in</strong>ess or all the<br />

names and particulars <strong>in</strong> case of partnership firm etc.)<br />

Whereas <strong>in</strong> response to a call <strong>for</strong> Tenders “Design, Manufacture, Supply, Installation,<br />

Test<strong>in</strong>g and Commission<strong>in</strong>g of new Solid State (Electronic) Interlock<strong>in</strong>g System and<br />

Alteration to exist<strong>in</strong>g Solid State (Electronic) Interlock<strong>in</strong>g system con<strong>for</strong>m<strong>in</strong>g to RDSO<br />

Specification No. – RDSO/SPN/192/2005 with latest amendments and all associated<br />

outdoor works <strong>in</strong> connection of ‘Provision of automatic signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bidirectional<br />

signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong> Panki-Bhaupur<br />

section and at Panki & Bhaupur stations on Kanpur-Etawah section of Allahabad division<br />

of North Central Railway’.” as per tender papers at Annexure-A hereto the Contractor<br />

has submitted a tender as per Annexure-B hereto and whereas the said Tender of the<br />

Contractor has been accepted <strong>for</strong> .................. as per copy of Letter of Acceptance of<br />

Tender No..................................... dated ................... complete with enclosures at the<br />

accepted rates and agreed deviations from Tender Papers<br />

..................................................... as per Annexure-C hereto and at an estimated contract<br />

value of Rs...................... (Rupees ............................................................ only).<br />

Now this agreement witnesses that <strong>in</strong> consideration of the premises and the<br />

payment to be made by the purchaser to the contractor provided <strong>for</strong> here<strong>in</strong> below the<br />

Contractor shall supply all equipment and materials and execute and per<strong>for</strong>m all works<br />

<strong>for</strong> which the said Tender of the Contractor has been accepted strictly accord<strong>in</strong>g to the<br />

various provisions <strong>in</strong> Annexure-B and C hereto and upon such supply, execute and<br />

per<strong>for</strong>m to the satisfaction of the purchaser and the purchaser shall pay to the Contractor<br />

at the rates accepted as per the said Annexure-C and <strong>in</strong> terms of provisions there<strong>in</strong>. In<br />

case if the Contractor is not a company <strong>in</strong>corporated under the Companies Act, 1956, the<br />

expression “Contractor” shall unless otherwise excluded by or repugnant to the subject or<br />

context mean and <strong>in</strong>clude each of the successors- <strong>in</strong>- <strong>in</strong>terest, agents, nom<strong>in</strong>ees, servants,<br />

beneficiaries etc. If it is a Sole Proprietorship bus<strong>in</strong>ess, <strong>in</strong> addition to this, such<br />

expression Contractor will also <strong>in</strong>clude, each of his heirs, executors, and legal<br />

representatives.<br />

Signature of contractor Page 94 of 127 Dy CSTE/IRPMU/Kanpur


In the witness where of the parties have hereunto set and subscribed their respective<br />

hands and/or seals day and year respectively mentioned aga<strong>in</strong>st their respective signature.<br />

Signed and delivered at .................................................................... by Shri<br />

..................................................... <strong>for</strong> and on behalf of Messers<br />

....................................................................... the Contractor with<strong>in</strong> named <strong>in</strong> the presence<br />

of :-<br />

1. Signature :<br />

Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address :<br />

2. Signature :<br />

Date :<br />

Name <strong>in</strong> block Capitals:<br />

Address:<br />

Signed and delivered at ............................................... <strong>for</strong> and on behalf of the<br />

President of India by Shri .......................................................... (General Manager or his<br />

successor) ................................ ……Railway ................................ M<strong>in</strong>istry of Railways<br />

(Railway Board) <strong>in</strong> the presence of:-<br />

1. Signature :<br />

Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address:<br />

2. Signature:<br />

Date :<br />

Name <strong>in</strong> block Capitals :<br />

Address :<br />

Annexure -A<br />

Annexure -B<br />

Annexure -C<br />

: Tender Paper No.<br />

: Firm’s Tender No.<br />

: Letter of Acceptance of Tender<br />

Complete with enclosures.<br />

_________________________<br />

(Signature)<br />

Dated:<br />

Signature of contractor Page 95 of 127 Dy CSTE/IRPMU/Kanpur


FORM-4<br />

Para 3.2/Section II Chapter 2<br />

FORMAT OF BANK GURANTEE <strong>for</strong> PERFORMANCE GUARANTEE<br />

(On Stamp Paper of Appropriate value)<br />

(To be used by approved Scheduled Banks)<br />

1. In consideration of the President of India (here<strong>in</strong>after called “the Government”)<br />

hav<strong>in</strong>g agreed to exempt .................................................... (here<strong>in</strong>after called “The<br />

said contractor(s)”) from the demand, under the terms and conditions of an<br />

agreement No........................................... dated .................... made between<br />

.............................. and .................... <strong>for</strong> .............................................................<br />

(here<strong>in</strong> after called “the said agreement”) of Security Deposit <strong>for</strong> the due<br />

fulfillment by the said contractor(s) of the terms and conditions conta<strong>in</strong>ed <strong>in</strong> the<br />

said Agreement, or production of a Bank Guarantee <strong>for</strong> Rs............. (Rupees<br />

....................................... only), we...............................................................<br />

(<strong>in</strong>dicate the name of Bank) (here<strong>in</strong>after referred to as<br />

‘the Bank”) at the request of ................................. Contractor(s) do hereby<br />

undertake to pay to the Government an amount not exceed<strong>in</strong>g Rs............................<br />

aga<strong>in</strong>st any loss or damage caused to or suffered or would be caused to or<br />

suffered by the Government by reason of any breach by the said Contractor(s) of<br />

any of the terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement.<br />

2. We ...................................................................... Bank do hereby undertake to pay<br />

the amounts due and payable under this Guarantee without any demur, merely on<br />

demand from the Government stat<strong>in</strong>g the amount is claimed is due by way of loss<br />

or damage caused to or would be caused to or suffered by the Government by<br />

reason of breach by the said Contractor(s) of any of terms or conditions conta<strong>in</strong>ed<br />

<strong>in</strong> the said Agreement or by reason of the Contractor(s) failure to per<strong>for</strong>m the said<br />

Agreement. Any such demand made on the Bank shall be conclusive as regards<br />

the amount due and payable by the Bank under this guarantee. However, our<br />

liability under this guarantee shall be restricted to an amount not exceed<strong>in</strong>g<br />

Rs...............................<br />

3. We .................................................................... bank undertake to pay to the<br />

Government any money so demanded notwithstand<strong>in</strong>g any dispute or disputes<br />

raised by the Contractor(s)/Supplier(s) <strong>in</strong> any suit or proceed<strong>in</strong>gs pend<strong>in</strong>g be<strong>for</strong>e<br />

any court or Tribunal relat<strong>in</strong>g thereto our liability under this present be<strong>in</strong>g<br />

absolute and unequivocal.The payment so made by us under this Bond shall be a<br />

valid discharge of our liability <strong>for</strong> payment there under and the Contractor(s)/<br />

Supplier(s) shall have no claim aga<strong>in</strong>st us <strong>for</strong> mak<strong>in</strong>g such payment.<br />

Signature of contractor Page 96 of 127 Dy CSTE/IRPMU/Kanpur


4. We ........................................................... Bank further agree that the Guarantee<br />

here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong> full <strong>for</strong>ce and effect dur<strong>in</strong>g the period that would<br />

be taken <strong>for</strong> the per<strong>for</strong>mance of the said Agreement and that it shall cont<strong>in</strong>ue to be<br />

en<strong>for</strong>ceable till all the dues of the Government under or by virtue of the said<br />

agreement have been fully paid and its claims satisfied or discharged or<br />

till.................... office/ department) M<strong>in</strong>istry of ...................... certifies that the<br />

terms and conditions of the said agreement have been fully and properly carried<br />

out by the said contractor(s) and accord<strong>in</strong>gly discharges this Guarantee. Unless a<br />

demand or claim under the Guarantee is made on us <strong>in</strong> writ<strong>in</strong>g on or be<strong>for</strong>e the<br />

................................. we shall be discharged from all liability under this Guarantee<br />

thereafter.<br />

5. We ................................................................................ further agree with<br />

(Indicate the name of bank)<br />

the Government that the Government shall have the fullest liberty without our<br />

consent without affect<strong>in</strong>g <strong>in</strong> any manner our obligations hereunder to vary any of<br />

the terms and conditions of the Agreement or to extend time of per<strong>for</strong>mance by<br />

the said Contractor(s) from time to time or to postpone <strong>for</strong> any time or from time<br />

to time any of the powers exercisable by the Government aga<strong>in</strong>st the said<br />

Contractor(s) and to <strong>for</strong>ebear or en<strong>for</strong>ce any other terms and conditions relat<strong>in</strong>g to<br />

the said Agreement and we shall not be relieved from our liability by reason of<br />

any such variation, or extension to the said Contractor(s) or <strong>for</strong> any <strong>for</strong>bearance,<br />

act or omission on the part of Government or any <strong>in</strong>dulgence by the Government<br />

to the said Contractor(s) or by any such matter or th<strong>in</strong>g whatsoever which under<br />

the law relat<strong>in</strong>g to sureties would but <strong>for</strong> this provision, have no effect of so<br />

reliev<strong>in</strong>g us.<br />

6. This Guarantee will not be discharged due to the change <strong>in</strong> the Constitution of the<br />

Bank or the Contractor(s)/Supplier(s).<br />

7. We ...................................................... lastly undertake not to revoke this<br />

(Indicate the name of bank)<br />

Guarantee dur<strong>in</strong>g its currency except with the previous consent of the<br />

