INDEX 1. GENERAL INSTRUCTIONS 2. INTERPRETATIONS 3. LOCAL CONDITIONS 4. COMPLIANCE TO TENDER CONDITIONS, TECHNICAL SPECIFICATION & DRAWINGS 5. EARNEST MONEY/BID GUARANTEE 6. SUBMISSION OF OFFERS 7. CONSTITUTION OF FIRM & POWER OF ATTORNEY 8. UNIT PRICES 9. VALIDITY OF OFFER 10. RATES DURING NEGOTIATION 11. INCOME TAX CLEARANCE CERTIFICATE 12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH 13. OPENING OF TENDER 14. NON-TRANSFERABILITY & NON-REFUNDABILITY 15. ERRORS OMISSIONS & DISCREPANCIES 16. WRONG INFORMATION BY TENDERER 17. CONSORTIUM BIDS 18. QUALIFICATION CRITERIA 19 DETERMINATION OF RESPONSIVENESS 20. CORRECTION OF ERRORS 21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES 22. SYSTEM PERFORMANCE GUARANTEE Signature of contractor Page 30 of 104 Dy CSTE/Proj/IRPMU/CNB
23. AUTHORITY FOR ACCEPTANCE 24. PURCHASE PREFERENCE 25. AGREEMENT 26. TENDERER'S ADDRESS 27. FOREIGN EXCHANGE Signature of contractor Page 31 of 104 Dy CSTE/Proj/IRPMU/CNB
- Page 1 and 2: IRPMU INDIAN RAILWAYS PROJECT MANAG
- Page 3 and 4: INDEX SECTION CHAPTER SUBJECT I 1 T
- Page 5 and 6: INDIAN RAILWAY PROJECT MANAGEMENT U
- Page 7 and 8: PREAMBLE 1 Tender Notice No. IRPMU/
- Page 9 and 10: j. The Earth enhancement material s
- Page 11 and 12: B) Typical bonding and Earthing con
- Page 13 and 14: 2.3.2 Sch. B Design Modification of
- Page 15 and 16: assembly, guide element, female con
- Page 17 and 18: Wiring in relays housing shall be u
- Page 19 and 20: 4.3 a) The tenderer(s) should submi
- Page 21 and 22: these originally quoted for, based
- Page 23 and 24: Section - I Chapter - 3 Schedule of
- Page 25 and 26: Schedule -B Schedule for Alteration
- Page 27 and 28: SCHEDULE -C Schedule for Supply of
- Page 29: Section - II Chapter - 1 Instructio
- Page 33 and 34: "CONTRACTOR” Means the successful
- Page 35 and 36: change of price, or time schedule o
- Page 37 and 38: within reasonable time after the fi
- Page 39 and 40: 7.1 Any individual(s) signing the t
- Page 41 and 42: entertained. 16. WRONG INFORMATION
- Page 43 and 44: 18.2.3 COMPLETION PERIOD OF WORK Th
- Page 45 and 46: derived from the multiplication of
- Page 47 and 48: Section - II Chapter - 2 Special Co
- Page 49 and 50: 20. ADDITION/REDUCTION OF WORK 21.
- Page 51 and 52: SPECIAL CONDITIONS OF CONTRACT 1. T
- Page 53 and 54: irrevocable bank Guarantee (issued
- Page 55 and 56: 6.6 No facility whatsoever, e.g. pr
- Page 57 and 58: 9 MATERIAL SUPPLIED BY CONTRACTOR 9
- Page 59 and 60: 15.1 The tenderer shall certify tha
- Page 61 and 62: and cost of the contractor. In the
- Page 63 and 64: During inspection of installation b
- Page 65 and 66: All the work shall be executed in s
- Page 67 and 68: approved test procedure have been c
- Page 69 and 70: 29.3 During the period of Warranty,
- Page 71 and 72: the reimbursement in full or in par
- Page 73 and 74: If such a failure as aforesaid shal
- Page 75 and 76: Banker's charges for guarantees, co
- Page 77 and 78: On expiry of the maintenance and wa
- Page 79 and 80: material supplied by the Contractor
INDEX<br />
1. GENERAL INSTRUCTIONS<br />
2. INTERPRETATIONS<br />
3. LOCAL CONDITIONS<br />
4. COMPLIANCE TO TENDER CONDITIONS, TECHNICAL<br />
SPECIFICATION & DRAWINGS<br />
5. EARNEST MONEY/BID GUARANTEE<br />
6. SUBMISSION OF OFFERS<br />
7. CONSTITUTION OF FIRM & POWER OF ATTORNEY<br />
8. UNIT PRICES<br />
9. VALIDITY OF OFFER<br />
10. RATES DURING NEGOTIATION<br />
11. INCOME TAX CLEARANCE CERTIFICATE<br />
12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH<br />
13. OPENING OF TENDER<br />
14. NON-TRANSFERABILITY & NON-REFUNDABILITY<br />
15. ERRORS OMISSIONS & DISCREPANCIES<br />
16. WRONG INFORMATION BY TENDERER<br />
17. CONSORTIUM BIDS<br />
18. QUALIFICATION CRITERIA<br />
19 DETERMINATION OF RESPONSIVENESS<br />
20. CORRECTION OF ERRORS<br />
21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES<br />
22. SYSTEM PERFORMANCE GUARANTEE<br />
Signature of contractor Page 30 of 104 Dy CSTE/Proj/IRPMU/CNB