implementation of the ma<strong>in</strong>tenance Software Upgrades / Patches <strong>in</strong> each system.<br />

18.5 ENGINEERING ORGANISATION<br />

18.5.1 The tenderer shall make an assessment of the requirement of personnel for<br />

execution of this project and shall give details as to how he proposes to mobilise<br />

all technical manpower required for the project. Details of the qualification and<br />

experience of the personnel identified for project execution shall be <strong>in</strong>cluded <strong>in</strong><br />

the tender.<br />

18.5.2 The successful tenderer shall appo<strong>in</strong>t a Project Manager who has adequate<br />

experience <strong>in</strong> project management of similar nature. Unless the railways so desire,<br />

the Project Manager should preferably be reta<strong>in</strong>ed till all the obligations under the<br />

contract have been fulfilled.<br />

18.5.3 Tenderer shall advise the number of Eng<strong>in</strong>eers, Supervisors and Cable<br />

Jo<strong>in</strong>ters/Artisans employed by him or go<strong>in</strong>g to be employed by him with their<br />

names, qualifications bio-data and experience <strong>in</strong> this particular trade under<br />

consideration along with the Tender positively. Irrevocable letters of commitment<br />

of the said Supervisors and Key Technicians/Artisans for do<strong>in</strong>g the work shall be<br />

furnished along with Tender Papers if they are not already <strong>in</strong> employment of the<br />

Tenderer.<br />

18.6 CONSTRUCTION MACHINERY<br />

The firm should have m<strong>in</strong>imum construction mach<strong>in</strong>ery, Tools and plants, test &<br />

measur<strong>in</strong>g <strong>in</strong>struments, Vehicles etc. for carry<strong>in</strong>g out the work.<br />

19 DETERMINATION OF RESPONSIVENESS<br />

Not applicable.<br />

20. CORRECTION OF ERRORS<br />

20.1 Bids determ<strong>in</strong>ed to be substantively responsive will be checked by the Purchaser<br />

for any arithmetic errors <strong>in</strong> computation and summation. The Purchaser will correct<br />

errors as follows: -<br />

a) Where there is a discrepancy between amounts <strong>in</strong> figures and <strong>in</strong> words, the<br />

amount <strong>in</strong> words will <strong>gov</strong>ern; and<br />

b) Where there is a discrepancy between the unit rate and the total amount<br />

Signature of contractor Page 44 of 104 Dy CSTE/Proj/IRPMU/CNB