Government <strong>in</strong> writ<strong>in</strong>g.<br />

Dated the .......................... day of ..................200 <strong>for</strong><br />

......................................................................................<br />

(Indicate the name of the bank)<br />

Signature of contractor Page 97 of 127 Dy CSTE/IRPMU/Kanpur


STATEMENT OF DEVIATIONS<br />

PROFORMA FOR STATEMENT OF DEVIATIONS<br />

FORM-5<br />

Para 4/ Section II Chapter 2<br />

1. The follow<strong>in</strong>g are the particulars of deviations from requirement of the<br />

<strong>in</strong>structions to Tenderers, General Conditions of Contract.<br />

1.1 Instructions to Tenderers & Condition of Tender<strong>in</strong>g<br />

CLAUSE DEVIATION REMARKS<br />

1.2 General Conditions of Contract<br />

(INCLUDING JUSTIFICATION)<br />

CLAUSE DEVIATION REMARKS<br />

1.3 Special Conditions of Contract<br />

(INCLUDING JUSTIFICATION<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

2. The follow<strong>in</strong>g are the particulars of deviations from requirement of the technical<br />

specifications :<br />

( Separate Statement <strong>for</strong> each specification)<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

Note: Where there is no deviation, the statement should be returned duly signed with<br />

an endorsement <strong>in</strong>dicat<strong>in</strong>g no deviations.<br />

Signature of contractor Page 98 of 127 Dy CSTE/IRPMU/Kanpur


FORM-6<br />

Para-8.2/Section II Chapter 2<br />

STANDING INDEMNITY BOND<br />

(FOR ON ACCOUNT PAYMENTS & STORES SUPPLIED BY RLYS.)<br />

(On Stamp paper of Requisite Value)<br />

We, M/s............................................................. hereby undertake that we hold at<br />

our stores Depot/s at ................................................ <strong>for</strong> and on behalf of the President of<br />

India <strong>in</strong> the premises through the General Manager or his successor, North Central<br />

Railway (here<strong>in</strong> after referred to as “the Purchaser”) all materials <strong>for</strong> which “On<br />

Account” payments have been made to us aga<strong>in</strong>st the contract <strong>for</strong> “Design, Manufacture,<br />

Supply, Installation, Test<strong>in</strong>g and Commission<strong>in</strong>g of new Solid State (Electronic)<br />

Interlock<strong>in</strong>g System and Alteration to exist<strong>in</strong>g Solid State (Electronic) Interlock<strong>in</strong>g<br />

system con<strong>for</strong>m<strong>in</strong>g to RDSO Specification No. – RDSO/SPN/192/2005 with latest<br />

amendments <strong>in</strong> connection of ‘Provision of automatic signall<strong>in</strong>g on new 3rd l<strong>in</strong>e and bidirectional<br />

signall<strong>in</strong>g on exist<strong>in</strong>g automatic signall<strong>in</strong>g of Up l<strong>in</strong>e <strong>in</strong> Panki-Bhaupur<br />

section and at Panki & Bhaupur stations on Kanpur-Etawah section of Allahabad division<br />

of North Central Railway’ vide letter of Acceptance of Tender<br />

No....................................... dated ................ and the materials handed over to us by the<br />

purchaser <strong>for</strong> the purpose of execution of the said Contract, until such time the materials<br />

are duly erected or otherwise handed over to him.<br />

We shall be entirely responsible <strong>for</strong> the site custody and protection of the said<br />

materials aga<strong>in</strong>st all risk till they are duly delivered as erected equipment to the purchaser<br />

or as he may direct otherwise and shall <strong>in</strong>demnify the Purchaser aga<strong>in</strong>st any loss, damage<br />

or deterioration what so ever <strong>in</strong> respect of the said materials while <strong>in</strong> our possession and<br />

aga<strong>in</strong>st disposal of surplus materials. The said materials shall at all times be open to<br />

<strong>in</strong>spection by any Officer authorized by the Chief Project Manager/IRPMU, N C<br />

Railway, Shivaji Bridge, New Delhi.<br />

Should any loss, damage or deterioration of materials occur or surplus materials<br />

disposed off and refund becomes due, the purchaser shall be entitled to recover from us<br />

the full cost as per prices <strong>in</strong>cluded <strong>in</strong> the Contract (as applicable) and also<br />

compensation <strong>for</strong> such loss or damage if any along with<br />

the amount to be refunded without prejudice to any other remedies available to him by<br />

deduction from any sum due or any sum which at any time hereafter becomes due to us<br />

under the said or any other Contract.<br />

Signature of Witness:<br />

Name of Witness <strong>in</strong> block letters:<br />

Address:<br />

Dated this ...................... day of ........................, 2008.<br />

<strong>for</strong> and on behalf of<br />

Messers ........................................ (Contractor)<br />

Signature of contractor Page 99 of 127 Dy CSTE/IRPMU/Kanpur


FORM-7<br />

Para-22.2/Section II Chapter 1<br />

SYSTEM PERFORMANCE GUARANTEE<br />

PROFORMA FOR THE SYSTEM PERFORMANCE GUARANTEE<br />

To<br />

The President of India,<br />

I/We........................................................................................ hereby guarantee that<br />

the design on the basis of which we have submitted our Tender<br />

No................................................. has been carefully made to con<strong>for</strong>m to the end<br />

objectives <strong>in</strong> the tender documents and to technical specification there<strong>in</strong>. We further<br />

guarantee that <strong>in</strong> the event of the per<strong>for</strong>mance of the system, when <strong>in</strong>stalled, not<br />

comply<strong>in</strong>g with the end objectives or with the specifications conta<strong>in</strong>ed <strong>in</strong> the tender<br />

documents, we shall provide further <strong>in</strong>puts to enable the Railways to realise the end<br />

objectives conta<strong>in</strong>ed <strong>in</strong> these documents without any additional payment <strong>for</strong> any<br />

additional equipment which may be required <strong>in</strong> this regard. We further guarantee that all<br />

the expenses <strong>in</strong>clud<strong>in</strong>g the expenses <strong>in</strong>curred <strong>in</strong> India <strong>for</strong> provid<strong>in</strong>g the additional <strong>in</strong>puts<br />

under the System guarantee will be borne by us. We further guarantee that these<br />

additional <strong>in</strong>puts will be provided by us to make the system workable with<strong>in</strong> 8 months<br />

from the date on which this guarantee is <strong>in</strong>voked by the Purchaser.<br />

(Signature of firm’s authorised officer)<br />

Seal:<br />

Signature of Witness:<br />

1..................................................<br />

2.................................................<br />

Signature of contractor Page 100 of 127 Dy CSTE/IRPMU/Kanpur


FORM-9<br />

Para 18.4/ Section II Chapter 2<br />

CERTIFICATE<br />

Jo<strong>in</strong>t Inspection of Cable Trench & Protective Works<br />

1. The cable trench/chase <strong>in</strong>clud<strong>in</strong>g ducts, pipes etc. arrangements enroute has been<br />

jo<strong>in</strong>tly <strong>in</strong>spected by us on the follow<strong>in</strong>g sections and the work has been done<br />

accord<strong>in</strong>g to the specifications. The lay<strong>in</strong>g of cable can be taken on these<br />

sections after the deficiencies noted below are rectified and offered <strong>for</strong><br />

further check .<br />

2.<br />

----------------------------------------------------------------------------------------<br />

Sl.No. From KM. To KM. Remarks/Deficiency if any<br />

------------------------------------------------------------------------------------------------<br />

------------------------------------------------------------------------------------------------<br />

3. The follow<strong>in</strong>g Jo<strong>in</strong>ts have been jo<strong>in</strong>tly supervised and provided as per<br />

manufacturer’s <strong>in</strong>structions and it is confirmed that all the materials or kit<br />

have been used up.<br />

----------------------------------------------------------------------------------------<br />

Sl.No. Type of Jo<strong>in</strong>t Location(KM. No.) Remarks/Deficiency if any<br />

----------------------------------------------------------------------------------------<br />

----------------------------------------------------------------------------------------<br />

Signature of Contractor’s<br />

Representative with<br />

Designation<br />

Signature of Purchaser’s<br />

Representative with<br />

Designation<br />

Signature of contractor Page 101 of 127 Dy CSTE/IRPMU/Kanpur


ACKNOWLEDGEMENT<br />

FORM-10<br />

Para-8.3/Section II Chapter 2<br />

(FOR RECEIVING MATERIALS FROM RAILWAY)<br />

Sub: - Receipt of Materials from Railway.<br />

Station:<br />

Date:<br />

It is hereby acknowledged that the follow<strong>in</strong>g material as detailed have<br />

been received <strong>in</strong> full and good condition by me on .............<br />

........................... at ........................ <strong>for</strong> the work com<strong>in</strong>g under the<br />

Agreement No.............................. dated ................<br />

----------------------------------------------------------------------------------------<br />

Sl.No. Description of Material Quantity Remarks<br />

if any<br />

----------------------------------------------------------------------------------------<br />

----------------------------------------------------------------------------------------<br />

Witnessed by: -<br />

-------------------------------- ------------------------------------<br />

(Signature of Purchaser’s<br />

(Signature of Contractor or<br />

Representative with<br />

Contractor’s Representative)<br />

Designation )<br />

Signature of contractor Page 102 of 127 Dy CSTE/IRPMU/Kanpur


FORM-11<br />

Para-35/Section II Chapter 2<br />

EXTENSION OF PERIOD OF COMPLETION OF WORK<br />

ON CONTRACTOR’S ACCOUNT<br />

(Regd. With A/D)<br />

No. Date :<br />

To<br />

.............................................<br />

.............................................<br />

Sub : (i) ................................................. (Name of Work)<br />

(ii) Acceptance Letter No. ....................................................<br />

