the draw<strong>in</strong>gs/documents. The entire work <strong>in</strong>clud<strong>in</strong>g supply should be completed with<strong>in</strong> 10<br />

months of the issue of the letter of Acceptance.<br />

6 INSPECTION AND TEST<br />

6.1 Inspection of the material used for draw<strong>in</strong>gs/documents will be consignee. The Indian Railway<br />

Project Management Unit shall nom<strong>in</strong>ate the Inspect<strong>in</strong>g Officers.<br />

7 PACKING AND FORWARDING<br />

7.1 The contractor shall pack at his own cost the stores sufficiently and properly for transit by<br />

rail/road, air and/or sea as provided <strong>in</strong> the contract so as to ensure their be<strong>in</strong>g free from loss or<br />

damage on arrival at their dest<strong>in</strong>ation.<br />

7.2 All conta<strong>in</strong>ers (<strong>in</strong>clud<strong>in</strong>g pack<strong>in</strong>g cases, boxes, t<strong>in</strong>s, drums and wrapp<strong>in</strong>gs) <strong>in</strong> which the<br />

contractor supplies the stores shall be considered as non-returnable and their cost as deemed to<br />

have been <strong>in</strong>cluded <strong>in</strong> the contract price.<br />

7.3 The Contractor at his own expense shall mark each bale or package delivered under the<br />

contract. Such mark<strong>in</strong>g shall be dist<strong>in</strong>ct (all previous irrelevant mark<strong>in</strong>g be<strong>in</strong>g carefully<br />

obliterated) and shall clearly <strong>in</strong>dicate the description and quantity of the stores, the name and<br />

address of the consignee, the gross weight of the package and the name of the contractor with a<br />

dist<strong>in</strong>ctive number of mark sufficient for the purpose of identification. All mark<strong>in</strong>gs shall be<br />

carried out with such material as may be found satisfactory by the <strong>in</strong>spect<strong>in</strong>g officer as regard<br />

quickness of dry<strong>in</strong>g, fastness and <strong>in</strong>delibility.<br />

7.4 Materials & Equipment meant for each station shall be packed <strong>in</strong> separate boxes and marked<br />

with the name of station, consignee and railway.<br />

7.5 The <strong>in</strong>spect<strong>in</strong>g officer may reject the stores if the stores are not packed and/or marked as<br />

aforesaid and <strong>in</strong> case where the pack<strong>in</strong>g materials are separately prescribed, if such materials<br />

are not <strong>in</strong> accordance with the terms of the contract. Such rejection of the stores by the<br />

Inspect<strong>in</strong>g Officer shall be b<strong>in</strong>d<strong>in</strong>g on the Contractor.<br />

7.6 Each bale or package shall conta<strong>in</strong> note specify<strong>in</strong>g the name and address of the Contractor the<br />

number and date of the acceptance of tender and the designation of the Controll<strong>in</strong>g officer.<br />

8<br />

8.1<br />

8.2<br />

SUPPLY AND CUSTODY OF MATERIAL<br />

All materials are supplied by the contractor to the stores Sr. Section Eng<strong>in</strong>eer/IRPMU/ North<br />

Central Railway /Kanpur.<br />

The contractor shall be entirely responsible and shall bear all expenses towards load<strong>in</strong>g,<br />

transport, handl<strong>in</strong>g and unload<strong>in</strong>g for all materials equipment, mach<strong>in</strong>es, tools and plants etc.<br />

from the source of supply to the site. The responsibility for damage to any equipment dur<strong>in</strong>g<br />

transportation and till it is taken over by Railways shall be that of the contractor.<br />

9<br />

FUTURE DEVELOPMENT<br />

The contractor shall supply to the railway free of charge all update, data and specifications that<br />

may result from developments effected by him or his collaborator <strong>in</strong> the period of currency of<br />

contract. The Railway reserves the right for such modified or improved versions <strong>in</strong> lieu of<br />

Signature of contractor Page 20 of 104 Dy CSTE/Proj/IRPMU/CNB