4.3 a) The tenderer(s) should submit the details of experience <strong>in</strong> works of similar nature <strong>in</strong><br />

follow<strong>in</strong>g proforma –<br />

List of Works Completed<br />

Descrip<br />

tion of<br />

Work<br />

Organizati<br />

on for<br />

whom<br />

executed<br />

Approx.<br />

value of<br />

contract at the<br />

time of award<br />

Date<br />

of<br />

award<br />

Date of<br />

scheduled<br />

completio<br />

n of work<br />

Date of actual<br />

Start<br />

Comple<br />

tion<br />

F<strong>in</strong>al value<br />

of contract<br />

List of Works <strong>in</strong> Hand<br />

Description of<br />

work<br />

Contract Value<br />

Approx. value of<br />

balance work yet to be<br />

done<br />

Date of Award<br />

4.4 The tenderer shall provide a satisfactory evidence acceptable to the Railway to show that he or<br />

his consortium/collaboration partner –<br />

Not applicable<br />

4.5 Further <strong>in</strong>formation regard<strong>in</strong>g capacity and capability, if required by the Railway, shall be<br />

promptly furnished by the tenderer and he would offer all facilities to representative of<br />

Railway for assess<strong>in</strong>g capacity and capability by visit to his works/office.<br />

4.6 Offer of the tenderer(s) not submitt<strong>in</strong>g the requisite <strong>in</strong>formation is liable to be ignored.<br />

4.7 The tenderer(s) shall have adequate telecom facilities, computer and data network facilities,<br />

transport arrangement, construction mach<strong>in</strong>eries, tools and plants etc. for smooth execution of<br />

the project.<br />

4.8 The tenderer (s) shall furnish such documents as to establish the f<strong>in</strong>ancial soundness of his<br />

company.<br />

5 Supply Schedule<br />

The time schedule for the entire work is of utmost importance. The entire work is required to<br />

be fully completed with<strong>in</strong> 10 months from date of issue of Letter of Acceptance (LOA).<br />

5.1 The broad time schedule<br />

Every Month M<strong>in</strong>imum 2 set of draw<strong>in</strong>gs/documents to commission the station must be<br />

submitted for approval.<br />

5.2 The contractor shall depute adequate no. of competent Eng<strong>in</strong>eers / qualified staff to complete<br />

Signature of contractor Page 19 of 104 Dy CSTE/Proj/IRPMU/CNB