(iii) Undertak<strong>in</strong>g /Agreement No. .......................................<br />

Dear Sir,<br />

Ref : ......................... (Quote specific application of the Contractor <strong>for</strong> extension<br />

to date, if received).<br />

The stipulated date <strong>for</strong> completion of the work mentioned above is/was ...............<br />

. However, the work is/was not completed on this date.<br />

Expect<strong>in</strong>g that you may be able to complete the work if some time is given and <strong>in</strong><br />

consideration of your Letter No.............................., the General Manager (or his<br />

successor) on behalf of the president of India, although not bound to do so, hereby<br />

extends the time <strong>for</strong> completion from ............. to ..............<br />

Please note that liquidated damages @1/2% per week or part thereof of the entire<br />

contract value will be recovered <strong>for</strong> delay <strong>in</strong> the completion of the work after the expiry<br />

of (1) ....................... from you as mentioned <strong>in</strong> para 35 of the Special Conditions of<br />

Contract <strong>for</strong> the extended period.<br />

The above extension of the completion date will also be subject to the further<br />

condition that no <strong>in</strong>crease <strong>in</strong> rates on any account will be payable to you.<br />

Please note that <strong>in</strong> the event of decl<strong>in</strong><strong>in</strong>g to accept the extension on the above said<br />

conditions or <strong>in</strong> the event of your failure after accept<strong>in</strong>g or act<strong>in</strong>g up to this extension to<br />

complete the work by (2)....................... (here mention the extended date), further action<br />

will be taken <strong>in</strong> terms of relevant para of Conditions of Contract.<br />

Yours’ faithfully,<br />

<strong>for</strong> & on behalf of President of India.<br />

Note:-<br />

1. Give here the stipulated date <strong>for</strong> completion without any penalty fixed earlier.<br />

2. Here mention the extended date.<br />

Signature of contractor Page 103 of 127 Dy CSTE/IRPMU/Kanpur


FORM-12<br />

Para-36/Section II Chapter 2<br />

EXTENSION OF PERIOD OF COMPLETION OF WORK<br />

No. Date :<br />

To<br />

..................................<br />

..................................<br />

..................................<br />

Dear Sirs,<br />

Sub : (i) ............................................ (Name of work)<br />

(ii) Acceptance Letter No.........................................<br />

(iii) Undertak<strong>in</strong>g/Agreement No...............................<br />

Ref : .......................... (quote specific application of the<br />

contractor <strong>for</strong> extension to the date, if received) .<br />

The stipulated date <strong>for</strong> completion of subject work under the above contract was<br />

............................ In consideration of the Contractor’s Letter No..............................., The<br />

General Manager (or his successor) behalf of the President of India, is pleased to grant<br />

extension of the time <strong>for</strong> completion of works without liquidated damages under para 36<br />

of Chapter II , Section II of the contract as mentioned below :<br />

“...................................................................................”<br />

It may be noted that unless repugnant to the context, all the terms and<br />

conditions of the Contract will rema<strong>in</strong> unaltered dur<strong>in</strong>g the extended period from<br />

...................... to ...................... also, and further no <strong>in</strong>creased additional rates and claims<br />

of recoveries which have not been already envisaged <strong>in</strong> terms of the conditions of the<br />

Contract will be leviable either by you or by the purchaser <strong>in</strong> respect of this extended<br />

period.<br />

Yours faithfully,<br />

( )<br />

<strong>for</strong> and on behalf of President of India<br />

Signature of contractor Page 104 of 127 Dy CSTE/IRPMU/Kanpur


FORM-13<br />

QUALIFICATION EXPERIENCE<br />

a) List of Works Completed<br />

Description<br />

of Work<br />

Organization<br />

<strong>for</strong> whom<br />

executed<br />

Approx.<br />

value of<br />

contract at<br />

the time of<br />

award<br />

Date of<br />

award<br />

Date of<br />

scheduled<br />

completion<br />

of work<br />

Start<br />

Date of actual<br />

Completion<br />

F<strong>in</strong>al value<br />

of contract<br />

b) List of Works <strong>in</strong> Hand<br />

Description<br />

of work<br />

Contract Value<br />

Approx. value of<br />

balance work yet to<br />

be done<br />

Date of Award<br />

Signature of contractor Page 105 of 127 Dy CSTE/IRPMU/Kanpur


FORM-14<br />

RECEIPT CERTIFICATE (FOR SUPPLY ONLY)<br />

From: Sr. Section Eng<strong>in</strong>eer/Signal/ Kanpur or Tundla<br />

No.<br />

Date:<br />

1 Contract No<br />

2 Name of Work<br />

3 Item No. As <strong>in</strong> Rate Schedule<br />

4 Description of Item.<br />

5 Material <strong>in</strong>spected by :<br />

6 Dispatch particular & date<br />

7 Qty as per dispatch particular<br />

8 Qty received<br />

9 Qty short received<br />

10 Condition of Stores Received<br />

11 Name of Firm & Address<br />

12 Place of receipt<br />

13 Date of receipt<br />

14 Ledger No.<br />

15 Name & designation of Stores Incharge<br />

--------------------------------------<br />

Signature of contractor Page 106 of 127 Dy CSTE/IRPMU/Kanpur


Signature of Stores-<strong>in</strong>-Charge<br />

FORM-15<br />

ELECTRONIC CLEARING SERVICE (CREDIT CLEARING)<br />

(MODEL MANDATE FORM)<br />

(INVESTOR/CUSTOMER’S OPTION TO RECEIVE PAYMENTS THROUGH<br />

CREDIT CLEARLING MECHANISM)<br />

(Scheme name and the periodicity of payment)<br />

1. INVESTOR/CUSTOMER’S NAME<br />

2. PARTICULARS OF BANK ACCOUNT<br />

A. BANK NAME<br />

B. BRANCH NAME<br />

ADDRESS<br />

TELEHPONE<br />

C. 9-DIGIT CODE NUMBER OF<br />

THE BANK & BRANCH<br />

(Appear<strong>in</strong>g on the MICR cheque issued by the bank.)<br />

D. ACCOUNT TYPE<br />

(S.B. Account/Current Account or<br />

Cash Credit with Code 10/11/13)<br />

E. LEDGER NO./LEDGER FOLIO NO<br />

F. ACCOUNT NUMBER<br />

( As appear<strong>in</strong>g on the Cheque Book)<br />

(In lieu of the bank certificate to be obta<strong>in</strong>ed as under, please attach a blank cancelled<br />

cheque, or photocopy of a cheque or front page of your sav<strong>in</strong>gs bank passbook issued by<br />

your bank <strong>for</strong> verification of the above particulars.)<br />

3. DATE OF EFFECT.<br />

I hereby declare that the particulars given above are correct and complete. If the transaction<br />

is delayed or not effected at all <strong>for</strong> reasons of <strong>in</strong>complete or <strong>in</strong>correct <strong>in</strong><strong>for</strong>mation, I would<br />

not hold the User <strong>in</strong>stitution responsible. I have read the option <strong>in</strong>vitation letter and agree to<br />

discharge responsibility expected of me as a participant under the Scheme.<br />

Date:<br />

( )<br />

Signature of the Investor/Customer.<br />

Certified that the particulars furnished above are correct as per our records.<br />

( )<br />

Signature of the Authorized.<br />

Signature of contractor Page 107 of 127 Dy CSTE/IRPMU/Kanpur


Official from the Bank<br />

Section – III<br />

Chapter – 1<br />

Technical Specifications &<br />

Installation Practices<br />

Signature of contractor Page 108 of 127 Dy CSTE/IRPMU/Kanpur


TECHNICAL SPECIFICATIONS & INSTALLATION PRACTICES<br />

1. The works shall be carried out accord<strong>in</strong>g to the draw<strong>in</strong>gs approved by the Railway<br />

and shall con<strong>for</strong>m to the provisions of the ‘Signal Eng<strong>in</strong>eer<strong>in</strong>g Manual’ Schedule of<br />

“Dimension” and “Manual of Instructions <strong>for</strong> Installation of S&T equipment on 25<br />

KV, 50 Cycles, A. C. electrified sections as modified from time to time unless<br />

deviations, if any, are specifically approved by the Eng<strong>in</strong>eer. The contractor shall be<br />

solely responsible <strong>for</strong> the proper execution of the work as per the said deviation and<br />

specifications.<br />

2. Foundation:<br />

2.1 Con<strong>for</strong>m<strong>in</strong>g to the signall<strong>in</strong>g plan and cable plan the positions of foundations <strong>for</strong><br />

signal posts apparatus cases junction boxes cable term<strong>in</strong>ation boxes, shunt<strong>in</strong>g /<br />

block section limit board, power panel as required, will be <strong>in</strong>dicated by the<br />

Eng<strong>in</strong>eer’s representative at site be<strong>for</strong>e the commencement of the work at the<br />

station.<br />

2.2 The excavation of pits <strong>for</strong> various type of foundations shall be done as per draw<strong>in</strong>gs<br />

or the <strong>in</strong>structions given by Eng<strong>in</strong>eer’s representative and dur<strong>in</strong>g the excavation, the<br />

earth of the pit shall be thrown on pla<strong>in</strong> ground away from track and left out earth if<br />

any, shall be thrown outside the Railway premises.<br />

2.3 Be<strong>for</strong>e cast<strong>in</strong>g of foundation, the Contractor’s representative and the Eng<strong>in</strong>eer’s<br />

representative shall jo<strong>in</strong>tly <strong>in</strong>spect the quality and depth of pits, quality of bricks,<br />

concrete etc. and ensure compliance with the draw<strong>in</strong>gs and specifications.<br />

