FORM-13 QUALIFICATION EXPERIENCE II. In support of Qualification criteria b) List of Works Completed Description of Work Organization for whom executed Approx. value of contract at the time of award Date of award Date of scheduled completion of work Date of actual Start Completion Final value of contract b) List of Works in Hand Description of work Contract Value Approx. value of balance work yet to be done Date of Award Signature of contractor Page 98 of 104 Dy CSTE/Proj/IRPMU/CNB
FORM-14 RECEIPT CERTIFICATE (FOR SUPPLY ONLY) From: Sr. Section Engineer/Signal/ IRPMU/NC Railway/Juhi/Kanpur No. Date: 1 Contract No 2 Name of Work 3 Item No. As in Rate Schedule 4 Description of Item. 5 Material inspected by 6 Dispatch particular & date 7 Qty as per dispatch particular 8 Qty received 9 Qty short received 10 Condition of Stores Received 11 Name of Firm & Address 12 Place of receipt 13 Date of receipt 14 Ledger No. 15 Name & designation of Stores Incharge -------------------------------------- Signature of Stores-in-Charge Signature of contractor Page 99 of 104 Dy CSTE/Proj/IRPMU/CNB
- Page 47 and 48: Section - II Chapter - 2 Special Co
- Page 49 and 50: 20. ADDITION/REDUCTION OF WORK 21.
- Page 51 and 52: SPECIAL CONDITIONS OF CONTRACT 1. T
- Page 53 and 54: irrevocable bank Guarantee (issued
- Page 55 and 56: 6.6 No facility whatsoever, e.g. pr
- Page 57 and 58: 9 MATERIAL SUPPLIED BY CONTRACTOR 9
- Page 59 and 60: 15.1 The tenderer shall certify tha
- Page 61 and 62: and cost of the contractor. In the
- Page 63 and 64: During inspection of installation b
- Page 65 and 66: All the work shall be executed in s
- Page 67 and 68: approved test procedure have been c
- Page 69 and 70: 29.3 During the period of Warranty,
- Page 71 and 72: the reimbursement in full or in par
- Page 73 and 74: If such a failure as aforesaid shal
- Page 75 and 76: Banker's charges for guarantees, co
- Page 77 and 78: On expiry of the maintenance and wa
- Page 79 and 80: material supplied by the Contractor
- Page 81 and 82: (a) The Arbitration proceedings sha
- Page 83 and 84: 48.3(b)(iii) A party may apply to t
- Page 85 and 86: FORM No. 1 : FORM No. 2 : FORM No.
- Page 87 and 88: Until a formal agreement is prepare
- Page 89 and 90: Signed and delivered at ………
- Page 91 and 92: 4. We .............................
- Page 93 and 94: FORM-6 Para-8.2/Section II Chapter
- Page 95 and 96: ACKNOWLEDGEMENT (FOR RECEIVING MATE
- Page 97: FORM-12 Para-36/Section II Chapter
- Page 101 and 102: Section - III Chapter - 1 Technical
- Page 103 and 104: aspect until the line is clear upto
FORM-13<br />
QUALIFICATION EXPERIENCE<br />
II.<br />
In support of Qualification criteria<br />
b) List of Works Completed<br />
Description<br />
of Work<br />
Organization<br />
for whom<br />
executed<br />
Approx.<br />
value of<br />
contract at<br />
the time of<br />
award<br />
Date of<br />
award<br />
Date of<br />
scheduled<br />
completion<br />
of work<br />
Date of actual<br />
Start Completion<br />
F<strong>in</strong>al value<br />
of contract<br />
b) List of Works <strong>in</strong> Hand<br />
Description of<br />
work<br />
Contract Value<br />
Approx. value of<br />
balance work yet to be<br />
done<br />
Date of Award<br />
Signature of contractor Page 98 of 104 Dy CSTE/Proj/IRPMU/CNB