Wir<strong>in</strong>g <strong>in</strong> relays hous<strong>in</strong>g shall be uniform for like apparatus through out the <strong>in</strong>stallation.<br />

Wir<strong>in</strong>g <strong>in</strong>side rack for relays plug <strong>in</strong> type (Metal to Carbon) shall be done with " PVC<br />

<strong>in</strong>sulated unsheathed flame retard<strong>in</strong>g type s<strong>in</strong>gle core flexible wire1100V grade hav<strong>in</strong>g<br />

l6/0.2mm annealed copper conductor and nom<strong>in</strong>al cross sectional area of 0.5 Sq. mm of<br />

common colour code to the specification IS: 694".For wir<strong>in</strong>g these relays the above wires shall<br />

be term<strong>in</strong>ated on eyelet /lugs of standard design.<br />

After test<strong>in</strong>g, the loose wires on the cable ladder shall be neatly bunched and laced with tw<strong>in</strong><br />

black. The contractor shall adopt suitable colour code for wir<strong>in</strong>g as required by the Eng<strong>in</strong>eer<br />

<strong>in</strong>-charge. Spare conductors to an extent of 10% are to be provided on the <strong>in</strong>terconnect<strong>in</strong>g wire<br />

runs for future developments <strong>in</strong> case of multi-core cable are used.<br />

After the complete test<strong>in</strong>g by the Eng<strong>in</strong>eer <strong>in</strong>-charge and before commission<strong>in</strong>g the<br />

<strong>in</strong>stallation, the contractor shall arrange necessary seal<strong>in</strong>g leads and wires for seal<strong>in</strong>g the<br />

relays.<br />

The nomenclature of each relay shall be pa<strong>in</strong>ted both <strong>in</strong> front and rear side of each relay with<br />

contact configuration. The relay <strong>in</strong>dex sheet duly pa<strong>in</strong>ted of details of relay and their position<br />

<strong>in</strong> the relay rack shall be manufactured out of Decolum /Nova pan sheet and fixed <strong>in</strong> the relay<br />

room. All the relays to be plugged shall be checked visually and defect if any, noticed shall be<br />

replaced, duly report<strong>in</strong>g the same to the Railways. As made relay rack wir<strong>in</strong>g and contact chart<br />

of all relays shall be prepared <strong>in</strong> l<strong>in</strong>en/polyester sheets, duly signed and handed over to<br />

Railways for preparation of hand<strong>in</strong>g -over documents to ma<strong>in</strong>tenance organisation.<br />

Suitable arrangements shall be made <strong>in</strong> the relay rack for fix<strong>in</strong>g condenser and resistance<br />

unit, required for slow to release feature. Letter pa<strong>in</strong>t<strong>in</strong>g shall be made aga<strong>in</strong>st each unit to<br />

identify circuit for which it is used.<br />

3.2.2 Test<strong>in</strong>g and commission<strong>in</strong>g consists of f<strong>in</strong>al test<strong>in</strong>g of selection circuits, test<strong>in</strong>g of cables,<br />

test<strong>in</strong>g of track circuits, po<strong>in</strong>ts, signals as per SEM, and f<strong>in</strong>al commission<strong>in</strong>g of the entire<br />

signall<strong>in</strong>g arrangements for traffic use. All the alterations for improv<strong>in</strong>g safety shall be<br />

carried out before commission<strong>in</strong>g as required by the Railways. The contractor shall first test<br />

the equipment at his own level, followed by test<strong>in</strong>g done jo<strong>in</strong>tly with Railways. Test<strong>in</strong>g<br />

charges will be borne by the contractor. The contractor shall provide test panel for test<strong>in</strong>g at<br />

his own cost. The different stages and procedures for test<strong>in</strong>g of <strong>in</strong>door under outdoor<br />

equipment are given below as guidance.<br />

Stage I: Test<strong>in</strong>g of the <strong>in</strong>terlock<strong>in</strong>g<br />

- Wire to wire bell-test of all sheets before solder<strong>in</strong>g and after solder<strong>in</strong>g/wire<br />

count test.<br />

- Plugg<strong>in</strong>g of all relays as per contact configuration.<br />

Stage II: Test<strong>in</strong>g of the outdoor gears.<br />

Stage III: Commission<strong>in</strong>g of system by connect<strong>in</strong>g the outdoor gears to the panel.<br />

Signature of contractor Page 17 of 104 Dy CSTE/Proj/IRPMU/CNB