2.4 Signal posts and block section limit board shall be vertical and plumb and the gap<br />

between the base and the signal post shall be filled with chattern compound or any<br />

other approved substance.<br />

3. Apparatus case and signal erection<br />

3.1 The signal unit shall be properly mounted, secured, and focussed.<br />

3.2 Cable <strong>for</strong> signal units shall be taken <strong>in</strong>side the signal post. Exposed cable should be<br />

protected by suitable means.<br />

3.3 The apparatus cases, junction boxes, and cable term<strong>in</strong>ation boxes shall be vertical<br />

and plumb.<br />

4. Cable lay<strong>in</strong>g and term<strong>in</strong>ation<br />

Signature of contractor Page 109 of 127 Dy CSTE/IRPMU/Kanpur


4.1 Cable open<strong>in</strong>gs <strong>in</strong> Apparatus cases, junction boxes and <strong>in</strong> relay rooms should be<br />

covered by sand and top should be plastered by cement <strong>for</strong> apparatus cases and<br />

junction boxes.<br />

4.2 The cables <strong>in</strong> sufficient spare lengths shall be kept coiled <strong>in</strong> a circle of suitable<br />

diameter at 1 meter depth be<strong>for</strong>e be<strong>in</strong>g taken <strong>in</strong>to the relay rooms/apparatus cases<br />

and field operation <strong>for</strong> term<strong>in</strong>ation. Such coils of cables <strong>in</strong> pits shall be adequately<br />

covered by sand and bricks to provide protection aga<strong>in</strong>st damage.<br />

4.3 For each station/section, the cable route plan will be prepared be<strong>for</strong>e the<br />

commencement of the cable lay<strong>in</strong>g work at the stations. This plan can be altered as<br />

required under the exigencies of local conditions or <strong>for</strong> any other consideration, by<br />

the Eng<strong>in</strong>eer In charge. The Eng<strong>in</strong>eers representative <strong>in</strong> charge of the work will<br />

mark the route of the cable with chalk or lime, as per cable route plans/ cable plans<br />

as the Eng<strong>in</strong>eers <strong>in</strong>structions to him, that shall be taken by the contractor. He shall<br />

lay the cables only along this route. The contractor shall be present at the time of<br />

mark<strong>in</strong>g the route of the cable and he shall furnish to the Eng<strong>in</strong>eers representative<br />

required quantities of l<strong>in</strong>e, rope, labour etc. but carry<strong>in</strong>g out this work at the cost of<br />

the contractor.<br />

4.4 Cable lay<strong>in</strong>g should commence only after the depths and quality of trenches<br />

checked, quantity of bricks and arrangement <strong>for</strong> tempted fill<strong>in</strong>g etc. are <strong>in</strong>spected<br />

jo<strong>in</strong>ted by the Eng<strong>in</strong>eer’s representative and Contractor’s representative and<br />

approved by the Eng<strong>in</strong>eer’s representative. The measurements of length <strong>for</strong> all<br />

these items will be suitably recorded by the Eng<strong>in</strong>eer's representative who<br />

will permit the lay<strong>in</strong>g of cables after issu<strong>in</strong>g the certificates <strong>in</strong> Form No.9<br />

enclosed that the above works have been done as required by the Specifications.<br />

4.5 Trench<strong>in</strong>g <strong>for</strong> track cross<strong>in</strong>g and lay<strong>in</strong>g of cable across the track should be done<br />

only <strong>in</strong> the presence of the Eng<strong>in</strong>eers representative.<br />

4.6 Cable shall not be normally taken over the track at the time of cable lay<strong>in</strong>g by the<br />

contractor, as this is likely to cause accident to tra<strong>in</strong>s and damage to cable. If, at any<br />

time, the cable has to be taken across the track, it shall be done only <strong>in</strong> the presence<br />

of the Eng<strong>in</strong>eer’s representative and after the safety precautions have been taken.<br />

4.7 The handl<strong>in</strong>g, lay<strong>in</strong>g and pull<strong>in</strong>g of wires and cable shall be <strong>in</strong> accordance with<br />

<strong>in</strong>structions and under supervision of the contractor. For lay<strong>in</strong>g the cables, the drum<br />

shall be mounted on axle at one end of the trench and the cable laid out and carried<br />

by Contractor’s labourers guid<strong>in</strong>g the cable <strong>in</strong>to the trench.<br />

4.8 Cable should be properly term<strong>in</strong>ated <strong>in</strong> the term<strong>in</strong>al boards / racks.<br />

Signature of contractor Page 110 of 127 Dy CSTE/IRPMU/Kanpur


4.9 Bends <strong>in</strong> cables shall have a radius of not less than 20 times the diameter of the<br />

cables<br />

4.10 Eyelet term<strong>in</strong>als shall be used on flexible wires, if necessary.<br />

4.11 Not more than two wires shall be connected to one term<strong>in</strong>als/ tag.<br />

4.12 Cables term<strong>in</strong>ated <strong>in</strong>side apparatus cases, junction boxes and <strong>in</strong> relay room should<br />

be fixed by clamp or any other method <strong>in</strong>dicated by Eng<strong>in</strong>eers.<br />

4.13 Term<strong>in</strong>al shall be mounted so that they cannot be turned <strong>in</strong> base of frame to be<br />

applied. They shall be properly <strong>in</strong>sulated from each other and other metallic parts.<br />

4.14 Term<strong>in</strong>al shall be <strong>in</strong>stalled <strong>in</strong> and accessible position and neatly arranged on<br />

term<strong>in</strong>al boards <strong>in</strong> hous<strong>in</strong>gs.<br />

4.15 The term<strong>in</strong>al block provided at the locations, and other places shall be provided<br />

with suitable l<strong>in</strong>ks to facilitate isolation of the two sides of the circuits, which are<br />

connected to the term<strong>in</strong>al l<strong>in</strong>ks.<br />

4.16 With the help of mega ohmmeter, <strong>in</strong>sulation resistance test shall be conducted on<br />

all cores of each cable jo<strong>in</strong>tly by the representative of the Eng<strong>in</strong>eer and the<br />

contractor be<strong>for</strong>e the cable is connected or the wired to the signall<strong>in</strong>g equipment.<br />

The <strong>in</strong>sulation resistance shall be measured between a core and all other cores<br />

connected together to the sheath and earth. The results of the <strong>in</strong>sulations resistance<br />

test shall be tabulated <strong>in</strong> the <strong>for</strong>m given as Annexure-I and the <strong>for</strong>m signed by the<br />

representative of the contractor and the Eng<strong>in</strong>eer.<br />

4.17 With the help of suitable multimeter, loop resistance test shall be conducted on all<br />

cores of each cable jo<strong>in</strong>tly by the representatives of the Eng<strong>in</strong>eer and the contractor<br />

be<strong>for</strong>e the cable is connected or wired to the signall<strong>in</strong>g equipment. The result of the<br />

loop resistance test shall be tabulated <strong>in</strong> the <strong>for</strong>m given as Annexure –II and the<br />

<strong>for</strong>m signed by the representatives of the Contractor and the Eng<strong>in</strong>eer.<br />

5. Relay Racks<br />

5.1 Relay racks should be of metal, which can be assembled with plug –<strong>in</strong>- base plates<br />

and factory pre- wired base plates <strong>for</strong> ready <strong>in</strong>stallations. The rack <strong>in</strong>clude all the<br />

necessary rack fitt<strong>in</strong>gs, supports <strong>in</strong> the relay room arrangement <strong>for</strong> fix<strong>in</strong>g fuses and<br />

relay bases, as per approved Northern Railway draw<strong>in</strong>gs. The outside colour should<br />

be light yellow coloured. It should be powder coated <strong>for</strong> long life. It should be<br />

corrosive resistant.<br />

5.2 Relay rack shall be provided with anti-vibration protection.<br />

Signature of contractor Page 111 of 127 Dy CSTE/IRPMU/Kanpur


5.3 Relay rack shall be mounted <strong>in</strong> the relay room as per the position <strong>in</strong>dicated by the<br />

Railway representative.<br />

5.4 MDF Rack will be similar to relay rack and will <strong>in</strong>clude all materials required <strong>for</strong><br />

<strong>for</strong>mation of outdoor/ <strong>in</strong>door cables fix<strong>in</strong>g of term<strong>in</strong>als, fuses, fuse basis,<br />

trans<strong>for</strong>mers and other accessories as per <strong>in</strong>structions of Eng<strong>in</strong>eer at site.<br />

6. Relays<br />

6.1 General<br />

In case of A.C. electrified areas, the relays shall be <strong>in</strong> con<strong>for</strong>mity with RE manual.<br />

6.2 Design<br />

Relays shall be of a design approved by the Railways. Relay shall be provided with<br />

means to ensure that it cannot be plugged <strong>in</strong>to a wrong base.<br />

6.3 Mount<strong>in</strong>g<br />

Relay base plate shall be fixed on the relay racks <strong>for</strong> vertical mount<strong>in</strong>g. Relay base<br />

plate shall be phenolic moulded <strong>for</strong> other approved <strong>in</strong>sulated materials and shall<br />

have adequate mechanical and dielectric strength and <strong>in</strong>sulated qualities. The<br />

fasten<strong>in</strong>g of relay-to-relay base plate shall be so arranged as to securely hold the<br />

relay <strong>in</strong> place and yet be easily removable. Contact pressure between relay and base<br />

plate shall be adequate to keep constant un<strong>in</strong>terrupted contact.<br />

