- Page 1: IRPMU INDIAN RAILWAYS PROJECT MANAG
- Page 5 and 6: INDIAN RAILWAY PROJECT MANAGEMENT U
- Page 7 and 8: PREAMBLE 1 Tender Notice No. IRPMU/
- Page 9 and 10: j. The Earth enhancement material s
- Page 11 and 12: B) Typical bonding and Earthing con
- Page 13 and 14: 2.3.2 Sch. B Design Modification of
- Page 15 and 16: assembly, guide element, female con
- Page 17 and 18: Wiring in relays housing shall be u
- Page 19 and 20: 4.3 a) The tenderer(s) should submi
- Page 21 and 22: these originally quoted for, based
- Page 23 and 24: Section - I Chapter - 3 Schedule of
- Page 25 and 26: Schedule -B Schedule for Alteration
- Page 27 and 28: SCHEDULE -C Schedule for Supply of
- Page 29 and 30: Section - II Chapter - 1 Instructio
- Page 31 and 32: 23. AUTHORITY FOR ACCEPTANCE 24. PU
- Page 33 and 34: "CONTRACTOR” Means the successful
- Page 35 and 36: change of price, or time schedule o
- Page 37 and 38: within reasonable time after the fi
- Page 39 and 40: 7.1 Any individual(s) signing the t
- Page 41 and 42: entertained. 16. WRONG INFORMATION
- Page 43 and 44: 18.2.3 COMPLETION PERIOD OF WORK Th
- Page 45 and 46: derived from the multiplication of
- Page 47 and 48: Section - II Chapter - 2 Special Co
- Page 49 and 50: 20. ADDITION/REDUCTION OF WORK 21.
- Page 51 and 52: SPECIAL CONDITIONS OF CONTRACT 1. T
- Page 53 and 54:
irrevocable bank Guarantee (issued
- Page 55 and 56:
6.6 No facility whatsoever, e.g. pr
- Page 57 and 58:
9 MATERIAL SUPPLIED BY CONTRACTOR 9
- Page 59 and 60:
15.1 The tenderer shall certify tha
- Page 61 and 62:
and cost of the contractor. In the
- Page 63 and 64:
During inspection of installation b
- Page 65 and 66:
All the work shall be executed in s
- Page 67 and 68:
approved test procedure have been c
- Page 69 and 70:
29.3 During the period of Warranty,
- Page 71 and 72:
the reimbursement in full or in par
- Page 73 and 74:
If such a failure as aforesaid shal
- Page 75 and 76:
Banker's charges for guarantees, co
- Page 77 and 78:
On expiry of the maintenance and wa
- Page 79 and 80:
material supplied by the Contractor
- Page 81 and 82:
(a) The Arbitration proceedings sha
- Page 83 and 84:
48.3(b)(iii) A party may apply to t
- Page 85 and 86:
FORM No. 1 : FORM No. 2 : FORM No.
- Page 87 and 88:
Until a formal agreement is prepare
- Page 89 and 90:
Signed and delivered at ………
- Page 91 and 92:
4. We .............................
- Page 93 and 94:
FORM-6 Para-8.2/Section II Chapter
- Page 95 and 96:
ACKNOWLEDGEMENT (FOR RECEIVING MATE
- Page 97 and 98:
FORM-12 Para-36/Section II Chapter
- Page 99 and 100:
FORM-14 RECEIPT CERTIFICATE (FOR SU
- Page 101 and 102:
Section - III Chapter - 1 Technical
- Page 103 and 104:
aspect until the line is clear upto