Verify the register record<strong>in</strong>g the daily particulars of T&P Equipment &<br />
Mach<strong>in</strong>ery with the contractor is be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed.<br />
17) Daily Progress Register: –<br />
Verify whether the Daily Progress Register is ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong>dicat<strong>in</strong>g<br />
quantum of work executed and whether approved work programme is<br />
be<strong>in</strong>g adhered to.<br />
18) Safety Assurance Register: –<br />
Verify whether the Safety Assurance Register as per extant <strong>in</strong>struction is<br />
be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed & safety procedure & rules are be<strong>in</strong>g adhered to.<br />
19) Other Registers & Records: –<br />
36.0 GENERAL<br />
Other relevant records, registers perta<strong>in</strong><strong>in</strong>g to works and tests reports etc.<br />
as specified <strong>in</strong> contract specification and guide l<strong>in</strong>es.<br />
36.1 The contractor/s is required to complete the works with<strong>in</strong> the specified period as<br />
provided <strong>in</strong> each Agreement/work order. Dy. Chief Eng<strong>in</strong>eer is empowered to<br />
grant extension to the specified period provided <strong>in</strong> the work order, fail<strong>in</strong>g with<strong>in</strong><br />
the f<strong>in</strong>ancial limits of the powers dur<strong>in</strong>g the currency of the contract, if considered<br />
the same as justified or with penalty as per General Condition of Contract 2005<br />
Edition.<br />
36.2 Every possible fluctuation <strong>in</strong> the market rates of labour, material & General<br />
conditions and other possibilities of such and every k<strong>in</strong>d should be considered<br />
before quot<strong>in</strong>g the rates and no claim due to any reasons whatsoever on this<br />
account will be enterta<strong>in</strong>ed after wards sales tax or any other tax, levied or<br />
liveable by the central or sales tax or any other taxes of State Govt. or local<br />
bodies, shall be borne by the contractor which should also be kept <strong>in</strong> view before<br />
tender<strong>in</strong>g, no such taxes on contractor’s labour and materials will be paid by the<br />
Railway.<br />
36.3 The contractor will be required to give no claim certificate at the time of sign<strong>in</strong>g<br />
the f<strong>in</strong>al bill/ thus no claim certificate furnished by the contractor constitute<br />
special agreement under which contractor admits and acknowledged that no<br />
money is due to him <strong>in</strong> connection with execut<strong>in</strong>g of the particular contract by<br />
him. The contractor cannot turn round and ask for any more payment even if<br />
post audit records show that he had been paid less, hence after no claim<br />
certificate is given, the contractor cannot even ask for arbitration.<br />