Ma<strong>in</strong>tenance Supervision of various sections for which Provisional Acceptance<br />

Certificates are issued or brought <strong>in</strong>to full fledged operation, provided that the<br />

contractor has complied fully with his obligations under clause 27 <strong>in</strong> respect<br />

of each section under the contract.<br />

28.2 If on the other hand the contractor has not so complied with his obligation under<br />

para 27 <strong>in</strong> respect of any section, the purchaser may either extend the period of<br />

ma<strong>in</strong>tenance supervision <strong>in</strong> respect of that section until the necessary works are<br />

carried out by the contractor or carry out those works suo moto on behalf of the<br />

contractor at the contractor's expenses. After expiry of the period of<br />

ma<strong>in</strong>tenance supervision for each section, a certificate of F<strong>in</strong>al Acceptance for<br />

the section shall be issued by the purchaser and the last of such certificate will be<br />

called the Last and F<strong>in</strong>al Acceptance Certificate. The contract shall not be<br />

considered as completed until the issue of F<strong>in</strong>al Acceptance Certificate by<br />

the purchaser.<br />

28.3 The purchaser shall not be liable to the contractor for any dispute aris<strong>in</strong>g out of<br />

or <strong>in</strong> connection with the contract or execution of the work unless the contractor<br />

have made a claim <strong>in</strong> writ<strong>in</strong>g <strong>in</strong> respect thereof before the issue of F<strong>in</strong>al<br />

Acceptance Certificate under this clause. The contractor shall be debarred from<br />

disput<strong>in</strong>g the correctness of the items caused by the no claim certificate or<br />

demand<strong>in</strong>g a reference to Arbitration <strong>in</strong> respect thereof.<br />

28.4 Notwithstand<strong>in</strong>g the issue of F<strong>in</strong>al Acceptance Certificate, the contractor and the<br />

purchaser (subject to Sub Clause as above) shall rema<strong>in</strong> liable for fulfillment of<br />

any obligation <strong>in</strong>curred under the provision of the contract prior to the issue of<br />

F<strong>in</strong>al Acceptance Certificate which rema<strong>in</strong>s unperformed at the time such<br />

certificate is issued and for determ<strong>in</strong><strong>in</strong>g the nature and extent of such<br />

obligation, the contract shall be deemed to rema<strong>in</strong> <strong>in</strong> force between the parties<br />

hereto.<br />

29. WARRANTY<br />

29.1 The contractor shall warranty that all application data design and documentation,<br />

materials & equipment supplied and <strong>in</strong>stalled <strong>in</strong> this work of Electronic<br />

Interlock<strong>in</strong>g alteration shall be free from defects and faults <strong>in</strong> design, material,<br />

workmanship and manufacture and shall be of the highest grade and consistent with<br />

the established and generally accepted standard for materials of the type ordered<br />

and <strong>in</strong> full conformity with the contract specifications.<br />

29.2 This warranty shall start from the date of acceptance of commission<strong>in</strong>g by railways<br />

and placement <strong>in</strong> service. The date of the commission<strong>in</strong>g of the work will be after<br />

the sign<strong>in</strong>g of the provisional acceptance certificate by both the parties as per<br />

details at clause 27<br />

Signature of contractor Page 68 of 104 Dy CSTE/Proj/IRPMU/CNB