20. ADDITION/REDUCTION OF QUANTITIES OF WORK<br />

If dur<strong>in</strong>g the execution of the work the contractor is called upon to carry out any<br />

new work not <strong>in</strong>cluded <strong>in</strong> orig<strong>in</strong>al scope of work, it should not be executed before<br />

a rate has been agreed to by the Railways <strong>in</strong> the manner as <strong>in</strong>dicated <strong>in</strong> General<br />

Conditions of Contract and Instructions for tenders of the Engg. Department of<br />

Railways.<br />

The successful tenders will, however, have no claims or right <strong>in</strong> the execution of<br />

any work which <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer should be carried out<br />

departmentally or otherwise and the Railway reserves the right any time before or<br />

after the acceptance of the tender to keep back from the contract and carry out the<br />

work or portion of work through any other agent it may th<strong>in</strong>k fit without assign<strong>in</strong>g<br />

any reason. No claim for compensation / loss or what so ever on this account will<br />

be enterta<strong>in</strong>ed by the Railway.<br />

21. SUBLETTING AND ASSIGNMENT<br />

21.1 The contractor may sublet a part of the works under this contract and enter <strong>in</strong>to<br />

contract with suppliers for supply of materials only with the approval of the<br />

Railway adm<strong>in</strong>istration.<br />

21.2 The names of all sub contractors proposed to be employed for execution of work<br />

or any part thereof <strong>in</strong>clud<strong>in</strong>g manufactur<strong>in</strong>g of equipment and other materials<br />

shall be submitted by the contractor to the purchaser and got approved by him<br />

before the contractor enter <strong>in</strong>to a agreement with the sub contractor for the<br />

purpose.<br />

21.3 The contractor shall arrange for effective supervision of sub contractor's work and<br />

rema<strong>in</strong> solely responsible for materials supplied and for works carried out on his<br />

behalf by the sub contractor.<br />

21.4 The contractor shall not, save with the previous consent <strong>in</strong> writ<strong>in</strong>g of the<br />

Purchaser, sublet, transfer or assign the contract or any part thereof or <strong>in</strong>terest<br />

there<strong>in</strong> or benefit or advantage thereof any manner whatsoever.<br />

21.5 In the event of the Contractor's sublett<strong>in</strong>g or assign<strong>in</strong>g this contract or any part<br />

thereof without such permission, the purchaser shall be entitled to cancel the<br />

contract and to purchase the stores elsewhere on the contractor's account and risk<br />

and the contractor shall be liable for any loss or damage which the purchaser<br />

may susta<strong>in</strong> <strong>in</strong> consequence or aris<strong>in</strong>g out of such purpose.<br />

22. EXECUTION OF WORK<br />

Signature of contractor Page 64 of 104 Dy CSTE/Proj/IRPMU/CNB