7. Seal<strong>in</strong>g and calibration<br />

The enclosure conta<strong>in</strong><strong>in</strong>g the mov<strong>in</strong>g parts of the relay shall be sealed with<br />

manufacturer’s seal or seal<strong>in</strong>g arrangement should be provided. Each coil shall have<br />

attached to it, secured by outside b<strong>in</strong>d<strong>in</strong>g, a tag which, shall be clearly and <strong>in</strong>delibly<br />

marked with the follow<strong>in</strong>g particulars.<br />

a) Manufacturer’s reference No.<br />

b) Size of wire and k<strong>in</strong>d of <strong>in</strong>sulation.<br />

c) Resistance of the coil( <strong>for</strong> DC relays only)<br />

d) No. of turns ( <strong>for</strong> DC relays only)<br />

8. Interconnections / wir<strong>in</strong>g<br />

8.1 Installation of control panel, cable term<strong>in</strong>ation and relay racks at the respective<br />

places shall have to be done. Wir<strong>in</strong>g of relay racks and control panel shall be<br />

Signature of contractor Page 112 of 127 Dy CSTE/IRPMU/Kanpur


carried out as per circuit diagram approved by the Railways provid<strong>in</strong>g<br />

<strong>in</strong>terconnection arrangements between the racks and control panels.<br />

8.2 Interconnection between term<strong>in</strong>al racks / boards and relay racks shall be carried<br />

out by provid<strong>in</strong>g ladder arrangements or by any other arrangements as <strong>in</strong>structed by<br />

Eng<strong>in</strong>eer’s representative.<br />

8.3 The equipments are to be wired <strong>in</strong> relay room, power supply arrangement,<br />

apparatus case, cable term<strong>in</strong>ation box, and battery box and <strong>in</strong> other locations.<br />

8.4 Cable term<strong>in</strong>ation racks should be erected <strong>in</strong> the relay room, Suitable cable ducts as<br />

required, shall be provided to br<strong>in</strong>g all outside cable to the term<strong>in</strong>ation rack. RCC<br />

slabs shall be manufactured at site and covered. All the cables are to be neatly fixed<br />

and term<strong>in</strong>ated <strong>in</strong> order.<br />

8.5 It shall be possible to identify wires to all term<strong>in</strong>als by means of non- metallic tag<br />

or level on which is stamped the designation correspond<strong>in</strong>g to that is on the circuit<br />

and wir<strong>in</strong>g plan. Contractor may adopt any other means subject to approval of the<br />

Railways. Tag shall be applied <strong>in</strong> such a manner that if a wire is removed from the<br />

term<strong>in</strong>al, the tag will rema<strong>in</strong> on the wire.<br />

8.8 Where practicable the tags or labels shall be securely fastened adjacent to the<br />

term<strong>in</strong>als or suitably pa<strong>in</strong>ted so that the number can be easily read.<br />

8.9 All wir<strong>in</strong>g <strong>in</strong> the cab<strong>in</strong> and location shall be term<strong>in</strong>ated on suitable term<strong>in</strong>al<br />

block/tag blocks hav<strong>in</strong>g m<strong>in</strong>imum <strong>in</strong>sulation resistance of 500 Meg. ohms at 500 V<br />

DC. The term<strong>in</strong>al blocks/tag blocks shall be covered with plastic cover.<br />

8.10 Contact number<strong>in</strong>g <strong>for</strong> the relays shall be made by the contractor as per the circuit<br />

diagram approved by the railway and type of relay proposed to be used on the<br />

<strong>in</strong>stallation.<br />

8.11 No jo<strong>in</strong>ts are permitted <strong>in</strong> the connection wires.<br />

8.12 Wir<strong>in</strong>g <strong>in</strong> relays hous<strong>in</strong>g shall be uni<strong>for</strong>m <strong>for</strong> like apparatus through out the<br />

<strong>in</strong>stallation.<br />

8.13 Wir<strong>in</strong>g <strong>in</strong>side one rack <strong>for</strong> plug <strong>in</strong> Contact relays type (Metal to Carbon)<br />

Relay rack wir<strong>in</strong>g hous<strong>in</strong>g plug <strong>in</strong> type relays con<strong>for</strong>m<strong>in</strong>g to BRS-930 and BRS<br />

shall be done with" PVC <strong>in</strong>sulated unsheathed flame retard<strong>in</strong>g type s<strong>in</strong>gle core<br />

flexible wire 1100V grade hav<strong>in</strong>g l6/0.2mm annealed copper conductor and<br />

nom<strong>in</strong>al cross sectional area of 0.5 Sq. mm of common colour code to the<br />

Signature of contractor Page 113 of 127 Dy CSTE/IRPMU/Kanpur


specification IS: 694". For wir<strong>in</strong>g these relays the above wires shall be term<strong>in</strong>ated<br />

on eyelet /lugs of standard design.<br />

8.14 Solder<strong>in</strong>g at the tag block term<strong>in</strong>als shall be made us<strong>in</strong>g good quality solder and<br />

flux. Care must be taken to prevent dropp<strong>in</strong>g of excessive solder from term<strong>in</strong>al<br />

thereby caus<strong>in</strong>g failure/unwanted connection or short by fus<strong>in</strong>g of PVC <strong>in</strong>sulation<br />

<strong>in</strong> the row below it. It is advisable to raise the wires by mechanical means and<br />

temporarily <strong>in</strong>terpos<strong>in</strong>g a wooden or plastic sheet between the adjacent rows while<br />

solder<strong>in</strong>g, to collect the excessive solder that may be dropp<strong>in</strong>g out.<br />

8.15 After test<strong>in</strong>g, the loose wires on the cable ladder shall be neatly bunched and laced<br />

with tw<strong>in</strong>e black. The contractor shall adopt suitable colour code <strong>for</strong> wir<strong>in</strong>g as<br />

required by the Eng<strong>in</strong>eer <strong>in</strong>-charge. Spare conductors to an extent of 10% are to be<br />

provided on the <strong>in</strong>terconnect<strong>in</strong>g wire runs <strong>for</strong> future developments <strong>in</strong> case of multicore<br />

cable are used.<br />

8.16 After the complete test<strong>in</strong>g by the Eng<strong>in</strong>eer <strong>in</strong>-charge and be<strong>for</strong>e commission<strong>in</strong>g the<br />

<strong>in</strong>stallation, the contractor shall arrange necessary seal<strong>in</strong>g leads and wires <strong>for</strong><br />

seal<strong>in</strong>g the relays.<br />

8.17 The nomenclature of each relay shall be pa<strong>in</strong>ted both <strong>in</strong> front and rear side of each<br />

relay with contact configuration. The relay <strong>in</strong>dex sheet duly pa<strong>in</strong>ted of details of<br />

relay and their position <strong>in</strong> the relay rack shall be manufactured out of Decolum<br />

/Nova pan sheet and fixed <strong>in</strong> the relay room. All the relays to be plugged shall be<br />

checked visually and defect if any, noticed shall be replaced, duly report<strong>in</strong>g the<br />

same to the Railways. As made relay rack wir<strong>in</strong>g and contact chart of all relays<br />

shall be prepared <strong>in</strong> l<strong>in</strong>en/polyester sheets, duly signed and handed over to<br />

Railways <strong>for</strong> preparation of hand<strong>in</strong>g -over documents to ma<strong>in</strong>tenance organisation.<br />

8.18 Suitable arrangements shall be made <strong>in</strong> the relay rack <strong>for</strong> fix<strong>in</strong>g condenser and<br />

resistance unit, required <strong>for</strong> slow to release feature. Letter pa<strong>in</strong>t<strong>in</strong>g shall be made<br />

aga<strong>in</strong>st each unit to identify circuit <strong>for</strong> which it is used.<br />

9. FUSES, TERMINAL AND TERMINAL LINKS<br />

FUSES<br />

a) It shall not be possible to <strong>in</strong>sert a cartridge of a higher rat<strong>in</strong>g <strong>in</strong>to a holder of lower<br />

rat<strong>in</strong>g.<br />

b) Fuses shall be of non-deteriorat<strong>in</strong>g type confirm<strong>in</strong>g to RDSO specification.<br />

c) Fuse clips shall be mounted on an <strong>in</strong>sulat<strong>in</strong>g base of fireproof material.<br />

d) Fuses or circuits breakers shall be <strong>in</strong>stalled accord<strong>in</strong>g to standard practice with prior<br />

approval of the Railway.<br />

Signature of contractor Page 114 of 127 Dy CSTE/IRPMU/Kanpur


10. INSULATION<br />

Provision of <strong>in</strong>sulation wherever required to follow standard approved Railway<br />

practice <strong>for</strong> the purpose. Material used <strong>for</strong> <strong>in</strong>sulation shall be such that it will not<br />

be <strong>in</strong>juriously affected by atmospheric conditions.<br />

11 EARTHING<br />

12.1 Earth<strong>in</strong>g of SER/BER/LSC: Perimeter Ground<strong>in</strong>g System<br />

Not applicable.<br />

12.2 Way Side Equipment Earth<strong>in</strong>g<br />

Wayside equipment, apart <strong>for</strong>m po<strong>in</strong>ts mach<strong>in</strong>es and associated rodd<strong>in</strong>g, shall be<br />

