j. The Earth enhancement material shall be supplied <strong>in</strong> sealed, moisture proof bags. These<br />

bags shall be marked with Manufacturer’s name or trade name, quantity etc.<br />

k. Shall not require periodic charg<strong>in</strong>g treatment nor replacement and ma<strong>in</strong>tenance.<br />

l. Shall not dissolve, decompose or leached out with time.<br />

m. Shall not pollute the local water table be environment friendly.<br />

n. Shall not be explosive.<br />

o. Shall not cause burns, irritation to eye, sk<strong>in</strong> etc.<br />

6. Construction of Unit Earth :<br />

a. A hole of 100mm to 125mm dia shall augured to a depth of about 2.8 meters.<br />

b. The earth electrode shall be <strong>in</strong>serted <strong>in</strong>to this augured hole.<br />

c. It will be penetrat<strong>in</strong>g <strong>in</strong>to the soil by gentle driv<strong>in</strong>g on the toe of the rod us<strong>in</strong>g a sledge<br />

hammer . Here natural soil is assumed to be available at the bottom of the electrode so<br />

that m<strong>in</strong>.150 mm of the electrode shall be <strong>in</strong>stated <strong>in</strong> the natural soil.<br />

d. RDSO approved earth enhancement material m<strong>in</strong>.<br />

e. approximately 30-35 kg shall be filled <strong>in</strong>to the augured hole <strong>in</strong> slurry form and allowed<br />

to set.<br />

f. After the material gets set,<br />

g. the diameter of the composite structure shall be of m<strong>in</strong>imum 100mm dia cover<strong>in</strong>g<br />

entire length of the hole.<br />

h. Rema<strong>in</strong><strong>in</strong>g portion of the hole shall be covered by the soil which is taken out dur<strong>in</strong>g<br />

augur<strong>in</strong>g.<br />

i. A copper strip of 150mmx25mmx6mm shall be exothermically welded to ma<strong>in</strong> earth<br />

electrode for tak<strong>in</strong>g the connection to the ma<strong>in</strong> equi-potential earth bus bar <strong>in</strong> the<br />

equipment room and to other earth pits ,if any.<br />

j. Exothermic weld material shall be UL listed and tested as per provisions of IEEE 837<br />

by NABL/ILAC member labs.<br />

k. The ma<strong>in</strong> earth pit shall be located as near to the ma<strong>in</strong> equi-potential earth bus bar <strong>in</strong><br />

the equipment room as possible.<br />

7. Construction of loop Earth by provid<strong>in</strong>g multiple earth pits:<br />

S<strong>in</strong>ce it is not possible to achieve a low resistance values of less than one ohm with<br />

one pit, it is required to <strong>in</strong>stall a r<strong>in</strong>g earth consist<strong>in</strong>g of 2 to 4 pits depend<strong>in</strong>g upon the<br />

soil resistivity. Follow<strong>in</strong>g method is shall be adopted to construct the r<strong>in</strong>g earth.<br />

a. The procedure mentioned above for one pit under item 6 , shall be repeated for<br />

<strong>in</strong>stall<strong>in</strong>g 2 to 4 such earth pits. It will be ensured that the distance between the<br />

successive earth pits shall be m<strong>in</strong>.3 mtrs and maximum upto twice the length of the<br />

electrode i.e. 6 mtrs approx..<br />

b. The number of pits required shall be decided based on the resistance achieved for the<br />

earth pits already <strong>in</strong>stalled as the properties of the soil play a major role.<br />

c. These earth pits shall than <strong>in</strong>terl<strong>in</strong>ked us<strong>in</strong>g 25mmx2mm copper tape to form a loop<br />

us<strong>in</strong>g exothermic weld<strong>in</strong>g technique.. The <strong>in</strong>terconnect<strong>in</strong>g cable / bus bar shall be<br />

buried at depth not less than 500mm below the ground level. This <strong>in</strong>terconnect<strong>in</strong>g bus<br />

bar shall also be covered with earth enhanced compound. These connection shall be<br />

Signature of contractor Page 9 of 104 Dy CSTE/Proj/IRPMU/CNB