STATEMENT OF DEVIATIONS<br />

PROFORMA FOR STATEMENT OF DEVIATIONS<br />

FORM-5<br />

Para 4/ Section II Chapter 2<br />

1. The follow<strong>in</strong>g are the particulars of deviations from requirement of the<br />

<strong>in</strong>structions to Tenderers, General Conditions of Contract.<br />

1.1 Instructions to Tenderers & Condition of Tender<strong>in</strong>g<br />

CLAUSE DEVIATION REMARKS<br />

1.2 General Conditions of Contract<br />

(INCLUDING JUSTIFICATION)<br />

CLAUSE DEVIATION REMARKS<br />

1.3 Special Conditions of Contract<br />

(INCLUDING JUSTIFICATION<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

2. The follow<strong>in</strong>g are the particulars of deviations from requirement of the technical<br />

specifications:<br />

(Separate Statement for each specification)<br />

CLAUSE DEVIATION REMARKS<br />

(INCLUDING JUSTIFICATION)<br />

Note: Where there is no deviation, the statement should be returned duly signed with<br />

an endorsement <strong>in</strong>dicat<strong>in</strong>g no deviations.<br />

Signature of contractor Page 92 of 104 Dy CSTE/Proj/IRPMU/CNB