18.2.3 COMPLETION PERIOD OF WORK<br />
The entire work is to be completed with<strong>in</strong> 18 months from the date of issue of<br />
Letter of Acceptance.<br />
18.3 FINANCIAL<br />
18.3.1 The tenderer should produce:<br />
i) Latest Income Tax clearance certificate.<br />
ii)<br />
Audited Balance Sheet and Income statement of just concluded year.<br />
18.3.2 The tenderer shall furnish such documents as to establish the f<strong>in</strong>ancial soundness<br />
of his company as well as that of other companies if more than one company is<br />
<strong>in</strong>volved <strong>in</strong> bidd<strong>in</strong>g for this tender. The latest balance sheet, audited or certified<br />
by a neutral agency shall be furnished.<br />
18.3.3 The bidder shall submit required <strong>in</strong>formation <strong>in</strong> a separate Annexure and also a<br />
certificate from the user for whom the project was executed about the correctness<br />
of the dates <strong>in</strong>volved and satisfactory performance of the equipment/system.<br />
18.4 TECHNOLOGY & EQUIPMENT<br />
18.4.1 The tenderer shall clearly identify the sources from which the equipment to be<br />
supplied under this tender will be obta<strong>in</strong>ed.<br />
18.4.2 All equipment proposed to be used shall be of proven design and performance.<br />
The equipment of same family shall have been successfully commissioned and<br />
rema<strong>in</strong>ed <strong>in</strong> service at least for a period of one year on the date of tender<br />
submission. However, the tenderer shall supply latest version of the equipment<br />
under the standard.<br />
18.4.3 SOFTWARE<br />
Software version of the equipment be<strong>in</strong>g supplied should be latest and must be<br />
<strong>in</strong>dicated.<br />
18.4.4 All the software upgrades and / or patches required for the ma<strong>in</strong>tenance of the<br />
system supplied will be implemented free of cost at each site for seven years by<br />
respective bidders. Acceptance Test<strong>in</strong>g of the system will be got done by him<br />
through authority designated by Railways for all functions of all systems after the<br />
Signature of contractor Page 43 of 104 Dy CSTE/Proj/IRPMU/CNB