29.3 Dur<strong>in</strong>g the period of Warranty, the Contractor shall rema<strong>in</strong> responsible for<br />

replacement/re-design/repair and for sett<strong>in</strong>g right at his own cost any equipment<br />

/design/documentation supplied by him, which is of defective manufacture or<br />

defective design or defective material/component and becomes unworkable due to<br />

any cause whatsoever. The decision of railways to attend to any damage or defect<br />

<strong>in</strong> work shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the Contractor.<br />

29.4 If it becomes necessary for the contractor to replace or renew any defective portions<br />

of the system under this clause, the contractor shall make the system functional by<br />

provid<strong>in</strong>g suitable replacement/redesign/repair of Design/documentation/equipment<br />

and restore back the orig<strong>in</strong>al card / equipment after repairs to the same. The card /<br />

equipment so repaired should bear warranty equal to the end of orig<strong>in</strong>al warranty<br />

period or m<strong>in</strong>imum SIX months from the date of repair, whichever is later. If any<br />

defect is not remedied with<strong>in</strong> reasonable time, the Railway may proceed to do the<br />

work at contractor’s risk and expense, but without prejudice to any other rights,<br />

which the Railway may have aga<strong>in</strong>st the contractor <strong>in</strong> respect of such defects.<br />

29.5 All <strong>in</strong>spections, replacements or renewals carried out by the Contractor dur<strong>in</strong>g the<br />

warranty period shall be subjected to the same conditions of the contract.<br />

29.6 All replacement and repairs and design change that the Railway shall call upon the<br />

contractor to deliver or perform under this warranty shall be delivered and<br />

performed by the contractor with<strong>in</strong> one month, promptly and satisfactorily.<br />

29.7 The decision of the Railway <strong>in</strong> regard to contractor’s liability and the amount, if<br />

any, payable under this warranty shall be f<strong>in</strong>al and conclusive.<br />

29.8 Due to analysis of failures, if any design deficiency is po<strong>in</strong>ted out by the Railway,<br />

the contractor shall rectify it at his own cost.<br />

30. TRAINING<br />

Not applicable<br />

31. INFRINGEMENT OF PATENTS<br />

(a)<br />

The Contractor is forbidden to use any patents or registered draw<strong>in</strong>gs, processes<br />

or patterns <strong>in</strong> fulfill<strong>in</strong>g his contract without the previous consent <strong>in</strong> writ<strong>in</strong>g of the<br />

owner of such patents, draw<strong>in</strong>gs, patterns or trade marks, except where these<br />

are specified by the purchaser himself. Royalties where payable for the use of<br />

such patented processes, registered draw<strong>in</strong>gs or patterns shall be borne<br />

exclusively by the Contractor. The Contractor shall advise the purchaser of any<br />

Signature of contractor Page 69 of 104 Dy CSTE/Proj/IRPMU/CNB