the drawings/documents. The entire work including supply should be completed within 10 months of the issue of the letter of Acceptance. 6 INSPECTION AND TEST 6.1 Inspection of the material used for drawings/documents will be consignee. The Indian Railway Project Management Unit shall nominate the Inspecting Officers. 7 PACKING AND FORWARDING 7.1 The contractor shall pack at his own cost the stores sufficiently and properly for transit by rail/road, air and/or sea as provided in the contract so as to ensure their being free from loss or damage on arrival at their destination. 7.2 All containers (including packing cases, boxes, tins, drums and wrappings) in which the contractor supplies the stores shall be considered as non-returnable and their cost as deemed to have been included in the contract price. 7.3 The Contractor at his own expense shall mark each bale or package delivered under the contract. Such marking shall be distinct (all previous irrelevant marking being carefully obliterated) and shall clearly indicate the description and quantity of the stores, the name and address of the consignee, the gross weight of the package and the name of the contractor with a distinctive number of mark sufficient for the purpose of identification. All markings shall be carried out with such material as may be found satisfactory by the inspecting officer as regard quickness of drying, fastness and indelibility. 7.4 Materials & Equipment meant for each station shall be packed in separate boxes and marked with the name of station, consignee and railway. 7.5 The inspecting officer may reject the stores if the stores are not packed and/or marked as aforesaid and in case where the packing materials are separately prescribed, if such materials are not in accordance with the terms of the contract. Such rejection of the stores by the Inspecting Officer shall be binding on the Contractor. 7.6 Each bale or package shall contain note specifying the name and address of the Contractor the number and date of the acceptance of tender and the designation of the Controlling officer. 8 8.1 8.2 SUPPLY AND CUSTODY OF MATERIAL All materials are supplied by the contractor to the stores Sr. Section Engineer/IRPMU/ North Central Railway /Kanpur. The contractor shall be entirely responsible and shall bear all expenses towards loading, transport, handling and unloading for all materials equipment, machines, tools and plants etc. from the source of supply to the site. The responsibility for damage to any equipment during transportation and till it is taken over by Railways shall be that of the contractor. 9 FUTURE DEVELOPMENT The contractor shall supply to the railway free of charge all update, data and specifications that may result from developments effected by him or his collaborator in the period of currency of contract. The Railway reserves the right for such modified or improved versions in lieu of Signature of contractor Page 20 of 104 Dy CSTE/Proj/IRPMU/CNB

these originally quoted for, based on prices and other conditions mutually agreed upon. 10 PAYMENT TERMS: 10.1 "On Account Payment" will be made in following manner: For Schedule-A 1) 70% on supply of material. 2) Balance 30% on installation and commissioning as per RDSO schematic guidelines. For Schedule-B 1) 70% on issue of FAT certificate for software and approval of interface circuit by Railway for item no.1/9 & 2/8 respectively 2) 30 % on submission of final documents after commissioning 3) For other items on Account payment will be made after commissioning of work. For Schedule-C 4) 90% on supply of material 5) 10% after commissioning. . 10.2 Until the final certificate shall have been issued, the Contractor or his duly authorised representatives, whose names shall have previously been communicated in writing to the Railway with permission from Railway shall be given right of entry at his own risk and expenses at all reasonable working hours upon all necessary parts of the works for the purpose of inspecting the working and the records of the system and taking notes there from and, if he desires at his own risk and expense, making any test subject to the approval f the Railway which shall not be unreasonably withheld. 11 12 13 Tender Bid The tender bid shall be submitted in sealed covers as under in time within the last date of tender submission in the sealed Tender Box to be kept for the purpose in the office of Dy CSTE/Project/IRPMU/N. C. Railway, Near Jhakarkatti Bus Station, G.T.Road Kanpur. The details to be included with the bid are given in Para 6 of `Instructions to Tenderer and Conditions of Tendering'. LAST DATE OF SUBMISSION: The Tender shall be received up-to 14:00 hrs on 31.5.2012 Dy CSTE/Project/IRPMU/N. C. Railway, Near Jhakarkatti Bus Station, G.T. Road Kanpur. If the date of submission of tender becomes holiday than the tender can be submitted on the next working day upto the same time. THE LIST OF ADDRESS TO WHICH CORRESPONDENCE AND DOCUMENTS RELATING TO THE CONTRACT SHOULD BE SENT. Dy CSTE/Project/IRPMU/N. C. Railway, Near Jhakarkatti Bus Station, G.T. Road Kanpur. Signature of contractor Page 21 of 104 Dy CSTE/Proj/IRPMU/CNB

