6.6 No facility whatsoever, e.g. provisions of approach road and provision of<br />

temporary level cross<strong>in</strong>g etc. will be provided by Railway for cart<strong>in</strong>g materials.<br />

Approach roads with<strong>in</strong> the Railway limits can be used for cart<strong>in</strong>g materials.<br />

6.7 The contractor will programme his work <strong>in</strong> such a manner so as not to <strong>in</strong>terfere <strong>in</strong><br />

the work<strong>in</strong>g and movement of tra<strong>in</strong>s. No extra payment shall be allowed on this<br />

account and for tak<strong>in</strong>g any precautions or wastage of contractor's labour, time etc.<br />

due to tra<strong>in</strong> work<strong>in</strong>g.<br />

7. COMPETENT SUPERVISORS<br />

7.1 The Contractor shall place and keep competent Representatives /Supervisors/<br />

Eng<strong>in</strong>eers, as his representative on the works who will be authorised to receive<br />

and acknowledge materials issued by the Railway and take all orders issued by the<br />

Railway.<br />

7.2 The contractor shall employ the follow<strong>in</strong>g technical staff as a m<strong>in</strong>imum, dur<strong>in</strong>g<br />

the execution of the work:<br />

a) One graduate Eng<strong>in</strong>eer when the cost of the work to be executed is<br />

Rs.15 Lacs and above.<br />

b) One Identified diploma holder when the cost of work to be executed is<br />

more than 5 Lacs but less than Rs. 15 Lacs.<br />

7.2.1 The technical staff should be available at site whenever required by the Eng<strong>in</strong>eer<strong>in</strong>-charge<br />

to take <strong>in</strong>structions. In case the Contractor/s fails/fail to employ the<br />

technical staff as aforesaid, he/they shall be liable to pay a reasonable amount not<br />

exceed<strong>in</strong>g a sum of Rs.2,000/-(Rupees Two thousand only) for each month of<br />

default <strong>in</strong> case of graduate eng<strong>in</strong>eer and Rs.1,000/- (Rs. One thousand only) for<br />

each month of default <strong>in</strong> case of Diploma Holder.<br />

7.2.2 The decision of the Eng<strong>in</strong>eer-<strong>in</strong>-charge as to the period for which the required<br />

technical staff was not employed by the contractors and as to the reasonableness<br />

of the amount to be deducted on this account shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the<br />

Contractor.<br />

7.3 The said representatives shall be present at site dur<strong>in</strong>g work<strong>in</strong>g hours and any<br />

written orders or <strong>in</strong>structions which the purchaser's Eng<strong>in</strong>eer may give to the said<br />

representatives of the contractor shall be deemed to have been duly given or<br />

communicated to the contractor.<br />

7.4 The contractor or his representative will accompany the Purchaser's Eng<strong>in</strong>eer or<br />

Eng<strong>in</strong>eer on <strong>in</strong>spection or proceed to their offices whenever called upon to do so.<br />

Signature of contractor Page 55 of 104 Dy CSTE/Proj/IRPMU/CNB