18.2.3 COMPLETION PERIOD OF WORK<br />

The entire work is to be completed with<strong>in</strong> 18 months from the date of issue of<br />

Letter of Acceptance.<br />

18.3 FINANCIAL<br />

18.3.1 The tenderer should produce:<br />

i) Latest Income Tax clearance certificate.<br />

ii)<br />

Audited Balance Sheet and Income statement of just concluded year.<br />

18.3.2 The tenderer shall furnish such documents as to establish the f<strong>in</strong>ancial soundness<br />

of his company as well as that of other companies if more than one company is<br />

<strong>in</strong>volved <strong>in</strong> bidd<strong>in</strong>g for this tender. The latest balance sheet, audited or certified<br />

by a neutral agency shall be furnished.<br />

18.3.3 The bidder shall submit required <strong>in</strong>formation <strong>in</strong> a separate Annexure and also a<br />

certificate from the user for whom the project was executed about the correctness<br />

of the dates <strong>in</strong>volved and satisfactory performance of the equipment/system.<br />

18.4 TECHNOLOGY & EQUIPMENT<br />

18.4.1 The tenderer shall clearly identify the sources from which the equipment to be<br />

supplied under this tender will be obta<strong>in</strong>ed.<br />

18.4.2 All equipment proposed to be used shall be of proven design and performance.<br />

The equipment of same family shall have been successfully commissioned and<br />

rema<strong>in</strong>ed <strong>in</strong> service at least for a period of one year on the date of tender<br />

submission. However, the tenderer shall supply latest version of the equipment<br />

under the standard.<br />

18.4.3 SOFTWARE<br />

Software version of the equipment be<strong>in</strong>g supplied should be latest and must be<br />

<strong>in</strong>dicated.<br />

18.4.4 All the software upgrades and / or patches required for the ma<strong>in</strong>tenance of the<br />

system supplied will be implemented free of cost at each site for seven years by<br />

respective bidders. Acceptance Test<strong>in</strong>g of the system will be got done by him<br />

through authority designated by Railways for all functions of all systems after the<br />

Signature of contractor Page 43 of 104 Dy CSTE/Proj/IRPMU/CNB