01.02.2015 Views

Document - irpmu.railnet.gov.in

Document - irpmu.railnet.gov.in

Document - irpmu.railnet.gov.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FORM-6<br />

Para-8.2/Section II Chapter 2<br />

STANDING INDEMNITY BOND<br />

(FOR ON ACCOUNT PAYMENTS & STORES SUPPLIED BY RLYS.)<br />

(On Stamp paper of Requisite Value)<br />

We, M/s............................................................. hereby undertake that we hold at<br />

our stores Depot/s at ................................................ for and on behalf of the President of<br />

India <strong>in</strong> the premises through the General Manager or his successor, North Central<br />

Railway (here<strong>in</strong> after referred to as “the Purchaser”) all materials for which “On<br />

Account” payments have been made to us aga<strong>in</strong>st the contract for “Design, preparation<br />

Supply and Alteration for exist<strong>in</strong>g SSI/RRI/ PI/ Cab<strong>in</strong>s <strong>in</strong> connection with Automatic<br />

Block Signall<strong>in</strong>g for 27 Block section of ALD Division between CNB – ALD section.”<br />

’ vide letter of Acceptance of Tender No....................................... dated ................ and the<br />

materials handed over to us by the purchaser for the purpose of execution of the said<br />

Contract, until such time the materials are duly erected or otherwise handed over to him.<br />

We shall be entirely responsible for the site custody and protection of the said<br />

materials aga<strong>in</strong>st all risk till they are duly delivered as erected equipment to the purchaser<br />

or as he may direct otherwise and shall <strong>in</strong>demnify the Purchaser aga<strong>in</strong>st any loss, damage<br />

or deterioration what so ever <strong>in</strong> respect of the said materials while <strong>in</strong> our possession and<br />

aga<strong>in</strong>st disposal of surplus materials. The said materials shall at all times be open to<br />

<strong>in</strong>spection by any Officer authorized by the Chief Adm<strong>in</strong>istrative Officer/IRPMU, N C<br />

Railway, Shivaji Bridge, New Delhi.<br />

Should any loss, damage or deterioration of materials occur or surplus materials<br />

disposed off and refund becomes due, the purchaser shall be entitled to recover from us<br />

the full cost as per prices <strong>in</strong>cluded <strong>in</strong> the Contract (as applicable) and also<br />

compensation for such loss or damage if any along with<br />

the amount to be refunded without prejudice to any other remedies available to him by<br />

deduction from any sum due or any sum which at any time hereafter becomes due to us<br />

under the said or any other Contract.<br />

Dated this ...................... day of ........................, 2012.<br />

for and on behalf of<br />

Signature of Witness:<br />

Name of Witness <strong>in</strong> block letters:<br />

Address:<br />

Messers ........................................ (Contractor)<br />

Signature of contractor Page 93 of 104 Dy CSTE/Proj/IRPMU/CNB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!