these orig<strong>in</strong>ally quoted for, based on prices and other conditions mutually agreed upon.<br />

10 PAYMENT TERMS:<br />

10.1 "On Account Payment" will be made <strong>in</strong> follow<strong>in</strong>g manner:<br />

For Schedule-A<br />

1) 70% on supply of material.<br />

2) Balance 30% on <strong>in</strong>stallation and commission<strong>in</strong>g as per RDSO schematic guidel<strong>in</strong>es.<br />

For Schedule-B<br />

1) 70% on issue of FAT certificate for software and approval of <strong>in</strong>terface<br />

circuit by Railway for item no.1/9 & 2/8 respectively<br />

2) 30 % on submission of f<strong>in</strong>al documents after commission<strong>in</strong>g<br />

3) For other items on Account payment will be made after commission<strong>in</strong>g<br />

of work.<br />

For Schedule-C<br />

4) 90% on supply of material<br />

5) 10% after commission<strong>in</strong>g.<br />

.<br />

10.2 Until the f<strong>in</strong>al certificate shall have been issued, the Contractor or his duly authorised<br />

representatives, whose names shall have previously been communicated <strong>in</strong> writ<strong>in</strong>g to the<br />

Railway with permission from Railway shall be given right of entry at his own risk and<br />

expenses at all reasonable work<strong>in</strong>g hours upon all necessary parts of the works for the purpose<br />

of <strong>in</strong>spect<strong>in</strong>g the work<strong>in</strong>g and the records of the system and tak<strong>in</strong>g notes there from and, if he<br />

desires at his own risk and expense, mak<strong>in</strong>g any test subject to the approval f the Railway<br />

which shall not be unreasonably withheld.<br />

11<br />

12<br />

13<br />

Tender Bid<br />

The tender bid shall be submitted <strong>in</strong> sealed covers as under <strong>in</strong> time with<strong>in</strong> the last date<br />

of tender submission <strong>in</strong> the sealed Tender Box to be kept for the purpose <strong>in</strong> the office<br />

of Dy CSTE/Project/IRPMU/N. C. Railway, Near Jhakarkatti Bus Station, G.T.Road<br />

Kanpur. The details to be <strong>in</strong>cluded with the bid are given <strong>in</strong> Para 6 of `Instructions to<br />

Tenderer and Conditions of Tender<strong>in</strong>g'.<br />

LAST DATE OF SUBMISSION:<br />

The Tender shall be received up-to 14:00 hrs on 31.5.2012 Dy CSTE/Project/IRPMU/N. C.<br />

Railway, Near Jhakarkatti Bus Station, G.T. Road Kanpur. If the date of submission of<br />

tender becomes holiday than the tender can be submitted on the next work<strong>in</strong>g day upto<br />

the same time.<br />

THE LIST OF ADDRESS TO WHICH CORRESPONDENCE AND DOCUMENTS RELATING TO THE<br />

CONTRACT SHOULD BE SENT.<br />

Dy CSTE/Project/IRPMU/N. C. Railway, Near Jhakarkatti Bus Station, G.T. Road Kanpur.<br />

Signature of contractor Page 21 of 104 Dy CSTE/Proj/IRPMU/CNB