01.02.2015 Views

Tender Document - irpmu.railnet.gov.in

Tender Document - irpmu.railnet.gov.in

Tender Document - irpmu.railnet.gov.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A PERT CHART hard copy <strong>in</strong> A-2 size must be available at site which<br />

should be same as submitted at the time of bid document<br />

9) Inspection Register: –<br />

The records of <strong>in</strong>spect<strong>in</strong>g officers are ma<strong>in</strong>ta<strong>in</strong>ed and <strong>in</strong>structions issued<br />

by them have been noted & compliance reported by railway representative<br />

& contractor or his authorized representative.<br />

10) Eng<strong>in</strong>eer Draw<strong>in</strong>g Register: –<br />

Verify whether the register record<strong>in</strong>g the receipt & issue of Eng<strong>in</strong>eer<strong>in</strong>g<br />

Draw<strong>in</strong>gs approved by competent authority is be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed &<br />

approved draw<strong>in</strong>gs for execution are available at site is good work<strong>in</strong>g<br />

condition.<br />

11) Temporary Arrangement Draw<strong>in</strong>g:–<br />

Verify & ensure that Temporary Arrangement Draw<strong>in</strong>gs, Formwork, False<br />

work, Stag<strong>in</strong>g, Centr<strong>in</strong>g & Shutter<strong>in</strong>g etc draw<strong>in</strong>gs approved by eng<strong>in</strong>eer<br />

XEN/Dy. C.E Are available at site & adhered to for execution.<br />

12) Bar Bend<strong>in</strong>g Schedule;–<br />

Verify the Bar Bend<strong>in</strong>g Schedule accord<strong>in</strong>g details of re<strong>in</strong>forcement steel,<br />

authorized overlaps etc. as approved by eng<strong>in</strong>eer viz XEN/ Dy.CE is<br />

available at site and be<strong>in</strong>g adhered to.<br />

13) Technical Register: –<br />

Giv<strong>in</strong>g technical features/details of site and work & modifications.<br />

14) Hidden work Register :–<br />

Verify whether the hidden work register is be<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong>clud<strong>in</strong>g<br />

details of work executed quantity & quality and reference to measurement<br />

recorded & test checks <strong>in</strong> MBs etc.<br />

15) Obstruction Register: –<br />

Verify the register record<strong>in</strong>g the daily event/activity which has affected<br />

obstruction to the work execution & work progress viz Break down of T&P.<br />

Lack of manpower resources manpower and/or materials, Nature effect<br />

ra<strong>in</strong>s/flood etc or any other unusual occurrence.<br />

16) Tools, Plant, Equipment & Mach<strong>in</strong>ery Register: –<br />

OS/Works 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!