provided with earth<strong>in</strong>g to protect the <strong>in</strong>stallation from lightn<strong>in</strong>g related surges and<br />

possible fallen overhead traction conductors. If the equipment is isolated (no other<br />

equipment with<strong>in</strong> 30m), the equipment shall be provided with its own earth<strong>in</strong>g<br />

electrode(s). The equipment shall be bonded to the electrode us<strong>in</strong>g 6 SWG GI<br />

wire supported on MS flat size 5 mm x 40 mm . The cable shall be buried 500mm<br />

below ground level. The cable shall be Cadwelded to the electrode and attached to<br />

the equipment us<strong>in</strong>g a brass bolt (through a lug).<br />

12.3 Follow<strong>in</strong>g is the list of generally recommended maximum values of Earth<br />

resistances <strong>for</strong> various equipment.. Wherever, values prescribed here <strong>for</strong> the<br />

equipment are <strong>in</strong> contradiction to value prescribed by the manufacturer, the one<br />

which is lesser of the two should be achieved.<br />

S. No. Equipment Maximum Value of<br />

System Earth<strong>in</strong>g<br />

Resistance<br />

I SER/BER/LSC 5 Ohms<br />

II Location Box Def<strong>in</strong>ed by External<br />

Gear bonded to it.<br />

(i) Axle Counter 5 Ohms<br />

(ii)<br />

Equipment <strong>in</strong> Station Masters<br />

Room<br />

5 Ohms<br />

(iii) AFTC 5 Ohms<br />

Signature of contractor Page 115 of 127 Dy CSTE/IRPMU/Kanpur


(iv) Signal Post 10 Ohms<br />

(v) Level Cross<strong>in</strong>g 10 Ohms<br />

12.4 Earth Electrode shall be tested as per <strong>in</strong>struction of Earth<strong>in</strong>g given as Annexure-<br />

III and the result shall be recorded <strong>in</strong> the Form given with the <strong>in</strong>structions as per<br />

Annexure-III. The <strong>for</strong>m should be signed by the representative of the Contractor<br />

and the Eng<strong>in</strong>eer.<br />

12 POINT MACHINES<br />

Electrically operated po<strong>in</strong>t mach<strong>in</strong>es comb<strong>in</strong>ed type shall be fitted <strong>in</strong> level to all<br />

po<strong>in</strong>ts as per signall<strong>in</strong>g plan on long sleepers on extended gauge tie plate, clear of<br />

<strong>in</strong>fr<strong>in</strong>gement as per the latest RDSO Draw<strong>in</strong>g.<br />

The po<strong>in</strong>t mach<strong>in</strong>e shall be <strong>in</strong>stalled after clean<strong>in</strong>g both <strong>in</strong>side and outside the<br />

mach<strong>in</strong>e, after greas<strong>in</strong>g/oil<strong>in</strong>g to all mov<strong>in</strong>g parts. The po<strong>in</strong>t mach<strong>in</strong>e shall be hand<br />

operated and detection and motor-controll<strong>in</strong>g contacts shall be adjusted be<strong>for</strong>e<br />

tak<strong>in</strong>g to site. All unwanted open<strong>in</strong>gs shall be covered with MS sheets.<br />

The po<strong>in</strong>t mach<strong>in</strong>es shall be fixed with 20mm x 250mm size bolts, nuts and<br />

flat/spr<strong>in</strong>g washers with correct size of holes through the special sleepers to avoid<br />

lateral/longitud<strong>in</strong>al play on extended gauge tie plate.<br />

All po<strong>in</strong>t connect<strong>in</strong>g rods shall be connected to po<strong>in</strong>t mach<strong>in</strong>es without any stra<strong>in</strong><br />

and with M<strong>in</strong>. offset. All connect<strong>in</strong>g rods shall be <strong>in</strong> level and correct size of bolts<br />

and nuts shall be used to avoid longitud<strong>in</strong>al play. Any changes <strong>in</strong> the connect<strong>in</strong>g<br />

rodd<strong>in</strong>gs dur<strong>in</strong>g <strong>in</strong>stallation which necessitates weld<strong>in</strong>g and offsets shall be carried<br />

out by the Contractor at site. The weld<strong>in</strong>g shall be by smithy process. Lengthy<br />

rodd<strong>in</strong>gs shall be supported suitably by roller guides.<br />

All the wooden sleepers on which the po<strong>in</strong>t mach<strong>in</strong>e is <strong>in</strong>stalled shall be strapped<br />

on both sides with 50 mm x 20 mm MS strap. Necessary holes 21.5 mm diameter<br />

shall be drilled on the strap and 20mm diameter bolts and nuts shall be used <strong>for</strong><br />

fix<strong>in</strong>g to the sleepers.<br />

Separate MS junction box/boxes shall be <strong>in</strong>stalled clear of <strong>in</strong>fr<strong>in</strong>gement near the<br />

po<strong>in</strong>t mach<strong>in</strong>e and the respective cables shall be term<strong>in</strong>ated. The lead<strong>in</strong>g <strong>in</strong> wires<br />

from the boxes shall be taken through flexible conduct PVC pipes and securely<br />

fixed. The wir<strong>in</strong>g <strong>in</strong>side the po<strong>in</strong>t mach<strong>in</strong>e <strong>for</strong> motor and detector circuit shall be<br />

carried out neatly. All the electrical wir<strong>in</strong>g shall be tested <strong>for</strong> <strong>in</strong>sulation and earth<br />

Signature of contractor Page 116 of 127 Dy CSTE/IRPMU/Kanpur


and all connections tightened 3/0.75mm. PVC copper wire / cable shall be used <strong>for</strong><br />

wir<strong>in</strong>g po<strong>in</strong>t mach<strong>in</strong>es as per standard practice approved by Railways.<br />

Po<strong>in</strong>t mach<strong>in</strong>es and MS junction boxes shall be pa<strong>in</strong>ted and po<strong>in</strong>t numbers shall be<br />

pa<strong>in</strong>ted neatly. Wir<strong>in</strong>g diagram shall be pa<strong>in</strong>ted on the <strong>in</strong>side of the po<strong>in</strong>t mach<strong>in</strong>e<br />

cover.<br />

Where GRS type po<strong>in</strong>t mach<strong>in</strong>es are <strong>in</strong>stalled, fix<strong>in</strong>g of additional heavy-duty<br />

contactors (2 Nos. per po<strong>in</strong>t mach<strong>in</strong>e) of 40 Amp. capacity with 2 N.O. (heavy duty<br />

contacts) and 2 N.C. (auxiliary contacts) work<strong>in</strong>g on 110 V DC is to be carried out<br />

<strong>in</strong>side teak wood box of size 40 mm X 40 mm X 25 mm. The teakwood box shall<br />

be provided with acrylic sheet front door with lock<strong>in</strong>g arrangement. The above box<br />

with relays shall be fixed adjacent to po<strong>in</strong>t contactor unit <strong>in</strong> location box, and wired<br />

as per approved circuit diagram.<br />

13.1 ADJUSTMENT AND TESTING OF POINTS<br />

The po<strong>in</strong>t mach<strong>in</strong>e shall be worked by crank handle and the hous<strong>in</strong>g of switch rail<br />

with the stock rail shall be checked.<br />

The po<strong>in</strong>t mach<strong>in</strong>e shall be worked both ways with proper feed without undue<br />

friction and work<strong>in</strong>g current shall be recorded.<br />

The po<strong>in</strong>t detector and lock connections are adjusted <strong>in</strong> such a way that with a 3.25<br />

mm thick test piece obstruction placed between the switch and the stock rail at<br />

150mm from the top of the switch.<br />

1. The po<strong>in</strong>t does not get locked.<br />

2. The po<strong>in</strong>t detection circuit is not completed.<br />

13 LIFTING BARRIER GATES<br />

The Electrical lift<strong>in</strong>g barrier gate generally operates on 110V AC and uses 24V <strong>for</strong><br />

detection circuit. A small concrete foundation is done <strong>for</strong> mount<strong>in</strong>g the barrier<br />

mach<strong>in</strong>e, as per manufacturer’s requirement/draw<strong>in</strong>g. A GI/PVC pipe bend should<br />

be <strong>in</strong>stalled at the centre of the foundation <strong>for</strong> entry of power and control cables.<br />

Mechanism box should be fitted on foundation such that 4 Nos. of grout<strong>in</strong>g bolts<br />

protrude through the 4 Nos. holes provided at the bottom of mechanism box.<br />

Fitt<strong>in</strong>g of Mechanism box should be such that the double ended shaft protrud<strong>in</strong>g<br />

from mechanism is parallel to the road & towards the road.<br />

The mach<strong>in</strong>e is fitted to boom us<strong>in</strong>g counterbalance channels and balance weights.<br />

The foundation <strong>for</strong> boom stop cum lock<strong>in</strong>g device should be done after <strong>in</strong>stallation<br />

Signature of contractor Page 117 of 127 Dy CSTE/IRPMU/Kanpur


of barrier mach<strong>in</strong>e and boom.<br />

The circuit controller adjustments should be done after <strong>in</strong>stallation of barrier.<br />

