8 MATERIAL SUPPLIED BY RAILWAYS<br />

8.1 No material is to be supplied by Railways from Railway depot as has already been<br />

<strong>in</strong>dicated <strong>in</strong> the Preamble except, approved copies of SIP and Selection Table.<br />

The present work, however <strong>in</strong>volves work<strong>in</strong>g on exist<strong>in</strong>g <strong>in</strong>stallation which is<br />

Railway property.<br />

8.2 The contractor will be responsible for safe custody of material directly brought to<br />

the site for exist<strong>in</strong>g work, and for which the consignee has given his acceptance<br />

for use. The material will be treated as Railway material at site and for which the<br />

contractor shall furnish a stand<strong>in</strong>g <strong>in</strong>demnity bond <strong>in</strong> form No.6. (Section II<br />

Chapter III).<br />

8.5 RECONCILIATION OF MATERIALS SUPPLIED BY RAILWAYS<br />

All the materials supplied by the Purchaser shall be correctly accounted for<br />

and the quantities reconciled on completion of the work by the contractor. On<br />

completion of the work all surplus materials supplied by the Purchaser together<br />

with the ones found defective or that have became defective or broken on<br />

account of defective materials and/or workmanship shall be returned to him by the<br />

contractor.<br />

If the contractor fails to return excess and unused materials supplied by the<br />

railway or if there are any shortages dur<strong>in</strong>g f<strong>in</strong>al reconciliation, their cost there of<br />

shall be recovered by the Purchaser from the Contractor at the books rate plus<br />

railway freight, handl<strong>in</strong>g, load<strong>in</strong>g, supervision and other <strong>in</strong>cidental charges at the<br />

rates fixed by the railway to this will be added an <strong>in</strong>crease of 100%.<br />

Signature of contractor Page 56 of 104 Dy CSTE/Proj/IRPMU/CNB