Verify the register record<strong>in</strong>g the daily particulars of T&P Equipment &<br />

Mach<strong>in</strong>ery with the contractor is be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed.<br />

17) Daily Progress Register: –<br />

Verify whether the Daily Progress Register is ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong>dicat<strong>in</strong>g<br />

quantum of work executed and whether approved work programme is<br />

be<strong>in</strong>g adhered to.<br />

18) Safety Assurance Register: –<br />

Verify whether the Safety Assurance Register as per extant <strong>in</strong>struction is<br />

be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed & safety procedure & rules are be<strong>in</strong>g adhered to.<br />

19) Other Registers & Records: –<br />

36.0 GENERAL<br />

Other relevant records, registers perta<strong>in</strong><strong>in</strong>g to works and tests reports etc.<br />

as specified <strong>in</strong> contract specification and guide l<strong>in</strong>es.<br />

36.1 The contractor/s is required to complete the works with<strong>in</strong> the specified period as<br />

provided <strong>in</strong> each Agreement/work order. Dy. Chief Eng<strong>in</strong>eer is empowered to<br />

grant extension to the specified period provided <strong>in</strong> the work order, fail<strong>in</strong>g with<strong>in</strong><br />

the f<strong>in</strong>ancial limits of the powers dur<strong>in</strong>g the currency of the contract, if considered<br />

the same as justified or with penalty as per General Condition of Contract 2005<br />

Edition.<br />

36.2 Every possible fluctuation <strong>in</strong> the market rates of labour, material & General<br />

conditions and other possibilities of such and every k<strong>in</strong>d should be considered<br />

before quot<strong>in</strong>g the rates and no claim due to any reasons whatsoever on this<br />

account will be enterta<strong>in</strong>ed after wards sales tax or any other tax, levied or<br />

liveable by the central or sales tax or any other taxes of State Govt. or local<br />

bodies, shall be borne by the contractor which should also be kept <strong>in</strong> view before<br />

tender<strong>in</strong>g, no such taxes on contractor’s labour and materials will be paid by the<br />

Railway.<br />

36.3 The contractor will be required to give no claim certificate at the time of sign<strong>in</strong>g<br />

the f<strong>in</strong>al bill/ thus no claim certificate furnished by the contractor constitute<br />

special agreement under which contractor admits and acknowledged that no<br />

money is due to him <strong>in</strong> connection with execut<strong>in</strong>g of the particular contract by<br />

him. The contractor cannot turn round and ask for any more payment even if<br />

post audit records show that he had been paid less, hence after no claim<br />

certificate is given, the contractor cannot even ask for arbitration.<br />

OS/Works 69