The limit switches are provided on gear box shaft to control the auto stop <strong>in</strong> the<br />

fully open and closed position of the barriers.<br />

The friction clutch should be adjusted such that slippage torque of clutch is just<br />

sufficient to drive the barrier.<br />

14 TESTING AND COMMISSIONING<br />

Test<strong>in</strong>g and commission<strong>in</strong>g consists of f<strong>in</strong>al test<strong>in</strong>g of selection circuits, test<strong>in</strong>g of<br />

cables, test<strong>in</strong>g of track circuits, po<strong>in</strong>ts, signals as per SEM, and f<strong>in</strong>al<br />

commission<strong>in</strong>g of the entire signall<strong>in</strong>g arrangements <strong>for</strong> traffic use. All the<br />

alterations <strong>for</strong> improv<strong>in</strong>g safety shall be carried out be<strong>for</strong>e commission<strong>in</strong>g as<br />

required by the Railways. The contractor shall first test the equipment at his own<br />

level, followed by test<strong>in</strong>g done jo<strong>in</strong>tly with Railways. Test<strong>in</strong>g charges will be<br />

borne by the contractor. The contractor shall provide test panel <strong>for</strong> test<strong>in</strong>g at his<br />

own cost. The different stages and procedures <strong>for</strong> test<strong>in</strong>g of <strong>in</strong>door under outdoor<br />

equipment are given below as guidance.<br />

Stage 1:<br />

Stage II:<br />

Stage III:<br />

Test<strong>in</strong>g of the <strong>in</strong>terlock<strong>in</strong>g<br />

Test<strong>in</strong>g of the outdoor gears, i.e. Po<strong>in</strong>ts, signals, track circuits, LC<br />

gates, etc.<br />

commission<strong>in</strong>g of system by connect<strong>in</strong>g the outdoor gears to the<br />

panel.<br />

15 CONNECTING THE SIMULATION PANEL<br />

It shall be possible to simulate all TPRs, NWKRs/RWKRs, CHLRs, KLCRs,<br />

LXCPRs etc., from the simulation panel by energiz<strong>in</strong>g all the relays.<br />

It is desirable to have the simulation panel adjacent to control panel so that the<br />

panel <strong>in</strong>dication can be observed simultaneously while test<strong>in</strong>g.<br />

Connect<strong>in</strong>g simulation panel:<br />

Simulation panel consists of two Boards<br />

Board No.1: It depicts the yard (pa<strong>in</strong>ted) with po<strong>in</strong>ts, track' circuits, LC gates and<br />

slots. Switches are fixed on the board to simulate the conditions of the po<strong>in</strong>ts, track<br />

Signature of contractor Page 118 of 127 Dy CSTE/IRPMU/Kanpur


circuits, <strong>in</strong>terlocked LC gates, slots etc.<br />

Track circuit switches are fixed on the track. Po<strong>in</strong>t control switches are fixed nearer<br />

to the po<strong>in</strong>ts, <strong>for</strong> small yards. For major yards the switches are grouped as po<strong>in</strong>t<br />

switches and track circuit switches. Functions requir<strong>in</strong>g ON and OFF switch (with<br />

make and break facility ie, two wires only.) with facility to pick up a relay <strong>in</strong> one<br />

position and drop the same <strong>in</strong> other position.<br />

Example: Switch OFF - Track Down- TPR dropped. Switch ON - Track pick up -<br />

TPR picked up.<br />

For controll<strong>in</strong>g the follow<strong>in</strong>g function the above type switches shall be used. :-i)<br />

Track circuits, ii), Sid<strong>in</strong>g po<strong>in</strong>t, iii) Crank handle, iv) Slot) LC gate<br />

Po<strong>in</strong>ts require On and OFF switches with facility to pickup conflict<strong>in</strong>g relays i.e.<br />

NWKR and RWKR) <strong>in</strong> two positions. (These switches require three wires.)<br />

Board No.2: To simulate the signals the electric bulbs are used as dummy loads <strong>for</strong><br />

the ECRs to pick up and also to observe the aspect of the signals dur<strong>in</strong>g test<strong>in</strong>g.<br />

Wir<strong>in</strong>g simulation panel to the relay room side wir<strong>in</strong>g at MDF:<br />

Disconnect all the l<strong>in</strong>ks on cable term<strong>in</strong>ation rack. Wires from the switches are<br />

connected to the relay room side term<strong>in</strong>ation. Similarly the wires from simulation<br />

panel board. no. 2 consist<strong>in</strong>g of lamps are connected to the relay room side<br />

term<strong>in</strong>ation.<br />

0.6 mm multi-core cable is used <strong>for</strong> wir<strong>in</strong>g the simulation boards. To reduce the<br />

voltage drop, more conductors are used <strong>for</strong> supply taken to the test panel and also<br />

to the negative s<strong>in</strong>ce common return is used.<br />

16 TESTING OF INTERLOCKING<br />

Test<strong>in</strong>g of Relay Interlock<strong>in</strong>g consists of:<br />

Wire to wire bell-test of all sheets be<strong>for</strong>e solder<strong>in</strong>g and after solder<strong>in</strong>g.<br />

Plugg<strong>in</strong>g of all relays as per contact configuration.<br />

Simulation of track, po<strong>in</strong>ts etc. from simulation panel. Clear<strong>in</strong>g the signals from<br />

local control panel and carry<strong>in</strong>g out the follow<strong>in</strong>g tests (as per table of control)<br />

- Negative tests<br />

- Dead/Approach lock<strong>in</strong>g tests Route/Back lock<strong>in</strong>g tests<br />

- Test<strong>in</strong>g of conflict<strong>in</strong>g signals<br />

Signature of contractor Page 119 of 127 Dy CSTE/IRPMU/Kanpur


- Other circuits’ viz., KLCR, LXPR etc.<br />

17 TESTING OF OUTDOOR GEARS<br />

Test<strong>in</strong>g of outdoor gears consists of test<strong>in</strong>g of:<br />

- Signals<br />

- Motor operated po<strong>in</strong>ts<br />

- Track circuits<br />

- Axle counters<br />

- AFTC<br />

- LC gates (Interlocked)<br />

- Sid<strong>in</strong>gs<br />

Cable meggar<strong>in</strong>g and pair<strong>in</strong>g up of conductors shall be done.<br />

All the power cables shall be made through and power supply shall be extended to<br />

all locations.<br />

After the power cables are energized, check up each limb of the power cable<br />

whether anyearth fault exists us<strong>in</strong>g multi-meter. This will <strong>in</strong>dicate whether any<br />

cable conductor is faulty (i.e. earthed).<br />

Signals shall be <strong>in</strong>itially tested from the location box to attend to m<strong>in</strong>or troubles of<br />

<strong>in</strong>stallation defects, wir<strong>in</strong>g etc.<br />

All the aspects shall be checked by giv<strong>in</strong>g ll0V AC feed from location box and then<br />

the test shall be repeated by giv<strong>in</strong>g feed from Relay room CT rack. This test shall<br />

be done <strong>for</strong> each aspect, route and pilot lamp of shunt signals.<br />

Care shall be taken to ensure that no tra<strong>in</strong> is approach<strong>in</strong>g dur<strong>in</strong>g this test to avoid<br />

mislead<strong>in</strong>g <strong>in</strong><strong>for</strong>mation to drivers.<br />

Ensure that signal number plate is provided and unit back door is fastened and<br />

locked properly. Door lock<strong>in</strong>g is very important to prevent sunrays fall<strong>in</strong>g on to<br />

lenses to give phantom <strong>in</strong>dications.<br />

Focus the signal aspects, record the aspect voltages and ensure that it is with<strong>in</strong> the<br />

permissible limit.<br />

Po<strong>in</strong>ts shall be tested first locally from the location box when po<strong>in</strong>t contactor unit<br />

kept <strong>in</strong> location. Be<strong>for</strong>e commenc<strong>in</strong>g this test, ensure ll0V DC, 24 VDC are<br />

available <strong>in</strong> location box. If it is cross over po<strong>in</strong>t, it is preferable to test one by one<br />

and then test both at a time.<br />

Signature of contractor Page 120 of 127 Dy CSTE/IRPMU/Kanpur


(a) Siemen's Po<strong>in</strong>t contactor unit.<br />

Connect N 24V to W4, connect B 24V to WI, then remove so that N/R picks up and<br />

holds, then touch B24V to W3 to operate po<strong>in</strong>ts from normal to reverse. All the<br />

relays <strong>in</strong> po<strong>in</strong>t contactor unit operate as required and po<strong>in</strong>t operated from N to R.<br />

Check up whether NWKR supply to relay room is available. For reverse to normal<br />

operation, keep<strong>in</strong>g N 24V <strong>in</strong> W4 touch B24V on W1 and then on w2. Po<strong>in</strong>t<br />

operates from reverse to normal. Check up the RWKR supply to relay roam is<br />

available.<br />

(b) Po<strong>in</strong>t Contactor unit with QBCA1 Relays. Connect B 24V to W3 and N 24V to<br />

W4. WCR picks up. Connect B 24V to w2 and N 24V to W1 to pick up RWCR to<br />

operate the po<strong>in</strong>t from normal to reverse. After the po<strong>in</strong>t operation is completed,<br />

drop RWCR, WCR by disconnect<strong>in</strong>g the supply.<br />

Check up whether outgo<strong>in</strong>g RWKR supply is available <strong>in</strong> location box.<br />

For reverse to normal operation, change the polarity on W1 & W2 and check.<br />

Care shall be taken to check whether correct wir<strong>in</strong>g is done with regard to polarity<br />

Check up whether the cross protection wir<strong>in</strong>g is done on the electrical detector.<br />

Check up whether snubb<strong>in</strong>g is effective <strong>in</strong> case of GRS 5E po<strong>in</strong>t mach<strong>in</strong>e.<br />

The follow<strong>in</strong>g tests shall be carried out on Po<strong>in</strong>t Mach<strong>in</strong>es:<br />

i) Obstruction test.<br />

ii)<br />

iii)<br />

iv)<br />

Detection contact break test<br />

Out of correspondence test (<strong>in</strong> case of cross over po<strong>in</strong>t)<br />

