36.4 The contractor shall have to co-ord<strong>in</strong>ate his work with other department’s i.e.<br />

electric <strong>in</strong>stallation Signal-<strong>in</strong>terlock<strong>in</strong>g work, which may be related to other<br />

contractors or done departmentally, No claim of any k<strong>in</strong>d whatsoever shall be<br />

enterta<strong>in</strong>ed if the execution of any such work be<strong>in</strong>g also done by the<br />

department/contractor is held up due to their <strong>in</strong>terference or as a result of delay<br />

<strong>in</strong> any of these works.<br />

36.5 The tender/s should note that any person such as Eng<strong>in</strong>eer of the Gazetted rank<br />

and other Gazetted Officer whether <strong>in</strong> execution or Adm<strong>in</strong>istrative duties <strong>in</strong> the<br />

Eng<strong>in</strong>eer<strong>in</strong>g Department, if pension-able or non-pension-able are not allowed to<br />

work as contractor/employee with<strong>in</strong> two years of his/their retirement without<br />

proper approval of the competent authority. If any one found work<strong>in</strong>g as<br />

contractor or as employees of the contractor without prior approval of the<br />

competent authority, shall be liable to be rejected/term<strong>in</strong>ated for breach of the<br />

tender conditions.<br />

36.6 The Railway shall not be responsible any loss damage to contractor’s men,<br />

materials, equipment’s and plants etc, from any cause whatsoever.<br />

36.7 If any work (Whether temporary or permanent) or other material, the value of<br />

which has been <strong>in</strong>cluded <strong>in</strong> on account bills is destroyed or damaged or has/have<br />

for any other reasons to be replaced or restored by contractor, the value of the<br />

work or other materials. Destroyed may be recovered at any time from the<br />

contractor as debit due, provided always that no omission to deduct any amount<br />

due to the contractor and no payment made by the Railway to the contractor after<br />

the aforesaid amount become due and recoverable shall on any way prejudice or<br />

effect the right of the Railway to make such deductions at any time or otherwise<br />

to recover the amount as debit due.<br />

36.8 No claim for extra payment shall be enterta<strong>in</strong>ed on account of <strong>in</strong>terruption to<br />

work on Railway account what so ever.<br />

36.9 The work will have to be done <strong>in</strong> close Co-operation with the other<br />

departments/Agencies, if any.<br />

36.10 The rates for Non-Schedule items occurr<strong>in</strong>g dur<strong>in</strong>g the course of execution shall<br />

be payable after approval of the competent authority whose decision shall be<br />

f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor/s.<br />

36.11 The plan and sites are subject to alterations to suit the local conditions as<br />

requirement of the Railway and the contractors will have no claim on account of<br />

the change <strong>in</strong> plan and sites etc.<br />

36.12 Any sum or sums of money due and payable to the contractor <strong>in</strong>clud<strong>in</strong>g the<br />

security deposits returnable to him under the contract may be with held or<br />

reta<strong>in</strong>ed by way or lien by the Eng<strong>in</strong>eer aga<strong>in</strong>st any claim of this or any other<br />