Schedule -B<br />
Schedule for Alteration work <strong>in</strong> Station SSI/RRI/PI/Cab<strong>in</strong>s suit<strong>in</strong>g to Automatic block work<strong>in</strong>g.<br />
S.No Description unit qty rate Amount Inspection<br />
1 Design and Supply of Exist<strong>in</strong>g Station SSI Software to suit<br />
alteration for Automatic block work<strong>in</strong>g. This <strong>in</strong>cludes<br />
software for Indication panel(VDU), Executive software<br />
Application logic and all Interconnect<strong>in</strong>g Cables etc.At first<br />
stage alteration <strong>in</strong> design to be done for 1 side auto section<br />
and made FAT and supplied. In second stage alteration <strong>in</strong><br />
design for other side auto section also to be <strong>in</strong>corporated<br />
and made FAT and supplied.<br />
2 Design and preparation of exist<strong>in</strong>g circuit diagram with<br />
PI/SSI/Cab<strong>in</strong> and <strong>in</strong>stallations to suit alteration for<br />
automatic block work<strong>in</strong>g.( for small station).At first stage<br />
alteration <strong>in</strong> design & draw<strong>in</strong>gs to be done for one side<br />
auto section and supplied. In second stage alteration <strong>in</strong><br />
design & draw<strong>in</strong>gs for other side auto section also to be<br />
<strong>in</strong>corporated and supplied.<br />
3 Alteration work <strong>in</strong> operat<strong>in</strong>g cum <strong>in</strong>dication Dom<strong>in</strong>o panel<br />
to <strong>in</strong>clude automatic block territory .This <strong>in</strong>cludes supply of<br />
additional dom<strong>in</strong>os and cover plates along with<br />
LEDs,Cables and wir<strong>in</strong>g etc. At first stage alteration <strong>in</strong><br />
design to be done for 1 side auto section and supplied. In<br />
second stage alteration <strong>in</strong> design for other side auto<br />
section also to be <strong>in</strong>corporated and supplied.<br />
4 Complete wir<strong>in</strong>g of ECRs, UECR's, GKTs, Relays, Relay<br />
Groups and other equipment as per approved wir<strong>in</strong>g<br />
diagram and <strong>in</strong>structions of Eng<strong>in</strong>eer <strong>in</strong> charge <strong>in</strong>clud<strong>in</strong>g<br />
dress<strong>in</strong>g , bunch<strong>in</strong>g and thread<strong>in</strong>g of signall<strong>in</strong>g equipments<br />
e.g. Relays, ECR's etc.<br />
5 Test<strong>in</strong>g of alteration done for Automatic block work<strong>in</strong>g <strong>in</strong><br />
PI/RRI/SSI/Cab<strong>in</strong> <strong>in</strong>stallation with MACL system as a<br />
whole shall be carried out by the Eng<strong>in</strong>eer <strong>in</strong> Charge of the<br />
work with the help of representative of Contractor. At first<br />
stage test<strong>in</strong>g of alteration <strong>in</strong> design to be done for one side<br />
auto section. In second stage test<strong>in</strong>g of alteration <strong>in</strong> design<br />
for other side auto section .All artisan staff and labours<br />
required for test<strong>in</strong>g to be provided by contractor.<br />
6 Commission<strong>in</strong>g of alteration done for Automatic block<br />
work<strong>in</strong>g <strong>in</strong> PI/RRI/SSI/Cab<strong>in</strong> <strong>in</strong>stallation with MACL system<br />
as a whole shall be carried out by the Eng<strong>in</strong>eer <strong>in</strong> Charge<br />
of the work with the help of representative of Contractor. At<br />
first stage commission<strong>in</strong>g of alteration <strong>in</strong> design to be done<br />
for one side auto section. In second stage commission<strong>in</strong>g<br />
of alteration <strong>in</strong> design for other side auto section All artisan<br />
staff and labours and any test<strong>in</strong>g provision etc required for<br />
commission<strong>in</strong>g to be provided by contractor.<br />
job 24 363000 8712000 Consignee<br />
job 26 165000 4290000 Consignee<br />
job 26 26400 686400 Consignee<br />
Per<br />
relay/<br />
Equipm<br />
ent/rela<br />
y<br />
group/ta<br />
g block<br />
1600 501.60 802560 Consignee<br />
job 28 72600.00 2032800 Consignee<br />
job 28 99000.00 2772000 Consignee<br />
Signature of contractor Page 25 of 104 Dy CSTE/Proj/IRPMU/CNB