Track lock<strong>in</strong>g test (to be done when operated from panel).<br />

This test is to be done <strong>for</strong> both N to R and R to N operations.<br />

Whether po<strong>in</strong>t can be hand cranked with <strong>in</strong>terlocked crank handle.<br />

Check the correspondence between po<strong>in</strong>t position at site, both the ends <strong>in</strong> case of<br />

crossover and NWKR/RWKR <strong>in</strong> relay room (to be done when tested from panel)<br />

All the track circuits shall be energized and outgo<strong>in</strong>g TPR voltages checked.<br />

Signature of contractor Page 121 of 127 Dy CSTE/IRPMU/Kanpur


Check whether cross protection wir<strong>in</strong>g is done <strong>for</strong> TPR circuit.<br />

Shunt the track circuit at various places on the track and check whether the track<br />

relay drops every time it is shunted. (Especially near foul<strong>in</strong>g marks).<br />

Check the correspondence between TR and TPR <strong>in</strong> relay room.<br />

Track circuit shall be adjusted properly and read<strong>in</strong>gs recorded. TSR value shall be<br />

recorded.<br />

Check whether the track circuit is protect<strong>in</strong>g the foul<strong>in</strong>g po<strong>in</strong>t.<br />

Ensure that at least one polarity rail is <strong>in</strong> series connection.<br />

Check up <strong>in</strong>put AC voltage to the track feed charger is sufficient and battery is<br />

gett<strong>in</strong>g charged.<br />

Check up the <strong>in</strong>terlock<strong>in</strong>g of L.C. Gates, sid<strong>in</strong>g po<strong>in</strong>ts.<br />

Check up <strong>for</strong> the proper function<strong>in</strong>g of electrical transmission of key transmitters.<br />

Check up the panel <strong>in</strong>dications<br />

Connect magneto telephone communication between SM and LC gate/sid<strong>in</strong>g.<br />

Ensure that respective signals cannot be taken off if LC/sid<strong>in</strong>g controls are not<br />

available with SM (i.e. on panel)<br />

Ensure that when the signals are taken off, respective LC gate/sid<strong>in</strong>g key cannot be<br />

extracted from the EKT.<br />

18 COMMISSIONING OF PANEL/ VDU<br />

Commission<strong>in</strong>g of panel consists of correspondence test of signals, po<strong>in</strong>ts, and<br />

track circuits with the control panel <strong>in</strong>dications.<br />

Check up all signals aspects by directly feed<strong>in</strong>g from cable term<strong>in</strong>ation rack (ll0V<br />

AC) .<br />

Check up operation of po<strong>in</strong>ts from CT rack and check whether NWRR/RWKR<br />

<strong>in</strong>com<strong>in</strong>g feed is available (by connect<strong>in</strong>g 24V DC to WI, W2, W3 & W4 as<br />

expla<strong>in</strong>ed earlier).<br />

Check up the <strong>in</strong>com<strong>in</strong>g feed of TPRs <strong>in</strong> the C.T. Rack. The above check<strong>in</strong>g will<br />

Signature of contractor Page 122 of 127 Dy CSTE/IRPMU/Kanpur


confirm the pair<strong>in</strong>g of cable conductors.<br />

Remove the wir<strong>in</strong>g connection of simulation board on cable term<strong>in</strong>ation rack and<br />

make through the l<strong>in</strong>ks of all TPRs, WKRs and signal circuits.<br />

First test the po<strong>in</strong>ts from panel <strong>in</strong>dividually and conduct all tests discussed earlier<br />

<strong>in</strong>clud<strong>in</strong>g track lock<strong>in</strong>g test, correspondence between po<strong>in</strong>t position and<br />

NWKR/RWKR <strong>in</strong> relay roam.<br />

Check whether all TPRs have picked up and check up the panel <strong>in</strong>dication by<br />

<strong>in</strong>dividually by dropp<strong>in</strong>g each track circuit correspond correctly.<br />

Check whether all other required relays viz., CHLR, LXPR, KLCR have picked up.<br />

Test all the signals from panel.<br />

Check the correspondence between relay room and signal aspects which, is most<br />

important:<br />

For check<strong>in</strong>g the aspects of home signals, distant signals, staff (not below the rank<br />

of ESM) shall be deputed to site with walkie-talkie or Magneto telephone and<br />

check the correspondence.<br />

Remove the signal bulb at site of every aspect and check whether <strong>in</strong>dication<br />

disappears on the panel and ECR drops <strong>in</strong> the relay room.<br />

Open all the registers and make entries of counter numbers be<strong>for</strong>e hand<strong>in</strong>g over to<br />

operat<strong>in</strong>g staff.<br />

The follow<strong>in</strong>g Registers shall be handed over to operat<strong>in</strong>g staff, if required.<br />

i. Relay room key register<br />

ii. Route cancellation register<br />

iii. Crank handle register<br />

iv. Axle counter reset register<br />

The follow<strong>in</strong>g registers shall be opened <strong>for</strong> signal ma<strong>in</strong>tenance staff:<br />

i. Track circuit history register<br />

ii. Track circuit ma<strong>in</strong>tenance register<br />

iii. Signal lamp replacement register<br />

iv. Battery ma<strong>in</strong>tenance register<br />

v. Block / Glued jo<strong>in</strong>t ma<strong>in</strong>tenance register<br />

vi. Axle counter ma<strong>in</strong>tenance register.<br />

Signature of contractor Page 123 of 127 Dy CSTE/IRPMU/Kanpur


However contractor will do supply of above registers, if <strong>in</strong>cluded <strong>in</strong> the Schedule of<br />

Works.<br />

Seal<strong>in</strong>g of equipment where required shall be done.<br />

Entries shall be made <strong>in</strong> the signal history register regard<strong>in</strong>g new S&T assets<br />

commissioned.<br />

19 MISCELLANEOUS:<br />

24.1 WOOD WORK:<br />

Wherever woodwork is <strong>in</strong>volved, the wooden planks are to be supplied by the<br />

contractor and he shall ensure the wood of good quality, which shall be varnished<br />

/pa<strong>in</strong>ted as specified. All teak wood boards shall be varnished and hard wood<br />

shelves should be black pa<strong>in</strong>ted.<br />

24.2 Wooden cross of approved type should be provided <strong>for</strong> the newly erected colour<br />

light signals, till they are commissioned.<br />

24.3 Wooden Board and shelves are to be properly polished be<strong>for</strong>e fix<strong>in</strong>g the term<strong>in</strong>als<br />

and equipments on it, as advised by the Eng<strong>in</strong>eer.<br />

24.4 All the equipments, relays and term<strong>in</strong>als are to be marked by letter<strong>in</strong>g on it as<br />

advised by the Eng<strong>in</strong>eer.<br />

*****<br />

Signature of contractor Page 124 of 127 Dy CSTE/IRPMU/Kanpur


ANNEXURE-I<br />

The follow<strong>in</strong>g are the Insulation resistance test results conducted by us on___________<br />

Core capacity cable laid between___________ and ___________ on date<br />

____________at _______________ station.<br />

________________________________________________________________<br />

Core 1 2 3 4 5 6 7 8 . . E<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Signature of the<br />

representative of the<br />

Contractor<br />

Signature of the<br />

representative of<br />

the Eng<strong>in</strong>eer.<br />

Signature of contractor Page 125 of 127 Dy CSTE/IRPMU/Kanpur


ANNEXURE-II<br />

The follow<strong>in</strong>g are the loop resistance test results conducted by us on _________ Core<br />

capacity cable laid between___________ and ___________ on date __________<br />

at _______________ station.<br />

________________________________________________________________________<br />

Core 1 2 3 4 5 6 7 8 . . E<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Signature of the<br />

representative of the<br />

Contractor<br />

Signature of the<br />

representative of<br />

the Eng<strong>in</strong>eer.<br />

Signature of contractor Page 126 of 127 Dy CSTE/IRPMU/Kanpur


ANNEXURE-III<br />

Method to f<strong>in</strong>d<strong>in</strong>g out the resistance of an Earth:<br />

a) Earths should be tested by means of a Wheatstone Bridge or a G.P.O. Detector or a<br />

Megger Earth tester. Two iron bars with term<strong>in</strong>als fixed on them and suitable<br />

length of wire should be used as temporary Earths.<br />

b) To test an Earth, iron bars should be driven about 6 mtr. from the earth to be tested<br />

and 6 mtr. from each other .<br />

c) The bars should be used as temporary Earth and driven <strong>in</strong> the ground <strong>for</strong> 1 mtr.,<br />

0.25 mtr. at a time then work backwards & <strong>for</strong>wards so as to leave a space <strong>for</strong><br />

water<strong>in</strong>g. Salt water should be used to ensure that the bars make a good connection<br />

with the Earth. Should salt be not available a week solution of Sal ammoniac <strong>in</strong><br />

water may be used.<br />

d) The resistance <strong>in</strong> ohms between the respective earths should be tested with<br />

Wheatstone bridge or G.P.O. detector or megger earth tester and Per<strong>for</strong>ma to be<br />

filled.<br />

S. No. Date No. of Location/signal Resistance Remarks<br />

earthed<br />

Measured<br />

Signature of the Representative<br />

of the Contractor<br />

Signature of the Representative<br />

of the Eng<strong>in</strong>eer<br />

------------ END OF <strong>TENDER</strong> -------------<br />

Signature of contractor Page 127 of 127 Dy CSTE/IRPMU/Kanpur

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!