Ma<strong>in</strong>tenance Supervision of various sections for which Provisional Acceptance<br />
Certificates are issued or brought <strong>in</strong>to full fledged operation, provided that the<br />
contractor has complied fully with his obligations under clause 27 <strong>in</strong> respect<br />
of each section under the contract.<br />
28.2 If on the other hand the contractor has not so complied with his obligation under<br />
para 27 <strong>in</strong> respect of any section, the purchaser may either extend the period of<br />
ma<strong>in</strong>tenance supervision <strong>in</strong> respect of that section until the necessary works are<br />
carried out by the contractor or carry out those works suo moto on behalf of the<br />
contractor at the contractor's expenses. After expiry of the period of<br />
ma<strong>in</strong>tenance supervision for each section, a certificate of F<strong>in</strong>al Acceptance for<br />
the section shall be issued by the purchaser and the last of such certificate will be<br />
called the Last and F<strong>in</strong>al Acceptance Certificate. The contract shall not be<br />
considered as completed until the issue of F<strong>in</strong>al Acceptance Certificate by<br />
the purchaser.<br />
28.3 The purchaser shall not be liable to the contractor for any dispute aris<strong>in</strong>g out of<br />
or <strong>in</strong> connection with the contract or execution of the work unless the contractor<br />
have made a claim <strong>in</strong> writ<strong>in</strong>g <strong>in</strong> respect thereof before the issue of F<strong>in</strong>al<br />
Acceptance Certificate under this clause. The contractor shall be debarred from<br />
disput<strong>in</strong>g the correctness of the items caused by the no claim certificate or<br />
demand<strong>in</strong>g a reference to Arbitration <strong>in</strong> respect thereof.<br />
28.4 Notwithstand<strong>in</strong>g the issue of F<strong>in</strong>al Acceptance Certificate, the contractor and the<br />
purchaser (subject to Sub Clause as above) shall rema<strong>in</strong> liable for fulfillment of<br />
any obligation <strong>in</strong>curred under the provision of the contract prior to the issue of<br />
F<strong>in</strong>al Acceptance Certificate which rema<strong>in</strong>s unperformed at the time such<br />
certificate is issued and for determ<strong>in</strong><strong>in</strong>g the nature and extent of such<br />
obligation, the contract shall be deemed to rema<strong>in</strong> <strong>in</strong> force between the parties<br />
hereto.<br />
29. WARRANTY<br />
29.1 The contractor shall warranty that all application data design and documentation,<br />
materials & equipment supplied and <strong>in</strong>stalled <strong>in</strong> this work of Electronic<br />
Interlock<strong>in</strong>g alteration shall be free from defects and faults <strong>in</strong> design, material,<br />
workmanship and manufacture and shall be of the highest grade and consistent with<br />
the established and generally accepted standard for materials of the type ordered<br />
and <strong>in</strong> full conformity with the contract specifications.<br />
29.2 This warranty shall start from the date of acceptance of commission<strong>in</strong>g by railways<br />
and placement <strong>in</strong> service. The date of the commission<strong>in</strong>g of the work will be after<br />
the sign<strong>in</strong>g of the provisional acceptance certificate by both the parties as per<br />
details at clause 27<br />
Signature of contractor Page 68 of 104 Dy CSTE/Proj/IRPMU/CNB